PLANNED MAJOR LANE CLOSURE UPDATE  NOVEMBER 10, 2022

MDOT SHA Logo

MDOT SHA Logo

All work is weather dependent         
Real-time travel conditions and live traffic cameras –www.md511.maryland.gov 
     
    
Weekend                     
Baltimore County/Harford County line      
 
US 40 Dual Bridges over Little Gunpowder Falls and (Big) Gunpowder Falls -Bridge rehabilitation – Single-lane closures possible on US 40 in the vicinity of the four bridges on Saturday, Nov. 5. Eastbound US 40: 7 a.m.  to 4 p.m. Westbound US 40: 8 a.m. to 4 p.m.   

Baltimore County 
I-695 Eastbound (Beltway Inner Loop) from MD 41 (Perring Pkwy.) to MD 147 (Harford Rd.)  – Highway Maintenance Roadside Tree and Brush Trimming and Debris Removal – Single right lane and shoulder closure along I-695 Inner Loop on Sunday, November 13 between 6 a.m. and 2 p.m. New 



I-695 Outer Loop near MD-140 (TSMO) – Temporary barrier placement - Single and double lane closures 8 p.m. on Sunday, November 13,  to 5 a.m. Thursday, November 17.  New 


I-695 Inner/Outer loop from US 40 to MD 26 (TSMO) – Equipment staging –Single lane closure from 8 p.m. on Sunday, November 13 to 5 a.m. Thursday, November 17. New 


Frederick County  

I-70 at MD 75 (Green Valley Road) – Bridge deck demolition – Single lane closure on I-70 overnight during the following hours:   
Saturdays from midnight to 11 a.m. (November 12)   
Daytime Monday through Friday from 9 a.m. to 4 p.m.    
Overnight Sunday through Thursday from 10 p.m. to 5 a.m.    
Demolition work is expected to be complete in December.    


Week Ahead            
Anne Arundel County                
              
Northbound MD 10 between MD 270 and I-695 – Pavement Resurfacing - Single lane closures, 9 a.m. to 3 p.m. weekdays.    
MD 270 between MD 2 and MD 648 – Pavement Resurfacing – Single lane closure with a flagging operation, 9 a.m. to 3 p.m. weekdays  
Northbound MD 295 ramp to eastbound MD 175 - Pipe installation - Overnight ramp closure starting at 9 p.m. Sunday, November 13, through the end of the week.  During the ramp closure, traffic will be redirected along northbound MD 295 to the ramp for westbound MD 175, then to southbound MD 295 and the ramp for eastbound MD 175.  New

   .              
Baltimore County       
           
MD 25 (Falls Road) between MD 128 (Butler Rd.) and MD 137 (Mt. Carmel Rd.) – Highway Maintenance Patching – Lane closures and flagging operation in place along sections of MD 25 weekdays 9 a.m. to 3 p.m. through December. Updated 


I-95 at I-695 – Southwest Interchange - Pre-construction shoulder work for multi-bridge rehabilitation project:    
Lane Closures:

  • Sunday, November 13 through Thursday, November 17: Northbound and Southbound I-95 at I-695 Interchange: Sunday, November 13 through Thursday, November 17; each night, there will be a single right-lane closure on southbound I-95 between Caton Avenue and I-195 beginning 7 p.m., with a double right-lane closure at 9 p.m., until 5 a.m. the next day. 
Ramp Closures:

  • Sunday, November 13: The ramp from southbound I-695 (Beltway Outer Loop) to northbound I-95 Exit 11A will be closed overnight Sunday, 8 p.m. to 5 a.m. the next morning for installation of concrete work zone traffic barrier. Detour: Motorists heading from southbound I-695 to northbound on I-95 will be directed to proceed on I-695 south past I-95 and turn right to Exit 9, Hollins Ferry Road. From there, turn left at next signal onto I-695 North (Inner Loop). Proceed on I-695 North past Exit 10, US 1 Alternate, to Exit 11A, I-95 North. 

