PLANNED MAJOR LANE CLOSURE UPDATE FOR WEEKEND OF JUNE 10, 2022

MDOT SHA Logo

MDOT SHA Logo

​ All Work is Weather Dependent

Real-Time travel conditions and live traffic cameras md511.maryland.gov

Weekend

Baltimore County/Harford County line

  • US 40 Dual Bridges over Little Gunpowder Falls and (Big) Gunpowder Falls -Bridge rehabilitation – Single-lane closures possible on US 40 in the vicinity of the bridges on Saturdays through summer 2022.  Eastbound US 40: 7 a.m.  to 4 p.m. Westbound US 40: 8 a.m. to 4 p.m.  Updated
  • I-70 from Baltimore City Line to I-695 – Concrete pavement resurfacing – Single and double lane closures on I-70 east of I-695 weekdays Monday-Friday 9 a.m. to 3 p.m. and continuously on weekends for concrete pour and cure from 9 p.m. Friday through 5 a.m. Sundays, work will until early 2023. Updated

Week Ahead      

Anne Arundel County

  • MD 450 Bridge over College Creek – Daytime flagging operation on Monday, June 13 and Tuesday, June 14 between 9 a.m. and 3 p.m. for bridge maintenance. New

Baltimore County

  • US 40 (Pulaski Highway) Dual Bridges over Little Gunpowder Falls and (Big) Gunpowder Falls -Bridge rehabilitation – Traffic Pattern Change to remove split traffic pattern on eastbound and westbound US 40 bridges over “Big” Gunpowder Falls scheduled for Sunday night, June 12 and Monday night, June 13. The work will begin at 7 p.m. and end at 5 a.m. the next morning.  In case of inclement weather, the work will take place on the next possible night.  NEW
  • I-70 Westbound from I-695 to Patapsco River/Howard Co. Line – Pavement resurfacing and safety improvements – Single and double lane closures on westbound I-70 daytime Monday-Friday 9 a.m. to 3 p.m. and overnight Sunday-Thursday 7 p.m. to 5 a.m. the next day, through early 2023.  There will also be temporary overnight ramp closures for paving work Sunday – Thursday.  Updated    
  • I-70 from Baltimore City Line to I-695 – Concrete pavement resurfacing – Single and double lane closures on I-70 east of I-695 weekdays Monday-Friday 9 a.m. to 3 p.m. and continuously on weekends for concrete pour and cure from 9 p.m. Friday through 5 a.m. Sundays, until early 2023.   Updated    
  • US 1 (Belair Road) from I-695 to City Line Baltimore County – Baltimore County DPWT water line replacement project - Overnight lane closures along short sections of Belair Road for overnight roadway milling and patching, Monday-Thursday 9 p.m.-5 a.m. the next day through early June.   
  • Raphael Road overpass of I-95 (JFK Memorial Expy.) - MDTA Reconstruction – MDTA closed the Raphael Road overpass as part of the I-95 Express Toll Lanes (ETL) Northbound Extension project. The closure will be in place through early 2023 and traffic is being detoured to the Bradshaw Road overpass.   
  • US 40 (Pulaski Highway) Westbound from Campbell Boulevard to MD 700 (Martin Boulevard) – Roadway milling and resurfacing - Weekday single lane closures between 9 a.m. and 3 p.m. and overnight between 8 p.m. and 5 a.m. Sunday-Thursday through late June.  Updated
  • MD 7 (Philadelphia Road) from Ebenezer Road to New Forge Road - Roadway milling and patching – Weekday single lane closures with flagging operations, 9 a.m. to 3 p.m., through late June.   
  • MD 30 (Hanover Pike) at Mt. Gilead Road – Intersection Safety Operations Improvements –Daytime lane closures with flagging operations at intersection Monday through Friday, 9 a.m.-3 p.m. through fall 2022.   
  • MD 45 (York Road) Northbound near Boxwood Lane and southbound York Road near Sherwood Road / BGE Electric Reliability Project Spring 2022 - BGE will shift travel lanes to create two work zones around BGE manholes in roadway.  BGE will maintain two-way through traffic through the two work zones, BGE work will be 24/7 through late June 2022.
  • MD 140 (Reisterstown Rd.) at Hooks Lane – Intersection ADA Pedestrian Access Improvements – temporary lane closures on weekdays Monday-Friday between 9 a.m. and 3 p.m. and overnight Sunday-Thursday between 9 p.m. and 5 a.m. the next day.  Updated
  • MD 145 (Sweet Air Road) from east of MD 146 (Jarrettsville Pike) to Manor Rd.  - Highway maintenance pavement patching, milling, and resurfacing with temporary  lane closures and flagging operations on weekdays 9 a.m.-3 p.m. and Saturdays 6 a.m.-2 p.m. through late June.   
  • Ingleside Avenue underneath I-695 – ADA Sidewalk Upgrades – Temporary single-lane closures and flagging operations on Ingleside Avenue in the vicinity of the I-695 bridge on weekdays 9 a.m. to 3 p.m. until early summer.