  • Sunday, November 13 and Monday, November 14: The left exit ramp from southbound I-95 to eastbound I-695 (Outer Loop) Exit 49A will be closed overnight Sunday and Monday nights, 8 p.m. to 5 a.m. the next day, for asphalt paving. Detour: Prior to the I-695 interchange, motorists can take Exit 50A to southbound Caton Avenue, and proceed on southbound Caton Avenue to southbound US 1 Alt. (Washington Blvd.), then continue to US 1 Alt. to a left-turn at traffic signal to the ramp to eastbound I-695.  


  • Wednesday, November 16 and Thursday, November 16: The right exit ramp from northbound I-95 to eastbound I-695 (Outer Loop) Exit 49A will be closed overnight Wednesday and Thursday nights, 8 p.m. to 5 a.m. the next day, for asphalt paving. Detour:  Proceed on northbound I-95 past I-695 to Exit 50B, Caton Avenue North.  Proceed through the interchange to Caton Avenue North, stay left on Caton Avenue North to take the left-turn ramp to southbound I-95 and then proceed southbound I-95 back to Exit 49 A left exit ramp to eastbound I-695 (Outer Loop) to Glen Burnie.  Updated 
 
 
I-695 West (Baltimore re Beltway Outer Loop) from MD 146 (Dulaney Valley Road) to I-83 South (Jones Falls Expressway) - Interstate pavement patching - Overnight single and double lane closures between 8 p.m. and 5 a.m. the next morning, Sundays through Thursdays, through late fall 2022.      
     
MD 25 (Falls Rd.) from MD 128 (Butler Rd./Belfast Rd.) to MD 137 (Mt. Carmel Rd.) – Highway Maintenance Pavement Patching – Starting Monday, October 24, crews will have a flagging operation in place weekdays 9 a.m. to 3 p.m. through December 2022.   
  
MD 41 (Perring Parkway) from Joppa Road to Waltham Woods Road - Highway maintenance pavement resurfacing - Overnight single lane closures and flagging operations between 9 p.m. and 5 a.m. the next morning, Sundays through Thursdays through fall 2022.      
      
MD 26 (Liberty Rd.) from I-695 to North Rolling Rd. – ADA Sidewalk Improvements - Overnight single lane closures along this section of Liberty Road Sundays through Thursdays between 9 p.m. and 5 a.m. the following morning.  Daytime single lane closures on this section of Liberty Road possible Mondays through Fridays between 9 a.m. and 12:30 p.m. through late fall 2022.       
       
MD 137 (Mt. Carmel Rd.) from MD 25 (Falls Rd.) to Cedar Grove Rd. – Highway Maintenance pavement milling, patching and resurfacing – Daytime temporary lane closures and flagging operations between 9 a.m. and 3 p.m. Monday – Friday through late fall 2022.        
                     
MD 138 (Troyer Road) and MD 562 (Troyer Rd./Old York Rd.) - Highway Maintenance pavement patching on 2 sections: 1) MD 138 (Troyer Rd.) north of the MD 138 (Shepperd Rd.) / MD 562 (Troyer Rd.) intersection to the Harford County line just east of Hunters Mill Rd. Followed by 2) MD 562 (Troyer Rd./Old York Rd.) from south of the MD 138 (Shepperd Rd.) intersection to Markoe Road. The patching work on MD 138 and MD 562 will take place between 9 p.m. and 5 a.m. the next day, Sundays through Thursdays through late fall 2022.        
     
MD 138 (Monkton Road) from the Gunpowder River Bridge to MD 45 (York Road) - Highway Maintenance pavement patching between 9 a.m. and 3 p.m. Monday – Friday through late November 2022.        
      
MD 542 (Loch Raven Boulevard) from Taylor Avenue to Joppa Road - Highway maintenance pavement patching with overnight single lane closures and flagging operations between 9 p.m. and 5 a.m. the next morning, Sundays through Thursday through late fall 2022.        
  
  
Calvert County       
    
MD 4 at Mount Harmony Road – Median closure and crossover work for intersection reconstruction - Daytime single lane closure along northbound and southbound MD 4 between 9 a.m. and 3 p.m. if needed.  
    
    
Carroll County               
    
MD 30 (Hanover Pike/Hampstead Bypass) between Basler Rd and Baltimore Co line – Highway maintenance project – Single lane closure and flagging operation starting Monday, November 14. Work schedule is Monday through Friday from 9 a.m. to 3 p.m. Project is expected to be complete by the end of the year. New 
        
Dorchester County                                       
US 50 from Old Ocean Gateway to MD 331 (Rhodesdale-Vienna Rd) - Structure replacement -Single lane and shoulder closures 6 a.m. - 6 p.m. through November.  
        