Carroll County

  • MD 97 (New Washington Road) between MD 140 (Baltimore Boulevard) and the Fenby Park & Ride, south of MD 32 (Sykesville Road) - Highway patching and resurfacing project – Single lane closure and flagging operation overnight from 8 p.m. to 5 a.m. Sunday night through Friday morning. The project is expected to be complete in June.       
  • MD 27 (Ridge Road) between Waterville Road and Gillis Falls Road – Highway patching project – Flagging operation overnight Sunday night through Friday morning from 7 p.m. to 6 a.m. The project is expected to be complete in June.

Dorchester County

  • Woods Rd from US 50 to Chesapeake Dr – Utility work.  Double lane and shoulder closures weekdays 7 a.m. - 5 p.m. through July 15. New
  • US 50 East and West between Woods Rd and MD 16 (Church Creek Rd) - Utility Work. Lane and shoulder closures weekdays 7 a.m.-5 p.m. through July 29.

Frederick County

  • I-270/MD 85 (Buckeystown Pike) Interchange - Roadway widening – Crestwood Boulevard in both directions will be closed overnight between MD 85 and Westview Drive from 9 p.m. to 5 a.m. the following morning, Sunday, June 12 through Thursday, June 16. The following ramps will also see overnight closures:         
    • Northbound I-270 ramp to MD 85 (Sunday through Thursday).         
    • Northbound MD 85 ramp to northbound I-270 (Sunday and Wednesday nights).
    • Northbound MD 85 ramp to southbound I-270 (Wednesday and Thursday nights).
  • US 15 between Basford Road and the bridge over the Potomac River near the Maryland/Virginia line - Highway patching and resurfacing project - Single Lane closure during overnight mobile project. Crews working Sunday night through Friday morning from 7 p.m. to 5 a.m. The project includes the traffic circle at MD 464 (Point of Rocks Road). Completion is expected by June.          
  • MD 26 (Liberty Road) between Chestnut Grove Road and MD 75 (Green Valley Road) - Highway patching project – Weekdays from 8 a.m. to 4 p.m.           
  • MD 144 (East Patrick Street) between East Street and Quinn Orchard Road – Roadway improvements – Single-lane closures and a flagging operation in place weekdays, 9 a.m. to 3 p.m., through expected completion in June. New
  • MD 180 (Jefferson Pike) between Lander Road/Holter Road and the Mount Zion Road traffic circle – Highway patching and resurfacing project – Single lane closure and flagging operation Monday through Friday from 9 a.m. to 3 p.m. This project is expected to be complete in June.