Frederick County    
          
MD 77 between Catoctin Hollow Road and the Frederick/Washington Co line (west of Brown Road) - Highway maintenance project - Single lane closures Monday to Friday from 8 a.m. to 4 p.m.  Crews are resurfacing the roadway.     
        
Harford County             
   
MD 24 (Vietnam Veterans Memorial Highway) from MD 924 (Tollgate Road/Emmorton Road) to MacPhail Road – Pavement Milling and Resurfacing – Overnight temporary single lane closures/traffic lane shifts on MD 24 northbound and southbound between 8 p.m. and 5 a.m. the next morning, Sundays through Thursdays through late fall.                                   
     
MD 136 (Whiteford Road) between Robinson Mill Road and Heaps Road – Highway Maintenance pavement milling patching and resurfacing – Occasional temporary overnight lane closures and flagging operations for final pavement marking between 8 p.m. and 5 a.m., Sundays – Thursdays through fall 2022.          
     
MD 543 (Creswell / Fountain Green Rd.) from I-95 to MD 136 (Calvary Rd.) – Highway Maintenance Pavement Patching – Overnight temporary lane closures and flagging operations between 9 p.m. and 5 a.m. the next day Sunday – Thursday through late fall 2022.                    
         
Montgomery & Prince George’s Counties                                                            
    
Purple Line – For a list of active construction and lane closures along the Purple Line alignment, please click HERE (MTA project).                         
     
St. Mary’s County                                    
    
MD 5 (Point Lookout Road) between Abell/Moakley Streets and MD 245 (Hollywood Road) - Single and/or double lane closures, Sundays through Thursdays, 8 p.m. to 5 a.m.                                     
    
MD 5 between Camp Brown Road and Scotland Beach Road – Weekday single lane closures between 7 a.m. and 4 p.m. for resurfacing along northbound MD 5.             
  
Wicomico County     
 
Eastbound US 50 from White Richardson Road to East of Bent Pine Road – Milling, patching, paving and striping operations - Double lane and shoulder closures with flagging operations weekdays 7 a.m. - 5:30 p.m. through November.   
 
               
Long-Term Closures                                   
     
Allegany County                           
 
I-68 (National Freeway) to Street Road - Crews will be patching, milling, and paving.  There will be daily closures both EB and WB.  Signs, barrels, and cones will be in place. Work times will vary between night work and daytime work. Weather permitting, this project is expected to be completed by mid-November.                                                           
 
Anne Arundel County                             
   
Southbound MD 2 (Ritchie Highway) between Cypress Creek Road and US 50 - Resurfacing - Overnight single Lane closures between 10 p.m. and 5 a.m., Sundays through Thursdays with temporary overnight ramp detours.      
    
Westbound US 50 between Oceanic Drive and MD 2 – Nighttime pavement resurfacing between 8 p.m. and 5:30 a.m., Monday nights – Friday nights.      
       
MD 2 between the South River bridge and MD 214: Pavement Resurfacing and sidewalk reconstruction between 8 p.m. and 5 a.m., Sunday through Thursday nights with lane closures.     
     
I-97 Northbound and Southbound between MD 450 and MD 178 – Pavement Patching – overnight single lane closures between 9 p.m. to 5 a.m., Sunday through Thursday nights. New    
                 
Baltimore County                
    
Raphael Road overpass of I-95 (JFK Memorial Expressway) - MDTA Reconstruction Project – MDTA closed the Raphael Road overpass as part of the  I-95 Express Toll Lanes (ETL) Northbound Extension project. The closure will be in place through early 2023 and traffic is being detoured to the Bradshaw Road overpass.             
     
I-70 Westbound between I-695 and the Patapsco River/Howard Co. Line – Asphalt Pavement Resurfacing and Safety Improvements – Single and double lane closures on westbound I-70 daytime Monday – Friday 9 a.m. to 3 p.m. and overnight Sunday – Thursday 7 p.m. to 5 a.m. the next day, through early 2023.  There will also be temporary overnight interchange ramp closures and detours for paving work Sunday – Thursday nights (posted in advance on digital message boards).                
         