Harford County

  • US 1 Hickory Bypass from US 1 Business to the northern “T” intersection with US 1 (Conowingo Road). - Highway pavement repair and resurfacing project – Weekday single lane closures between 9 a.m. and 3 p.m. Monday-Friday through late spring 2022.       
  • US 1 Business from the signalized intersection with US 1 Hickory Bypass and the northern “T” intersection with US 1 (Conowingo Road) – Highway maintenance pavement patching – Weekdays single lane closures 9 a.m. and 3 p.m. through late spring 2022.       
  • US 1 Business from MD 147 (Harford Rd.) to Tollgate Rd. - Highway pavement repair and resurfacing project – Overnight single lane closures between 8 p.m. and 5 a.m. the next day Sunday-Thursday through early June.       
  • MD 23 from MD 439 (Old York Road) to the Old York Road just south of MD 138 (Troyer Road) and north of the Jarrettsville Volunteer Fire Company – Highway maintenance pavement patching with temporary lane closures and flagging operations on weekdays between 9 a.m. and 3 p.m. through late June.       
  • MD 136 (Whiteford Rd.) from Robinson Mill Road to Heaps Road – Highway Maintenance pavement milling patching and resurfacing – Overnight lane closures and flagging operations between 8 p.m. and 5 a.m., Sunday-Thursday through late June.

Howard County

  • Westbound I-70 between westbound US 40 (Baltimore National Pike) merge ramp and MD 97 (Hoods Mill Road) - Highway patching and resurfacing project –  Single lane closure and exit ramp detours at MD 32 and MD 97 when crews are working in that area. The schedule is overnight from Sunday evening to Friday morning from 8 p.m. to 5 a.m. This project is expected to be complete by July.
  • MD 32 (Patuxent Freeway) between US 1 (Washington Boulevard) and the Howard/Anne Arundel Co line (south of Dorsey Run Road) – Guardrail upgrades – Single lane and shoulder closures as crews replace guardrail. The work schedule is Sunday night through Friday morning from 9 p.m. to 5 a.m. This project is expected to be complete in June.       
  • MD 108 (Clarksville Pike) between MD 32 (Patuxent Freeway) and the Howard/Montgomery Co line, past Wainwright Road – Highway patching and resurfacing project – Single lane closure and flagging operation Sunday night through Friday morning from 8 p.m. to 5 a.m. The project is expected to be complete in June.

Montgomery & Prince George’s Counties

  • Purple Line – For a list of active construction and lane closures along the Purple Line alignment, please click HERE (MTA project).

Somerset County

  • US 13 South at MD 822 (Umes Blvd) - Construction - Double lane and shoulder closures weekdays 7 a.m. - 5 p.m. through June 30.       
  • MD 358 between Byrd Rd and Alfred Lawson Rd – Utility Work.  Single lane and shoulder closure with flagging operations weekdays 7 a.m. - 6 p.m. through June 17.

St. Mary’s County

  • MD 5 between Abell/Moakley Streets and MD 245 (Hollywood Road) - Single and/or double lane closures, Sunday through Thursday nights, 8 p.m. to 5 a.m. for storm drain installation.       
  • MD 5 between Camp Brown Road and Scotland Beach Road – Weekday daytime single lane closures between dawn and 4 p.m. for resurfacing along northbound MD 5.

Wicomico County

  • US 50 East and West between Naylor Mill Rd and US 50BU (E. Salisbury Pkwy) - Guardrail repair.  Double lane and shoulder closures weekdays 7 a.m.-6 p.m. through June 30.
  • US 50 East and West at Wicomico-Worcester Line – Bridge inspection.  Double lane and shoulder closures weekdays 9 a.m. - 2 p.m. through June 30.

Worcester County

  • US 113 North between MD 376 (Bay St) and Branch St.- Utility work.  Double lane and shoulder closures weekdays 7 a.m.-6 p.m. through July 29. New
  • MD 589 North at US 50 (Ocean Gateway) and MD 707B (Gray’s Corner Rd) - Guardrail repair.  Double lane and shoulder closures Tuesdays, Wednesdays and Thursdays 9 a.m.-3 p.m. through June 30. New
  • US 113 North and South at various locations – Guardrail repair.  Double lane and shoulder closures weekdays 9 a.m.-3 p.m. through June 30. New
  • MD 378 North between N. 1st St and N. Division St. - construction.  Three lanes and shoulder closures Monday-Thursday 7 a.m. 6 p.m. through June 30.  Updated
  • US 113 North and South between MD 365 (Public Landing Rd) and Brick Kiln Rd. -Utility Work.  Utility Work.  Double lane and shoulder closures weekdays 9 a.m.-3 p.m. through June 17.  Updated
  • US 113 North at MD 376 (Bay St) - Construction.  Double lane and shoulder closures weekdays 6 a.m.-6 p.m. through June 30. Updated

Long-Term Closures

Allegany County

  • MD 51 (Industrial Blvd) from Canal Parkway to Springdale Street – Left lane closures will be in place south bound. Crews will work daily, 7 a.m. to 7 p.m., on the section of the roadway between Canal Parkway and Springdale Street.  Weather permitting, the project is expected to be completed by the end of June.
  • MD 51 (Oldtown Road) Bridge over the C&O Canal – Crews will be closing both lanes and creating a single lane in the center of the roadway.  This traffic set up will include a temporary traffic signal alternating traffic through the single lane.  Weather permitting, the project is expected to be completed by the end of summer.       
  • US 220 North from I-68 (National Freeway) to the Pennsylvania State Line – Paving project will be underway 8:00 p.m. to 5:00 a.m.  Flagging operation with shoulder closures both northbound and southbound – weather permitting.  New
  • I-68 (National Freeway) Bridge over MD 55 (Vale Summit Road) - Barrier repairs and fencing installation - Weekdays from 7 a.m. to 7 p.m. Right lane and shoulder closures both westbound and eastbound - Weather permitting, the project is expected to complete by the end of June.

Anne Arundel County

  • MD 424 between MD 214 and US 50 – Daytime single lane closures between 9 a.m. and 3 p.m. for resurfacing.
  • MD 648 between MD 3 and I-97 – Nighttime single lane closures between 9 p.m. and 5 a.m. for pavement resurfacing, Sunday through Thursday.       
  • MD 424 between Lang Drive and the Crofton High School entrance – Daytime lane shift between 9 a.m. and 2 p.m., Monday through Friday for maintenance work.