I-70 Westbound and Eastbound between the Baltimore City Line and I-695 – Concrete Pavement Resurfacing – Single and double lane closures on I-70 east of I-695 weekdays Monday – Friday 9 a.m. to 3 p.m. and continuous lane and/or ramp closures on selected weekends for concrete pour and cure from 9 p.m. Friday through 5 a.m. Sundays, until early 2023.        
  
I-695 Bridge over US 40 (Baltimore National Pike) - Bridge support structure rehabilitation – Crews are working on repairs to bridge piers and abutments under I-695 with long-term traffic shifts and temporary lane closures on US 40 eastbound and westbound underneath I-695 in Catonsville through fall 2022.                       
 
US 40 (Pulaski Highway) Dual Bridges over Little Gunpowder Falls and (Big) Gunpowder Falls -Bridge rehabilitation –Construction work will proceed on all four bridges through spring 2023, with ongoing temporary single lane closures on eastbound and westbound US 40 in the vicinity of the bridges during the following off-peak times:  Daytime (Monday – Saturday) Westbound US 40: 8 a.m. to 4 p.m.  Eastbound US 40: 7 a.m.  to 4 p.m.  Overnight (Sunday – Thursday) Westbound and Eastbound US 40:  7 p.m. to 5 a.m. the next day. Possible Traffic Impact in Harford County.       
              
MD 25 (Falls Road) between Baltimore City / County Line and I-695 – Baltimore County DPWT water line replacement project - Overnight lane closures with flagging operations along sections of Falls Road, 9 p.m. - 5 a.m. the next day Sunday – Thursday, with some daytime work as needed 9 a.m. - 3 p.m. through spring 2024.       
                        
MD 26 (Liberty Road) between Brenbrook Drive and N. Rolling Road - ADA Sidewalk Reconstruction/Upgrades - Occasional temporary overnight single lane closures on MD 26 between 9 p.m. and 5 a.m. the next day Sunday - Thursday and now between 9 a.m. and 12:30 p.m. Monday - Thursday through early fall 2022.                          
                            
MD 30 (Hanover Pike) at Mt. Gilead Road – Intersection Improvements – New left turn lane from MD 30 northbound to Mt. Gilead Rd. open to traffic. Lane closures with flagging operations at intersection for installation of final pavement markings, reflective markers and guardrails 9 a.m. - 3 p.m. Monday through Friday through late November 2022. Updated     
                              
MD 43 (White Marsh Blvd.) at Honeygo Blvd. - Intersection Widening and Improvements - Temporary daytime lane closures on MD 43 and Honeygo Blvd. legs of the intersection between 9 a.m. and 3 p.m. Monday-Friday, and overnight lane closures at any time between 8 p.m. and 5 a.m. the next day Sunday-Thursday. When necessary, there will be temporary lane closures on weekends, 7 a.m. - 1 p.m. Saturday and/or Sunday through fall 2022.           
                                                           
MD 140 (Reisterstown Road) between I-695 and Mt. Wilson Lane/ Grey Rock Rd. with MD 140 at Hooks Lane - Americans with Disabilities Act (ADA) improvements - includes traffic signal upgrades, crosswalk markings, and paving on MD 140 and also on Hooks Lane at MD 140. Temporary daytime single lane closures on MD 140 between 9 a.m. and 3 p.m. Monday – Friday and overnight single lane closures on Hooks Lane approach to MD 140 between 9 p.m. and 5 a.m. the next morning Sunday – Thursday.     
                           
MD 140 (Reisterstown Rd.) between E. Pleasant Hill Rd. and Stocksdale Ave. –Resurfacing/County Water Main replacement - Daytime single lane closures Monday - Friday 9 a.m. - 3 p.m. between E. Pleasant Hill Rd and Stocksdale Ave.  Nighttime single lane closures within project limits Sunday – Thursday nights between 8 p.m. and 6 a.m. the next day. Access to driveways in this section will be maintained during any lane closures.  Project scheduled through late summer 2024.                   
                                            