Baltimore County

  • I-695 TSMO Project: Outer loop from I-83 NB (BHX) to MD 140 (Reisterstown Rd.) – ITS Underground Installation and Roadway construction –Right Shoulder Closures for ITS construction and Roadway Construction by contractor team along outer loop I-695 from I-83 Northbound to Reisterstown Road, weekdays Monday 6/13 to Friday 6/17 from 9 a.m. to 3 p.m.  Updated
  • I-695 TSMO Project: Inner/Outer loop from US 40 (Baltimore National Pike) to I-95 – Test Pits and Pipe Investigation –Intermittent Right/Left Shoulder Closures for test pits and pipe investigation by contractor team along inner/outer loop I-695 from US 40 to I-95, weekdays Monday 6/13 to Friday 6/17 between 9 a.m. and 3 p.m. Updated
  • I-695 TSMO Project: Outer loop from MD 129 (Park Heights Ave.) to Old Court Rd. – Construction Work Zone Setup along Outer loop I-695 at night Tuesday 6/14 to Thursday 6/16 with lane closures between 10 p.m. to 5 a.m. the next day.  New 
  • I-83 (Baltimore-Harrisburg Expressway) North and South Bridges over Padonia Road – Dual Bridge replacement and interchange improvements – Ramp from eastbound Padonia Road to northbound I-83 , along with the new left-turn bay is open to traffic as of June 6.  There may be single  lane  closures on I-83 north and I-83 south between 9 a.m. and 4 p.m. for final paving and landscaping work Monday-Friday and between 7 p.m. and 5 a.m. the next day Sunday-Thursday. Single lane closures on Padonia Rd. West between 9 a.m. and 3 p.m. Monday-Saturday, and between 8 p.m.  and 5 a.m. the next day Sunday-Thursday.  Detours of Padonia Rd. underneath I-83 possible on any weeknight (Sunday-Thursday) between 8 p.m. and 5 a.m. the next morning for final construction tasks this summer. Updated    
  • Cove Road bridge over I-695 - Bridge deck replacement - The long-term 24/7 single lane closures on the bridge will be removed on Monday, June 13.  On Cove Road and I-695, temporary daytime single lane closures in both directions may occur Monday-Friday between 9 a.m. and 3 p.m. and overnight lane closures Sunday-Thursday between 7 p.m. and 5 a.m. the next day, through summer 2022.  Updated       
  • US 40 (Pulaski Highway) Dual Bridges over Little Gunpowder Falls and (Big) Gunpowder Falls -Bridge rehabilitation – Traffic Pattern Change to remove split traffic pattern on eastbound and westbound US 40 bridges over “Big” Gunpowder Falls scheduled for Sunday night, June 12 and Monday night, June 13. The work will begin at 7 p.m. and end at 5 a.m. the next morning.  In case of inclement weather, the work will take place on the next possible night.  In late June or early July, (date TBA) there will be a new traffic split on the bridges over Little Gunpowder Falls.  Construction work on at all four bridges will continue through spring 2023, with temporary single lane closures on eastbound and westbound US 40 during the following off-peak times:  Daytime (Monday-Saturday) Westbound US 40: 8 a.m. to 4 p.m.  Eastbound US 40: 7 a.m.  to 4 p.m.  Overnight (Sunday-Thursday) Westbound and Eastbound US 40:  7 p.m. to 5 a.m. the next day. Possible Traffic Impact in Harford County.   Updated       
  • US 1 (Washington Blvd.) Bridge over CSX Transportation rail lines – Bridge replacement –  Clarke Blvd. at US 1 is closed/detoured 24 hours/7 days through late fall 2022.  Posted detour route includes Selford Rd., Francis Ave., Oregon and Carville Aves., Tom Day Blvd. and US 1 Alt. (Southwestern Blvd.)   There also will be temporary lane closures on US 1 and detours of the bridge at night (overnight bridge detour dates TBA) through summer 2023. Updated       
  • MD 25 (Falls Road) between Baltimore City / County Line and I-695 – Baltimore County DPWT water line replacement project - Overnight lane closures with flagging operations along sections of Falls Road, 9 p.m.-5 a.m. the next day Sunday-Thursday, with some daytime work as needed 9 a.m.-3 p.m. through spring 2024.       
  • MD 26 (Liberty Road) Eastbound between Jean Dr. and Meadowdale Dr. - ADA Sidewalk Reconstruction/Upgrades - Temporary overnight single lane closures on MD 26 between 9 p.m. and 5 a.m. the next day Sunday-Thursday and between 9 a.m. and 12:30 p.m. Monday-Friday through mid-summer 2022.       
  • MD 26 (Liberty Road) between Brenbrook Drive and N. Rolling Road - ADA Sidewalk Reconstruction/Upgrades - Temporary overnight single lane closures on MD 26 between 9 p.m. and 5 a.m. the next day Sunday-Thursday and between 9 a.m. and 11 a.m. Monday Thursday through early summer 2022.       
  • MD 26 (Liberty Road) between Deer Park Rd. and Pikeswood Rd. - Americans with Disabilities Act (ADA) Sidewalk Reconstruction/Upgrades - Temporary daytime single lane closures on MD 26 between 9 a.m. and 3 p.m. Monday-Friday through early summer 2022.       
  • MD 30 (Hanover Pike) at Mt. Gilead Road – Intersection Improvements – Daytime lane closures with flagging operations at intersection Monday through Friday, 9 a.m.-3 p.m. through fall 2022.       
  • MD 43 (White Marsh Blvd.) at Honeygo Blvd. - Intersection Widening and Improvements - Temporary daytime lane closures on MD 43 and Honeygo Blvd. legs of the intersection between 9 a.m. and 3 p.m. Monday-Friday, and overnight lane closures at any time between 8 p.m. and 5 a.m. the next day Sunday-Thursday. When necessary, there will be temporary lane closures on weekends, 7 a.m.-1 p.m. Saturday and/or Sunday through late summer 2022.       
  • MD 140 (Reisterstown Road) between I-695 and Mt. Wilson Lane/ Grey Rock Rd. - Americans with Disabilities Act (ADA) improvements - includes traffic signal upgrades, crosswalk markings, and paving on MD 140 and also on Hooks Lane at MD 140. Temporary daytime single lane closures on MD 140 between 9 a.m. and 3 p.m. Monday-Friday and overnight single lane closures on Hooks Lane approach to MD 140 between 9 p.m. and 5 a.m. the next morning Sunday-Thursday through summer 2022.
  • MD 140 (Reisterstown Rd.) between Painters Mill Rd. and E. Pleasant Hill Rd. – Resurfacing/County Water Main replacement - Crews are installing new 36-inch water main from Owings Mills Blvd. to East Pleasant Hill Road with connections to fire hydrants and buildings along MD 140. Daytime single lane closures between 9 a.m. and 3 p.m. between Owings Mills Blvd. and E. Pleasant Hill Rd.  Nighttime single lane closures within project limits Sunday-Thursday nights between 9 p.m. and 5 a.m. the next day.  Access to all driveways in this section will be maintained during any lane closures.  Project scheduled through summer 2022.       
  • MD 140 (Reisterstown Rd.) between E. Pleasant Hill Rd. and Stocksdale Ave. – Resurfacing/County Water Main replacement - Daytime single lane closures Monday-Friday 9 a.m.-3 p.m. between E. Pleasant Hill Rd and Stocksdale Ave.  Nighttime single lane closures within project limits Sunday-Thursday nights between 8 p.m. and 6 a.m. the next day. Access to driveways in this section will be maintained during any lane closures.  Project scheduled through summer 2024.
  • MD 147 (Harford Road) / Joppa Road - Intersection improvements - Daytime single lane closures and flagging operations on Harford and Joppa Road in the vicinity of the intersection Monday-Thursday 9 a.m.-4 p.m. Monday-Thursday and 9 a.m.-3 p.m.  Fridays.  Overnight work with lane closures Sunday-Thursday 9 p.m.-5 a.m. the next day. Lane shift in effect on eastbound Joppa Road approaching Harford Road summer 2022, with work zone barriers on right side of the street. Updated
  • MD 151 (Sparrows Point Blvd.) / Wharf Road (MD 151 B) Interchange - Three-bridge replacement project at interchange.  One side of the existing MD 151 bridge is closed and two-way traffic - one lane in each direction - runs on the other side of the bridge. This will be in effect through 2022 and will enable traffic on MD 151 while the existing bridge over Wharf Road is removed and replaced in stages.  Southbound and northbound Wharf Road are close/detoured at the interchange for replacement of two more bridges. Construction scheduled through summer 2024. Updated      