     
MD 147 (Harford Road) / Joppa Road - Intersection Improvements - Daytime single lane closures and flagging operations on Harford and Joppa Roads in the vicinity of the intersection Monday – Thursday 9 a.m. - 4 p.m. Monday – Thursday and 9 a.m. - 3 p.m.  Fridays. Overnight work with lane closures Sunday – Thursday 9 p.m. - 5 a.m. the next day. Concrete median construction and final pavement milling and asphalt paving work on Joppa Road approaches to Harford Road fall 2022. Updated    
     
  
MD 151 (Sparrows Point Blvd.) / Wharf Road (MD 151 B) Interchange - Three-bridge replacement project at interchange – New traffic pattern in effect: Northbound Wharf Road is now open to traffic between MD 151 and MD 158 (Bethlehem Blvd.). One side of the existing MD 151 bridge over Wharf Rd. is closed, and two-way traffic runs on the other side of the bridge (one lane in each direction)  Traffic Alert: Southbound Wharf Road between MD 158 and left-turn ramp to MD 151 scheduled to re-open Wednesday afternoon, Nov. 16.  Interchange construction work scheduled through summer 2024. Updated           

            
                              
Cecil County                                                                                      
    
MD 213 (Augustine Herman Highway) bridge over C&D Canal in Chesapeake City – U.S. Army Corps of Engineers bridge repair project. Occasional single lane closures and flagging will occur 9 a.m. to 3 p.m., Monday-Thursday.       
                               
MD 279 (Elkton Road) at MD 277 (Fletchwood Road) – Northbound MD 279 is reduced to a single lane at the MD 277 intersection near the Delaware line and shifted across the median to a contraflow pattern (one lane in each direction).  This is part of the Delaware Department ​of Transportation (DelDot) reconstruction of route 279.                               
                        
Frederick County                                                  
     
Northbound US 15 Bridge over MD 77 – Bridge Deck replacement project – The right lane is closed. Each side of the bridge is expected to take six to eight months to finish. The entire project is expected to be complete by spring 2023.                                           
                     
Garrett County                               
     
MD 39 (Hutton Road) from Ashby Ellis to US 219 in Oakland – Drainage improvement and repaving project, flagging operation, 7 a.m. - 5 p.m. Monday-Friday                   
       
MD 42 (Friendsville Road) from the bridge over Buffalo Run to the Pennsylvania border -  Drainage improvements – Flagging operation – 7 a.m. - 7 p.m. Work is expected to continue through the construction season.         
       
Harford County                                                                      
     
MD 24 (Vietnam Veterans Memorial Highway) from Wheel Road to Singer Road – Highway resurfacing project - Temporary single lane closures and lane shifts between 8 p.m. and 5 a.m. the next morning, Sundays – Thursdays, until mid-fall 2022.      
        
Old Joppa Road Bridge over I-95 (MDTA project) – Bridge replacement project – Old Joppa Road closed and locally detoured.                                                                                
      
Howard County         
     
MD 94 bridge over I-70 - Bridge deck replacement project - Northbound MD 94 lane is closed.                      
                      
Montgomery County                                                          
    
MD 97 (Georgia Avenue) from north of Gold Mine Road to south of Holiday Drive - MD 97 relocation project. Intermittent off-peak single and multiple lane closures, weekdays, 8 a.m. to 4 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through year-end 2022.          
  
Brookeville Road from MD 97 (Georgia Avenue) to Grayheaven Manor Road. Sewer relocation project. Full 24/7 road closure with detour through late fall 2022. Drivers should add extra commute time and use MD 97 and MD 108 as alternate routes.          
  
Brighton Dam Road near MD 97 (Georgia Avenue). MD 97 relocation project excavation and new road resurfacing work. Off-road activity with an intermittent off-peak flagging operation and single lane closures, Sunday through Saturday from sunrise to sunset through year-end 2022.    
 
MD 108 (Olney Sandy Spring Road) from Olney Mill Road to Brooke Road. Safety and   resurfacing project. Off-peak single daytime lane closures , weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 8 p.n. to 5 a.m.  through late summer 2023.       
   
MD 185 (Connecticut Avenue) at Jones Bridge Road/Kensington Parkway Intersection improvement project - Single off-peak lane closures on MD 185, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. and single off-peak lane closures on Jones Bridge Road, weekdays, 9 a.m. to 3 p.m. and overnight, 7 days per week, 9 p.m. to 5 a.m. through late summer 2023.     
  