Cecil County

  • MD 213 (Augustine Herman Highway) bridge over C&D Canal in Chesapeake City – U.S. Army Corps of Engineers bridge repair project. Occasional single lane closures and flagging will occur 9 a.m. to 3 p.m., Monday-Thursday from May 9 through August 11. View real-time traffic conditions at the bridge with these cameras: MD 213 at Basil Ave. (south side) and MD 213 at Lock St. (north side). New
  • MD 279 (Elkton Road) at MD 277 (Fletchwood Road) – Northbound MD 279 is reduced to a single lane at the MD 277 intersection near the Delaware line and shifted across the median to a contraflow pattern (one lane in each direction).  This is part of the Delaware Department of Transportation (DelDot) reconstruction of route 279.

Frederick County

  • Northbound US 15 Bridge over MD 77 – Bridge Deck replacement project – The right lane is closed. Each side of the bridge is expected to take six to eight months to finish. The entire project is expected to be complete by spring 2023.

Garrett County

  • MD 39 (Hutton Road) from Ashby Ellis to US 219 in Oakland – Drainage improvement and repaving project, flagging operation, 7 a.m.-5 p.m. Monday-Friday.  New
  • US 219 Mason School Road to Monte Vista Road – Paving project – Flagging operation 7:00 a.m. to 7 p.m.        
  • MD 135 from MD 38 to MD 135C – Patch, mill, pave and apply new pavement marking – Flagging operation 7 a.m.-7 p.m.         

Harford County

  • Old Joppa Road Bridge over I-95 (MDTA project) – Bridge replacement project – Old Joppa Road closed and locally detoured.       
  • Clayton Road bridge over I-95 between MD 152 and MD 24 (MDTA project) - Clayton Road closed and detoured until early 2022.       
  • I-95/MD 152 Interchange Reconstruction (MDTA project) - Travel lanes on MD 152 at I-95 will be shifted to accommodate reconstruction of the existing interchange. MD 152 traffic will shift from the current location to the outside of the roadway in both directions on MD 152 between Old Mountain Road/Jaycee Drive and MD 7 (Philadelphia Road). All access to and from I-95 will retain its present configuration throughout this phase of construction, which will last through spring 2022.

Montgomery County

  • I-270 Southbound from MD 121 (Clarksburg Road) to MD 109 (Old Hundred Road) - I-270 acceleration lane expansion project - Single and multiple off-peak lane closures, weekdays 9:30 a.m.to 3:30 p.m. and overnight, Sunday through Thursday, 7 p.m. to 4 a.m.  Possible Traffic Impact in Frederick County.       
  • Brookeville Road from MD 97 (Georgia Avenue) to Grayheaven Manor Road. Sewer relocation project. Full 24/7 road closure with detour through late spring 2022. Drivers should add extra commute time and use MD 97 and MD 108 as alternate routes.       
  • MD 185 (Connecticut Avenue) at Jones Bridge Road/Kensington Parkway Intersection improvement project - Single off-peak lane closures on MD 185, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. and single off-peak lane closures on Jones Bridge Road, weekdays, 9 a.m. to 3 p.m. and overnight, 7 days per week, 9 p.m. to 5 a.m. through late summer 2023.       
  • MD 185 (Connecticut Avenue) at Saul Road Intersection improvement project. Single lane closures with intermittent intersection closures, weekdays, 9 a.m. to 3 p.m. through year-end 2022.       
  • MD 97 (Georgia Avenue) from north of Gold Mine Road to south of Holiday Drive. - Roadway relocation project - Intermittent single northbound and southbound  lane closures weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 6 a.m. through year-end 2022.       
  • MD 410 (East West Highway) from Rocton Avenue to Curtis Street – Curb realignment and sidewalk construction. Single lane closure, weekdays, 9 a.m. to 3 p.m. through late spring 2022.       
  • I-270 from I-70 to I-495 (Capital Beltway) - Traffic congestion relief construction project - Intermittent single lane closures, weekdays, 10 a.m. to 3 p.m. and single, double and triple overnight lane closures, Sunday through Thursday, 7 p.m. to 5 a.m. and intermittent temporary ramp closures with detours up to 24 hours a day through year-end 2022.       
  • I-270 Southbound from MD 121 (Clarksburg Road) to MD 109 (Old Hundred Road) - I-270 acceleration lane expansion project. Single and multiple off-peak lane closures, weekdays 9:30 a.m.to 3:30 p.m. and overnight, Sunday through Thursday, 7 p.m. to 4 a.m. through year-end 2022.

Prince George’s County

  • Cherry Hill Road over I-95 northbound ramp at the I-495 Outer Loop(Capital Beltway). Bridge painting and cleaning project. Single and multiple off-peak lane closures; 8 p.m. to 5 .am. through late fall 2022.       
  • US 1 (Baltimore Avenue), College Ave. to MD 193 (University Boulevard) - US 1 Reconstruction Project - Corridor Improvement- Northbound and southbound single lane closures throughout the length of the project Saturday through Sunday, 10 a.m. to 4 p.m. and 9 p.m. tm. through late summer 2023.       
  • Westbound MD 4 (Pennsylvania Avenue) ramp to northbound MD 980D (Ritchie Marlboro Road). Slope repair project. Full ramp closure with detour through year-end 2022. Drivers should consider MD 223 (Woodyard Road) and Old Marlboro Pike as alternate routes.
  • MD 5 (Branch Avenue) from the DC Line to the intersection of Curtis Drive - Safety and resurfacing project. Intermittent/temporary single and multiple MD 5 northbound off-peak lane closures, weekdays, 9 a.m. to 3 p.m., overnight, Sunday through Thursday 7 p.m. to 5 a.m. and weekends, 5 a.m. to 10 p.m. and weekends 5 a.m. to 10 p.m. Intermittent/temporary single  and multiple MD 5 southbound off-peak lane closures weekdays, 6 a.m. to 12 noon overnight, Sunday through Thursday, 7 p.m. to 6 a.m. and intermittent/temporary single and multiple    MD 637 single lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 7 p.m. to 6 a.m. through late summer 2022.       
  • MD 5 (Branch Avenue) from Suitland Parkway to Curtis Drive. Median construction. Single northbound lane closure 24 hours a day through late summer 2022.       
  • MD 210 at Livingston Road/Kerby Hill Road. Interchange construction project. Intermittent   off-peak single and multiple lane closures, Monday through Saturday, 9 a.m.to 3 p.m. and overnight, Sunday through Thursday, 8 p.m.to 5 a.m. through late summer 2022.       
  • MD 212A (Powder Mill Road) from Pine Street to US 1 (Baltimore Avenue) - Roadway reconstruction project. Intermittent single and multiple lane closures weekdays, 8 a.m. to 4 p.m. through late summer 2022.       
  • MD 223 (Woodyard Road) from Sherwood Drive to Victoria Drive - Sidewalk construction project - Off-peak lane closures, weekdays, 8:30 a.m. to 3:30 p.m. and Saturdays, 8 a.m. to 5 p.m. through late fall 2022.       
  • MD 223 (Woodyard Road) at Dower House Road - Geometric improvement project - Single weekday  lane closures, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through late summer 2022.       
  • MD  500 (Queens Chapel Road) from Eastern Avenue to MD 208 (Hamilton Street) Community safety and enhancement project. Intermittent single and multiple  lane  closures weekdays,9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 7 p.m. to 6 a.m. through late summer 2022.       
  • I-95/I-495 (Capital Beltway) from Suitland Road to MD 4 (Pennsylvania Avenue) - Suitland Parkway bridge replacement project. Road shoulder closure permissible 24 hours daily, intermittent single and multiple lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Friday, 8 p.m. to 6 a.m. through year end 2022.

Talbot County

  • MD 33 (Talbot St.) from Spencer Ave. to Lee St. in St. Michaels - Sidewalk project. Occasional single-lane  closures and flagging 9 a.m. to 3 p.m. Monday-Thursday through Spring 2023. New

Washington County

  •  MD 66 from MD 64 to I-70 WB ramps – Milling, patching, paving, rumble strips and pavement markings - Through August, work hours are 8 p.m. to 5 a.m.  Motorists should expect lane closures, flaggers, and a pilot vehicle. New
  • I-70 East and Westbound at the MD 65 Interchange – Bridge rehabilitation and widening of I-70 bridges over MD 65 - Through September, motorists on I-70 eastbound/westbound will follow a posted detour.  I-70 eastbound/westbound shifted to the median and the right shoulder is closed with concrete barrier wall.

###