MD 187 (Old Georgetown Road) from Tilden Lane to Nicholson Lane/ Safety and resurfacing project. Off-peal single daytime weekday lane closures, 9 a.m. to 3 p.m. and overnight lane closures, Sunday through Thursday,  8 p.m. to 5 a.m. through year-end 2022.  
                 
Southbound I-270 between I-70 and I-495 (Capital Beltway) - Traffic congestion relief construction project - Intermittent single lane closures, weekdays, 10 a.m. to 3 p.m. and single, double, and triple overnight lane closures, Sunday through Thursday, 7 p.m. to 5 a.m. and intermittent temporary ramp closures with detours up to 24 hours a day through late summer 2023.                                                                      
          
Prince George’s County     
   
US 1 (Baltimore Avenue) College Avenue to MD 193 (University Boulevard) - US 1 Reconstruction Project - Corridor Improvement- Northbound and southbound single lane closures throughout the length of the project Saturday through Sunday, 10 a.m. to 4 p.m. and 9 p.m. tm. through late summer 2023.                
           
US 1 (Baltimore Avenue) from Rhode Island Avenue to MD 212A (Powder Mill Road). Safety and resurfacing project. Off peak single and multiple lane closures, weekdays, 9 a.m. to 3 p.m. through late summer 2023.            
            
US 1 (Rhode Island Avenue) from Charles Armentrout Drive to Farragut Street. Rhode Island Avenue Trolley Trail project. Single and multiple off-peak lane closures, weekdays, 9 a.m. to 3 p.m. through year-end 2023.     
          
MD 210 at Livingston Road/Kerby Hill Road. Interchange construction project. Intermittent   off-peak single and multiple lane closures, Monday through Saturday, 9 a.m.to 3 p.m. and overnight, Sunday through Thursday, 8 p.m.to 5 a.m. through late fall 2022.                                                                        
                   
MD 212A (Powder Mill Road) from Pine Street to US 1 (Baltimore Avenue) - Roadway reconstruction project. Intermittent single and multiple lane closures weekdays, 8 a.m. to 4 p.m. through late fall 2022.                         
                       
MD 223 (Woodyard Road) from Sherwood Drive to Victoria Drive - Sidewalk construction project - Off-peak lane closures, weekdays, 8:30 a.m. to 3:30 p.m. and Saturdays, 8 a.m. to 5 p.m. through late fall 2022.                        
                                 
MD 223 (Woodyard Road) at Dower House Road - Geometric improvement project - Single weekday lane closures, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through late fall 2022.    
                      
MD  500 (Queens Chapel Road) from Eastern Avenue to MD 208 (Hamilton Street) Community safety and enhancement project. Intermittent single and multiple lane closures weekdays,9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 7 p.m. to 6 a.m. through late fall 2022.    
                          
U S 1 (Baltimore Avenue) over I-495 (Capital Beltway) - Bridge painting and cleaning project. Single and multiple off-peak lane closures; 8 p.m. to 5 a.m. through year-end 2022.     
   
Talbot County                                                          
   
MD 33 (Talbot St.) from Spencer Ave. to Lee St. in St. Michaels - Sidewalk project. Occasional single-lane closures and flagging 9 a.m. to 3 p.m. Monday-Thursday through spring 2023.             
                                                     
St. Mary’s County                
   
MD 236 Resurfacing between MD 234 and MD 5 – Roadway resurfacing – daytime single lane closure with a flagging operation between 9 a.m. and 3 p.m.          
       
Northbound MD 235 (Three Notch Road) between Gate 1 and Gate 2 in Lexington Park – County DPW work – Single lane closure for sidewalk reconstruction – weekdays between 9 a.m. and 3 p.m.        
          
Washington County                 
    
Eastbound and westbound I-70 at the MD 65 (Sharpsburg Pike) – Bridge rehabilitation and widening of I-70 bridges over MD 65 –   motorists should expect periodic shoulder work and nighttime lane closures.       
    
 Westbound I-68 (National Freeway) between Mountain Road and MD 144 – Patching, milling, and paving. Expect overnight lane closures, nightly from 7 p.m. - 6 a.m. Sundays through Thursdays. Once westbound is completed work will begin eastbound.





###