MDOT SHA PLANNED MAJOR LANE CLOSURE UPDATE FOR THE WEEKEND OF JULY 3, 2020

MDOT SHA Logo

MDOT SHA Logo

Real-Time travel conditions and live traffic cameras are available - md511.maryland.gov.

Week Ahead

Baltimore County

  • I-695 from Cove Road to MD 151 (North Point Boulevard) - Areawide interstate highway pavement resurfacing - Overnight single lane closures Sunday-Thursday nights between 7 p.m.-5 a.m.      
  • Cove Road bridge over I-695 - Bridge deck replacement - On I-695, daytime single lane closures in both directions Monday-Friday between 9 a.m. and 3 p.m. and overnight lane closures Sunday-Thursday between 7 p.m. and 5 a.m. the next day. On Cove Road, daytime single lane closures in both directions Monday-Friday between 9 a.m. and 3 p.m. and overnight lane closures Sunday-Thursday between 7 p.m. and 5 a.m. the next day Sunday-Thursday.        

Carroll County

  • MD 97 (Littlestown Pike) between Old Hanover Road and Murkle Road - Sidewalk Improvements - Single lane closure with flagging operation Monday through Friday from 8 a.m. to 3 p.m. This project is expected to be complete in July.

Frederick County

  • MD 180 (Jefferson Pike) between I-70 bridge and Mt. Zion Road - Patching - Single lane closure with a flagging operation Monday through Friday from 8 a.m. to 5 p.m. in both directions of MD 180. This project is expected to be complete in July.   

Harford County

  • MD 24 (Rocks Road) between St. Clair Bridge Road and MD 165 (Pylesville Road) - Pavement patching  – Single lane closures on sections of MD 24 with flagging operations between 9 a.m. and 3 p.m. Monday-Friday through late July.
  • US 1 Business (Broadway) between Main St. and Hickory Ave. – Roadway resurfacing - Single lane closures between 9 a.m. and 3 p.m. Monday-Friday, and between 7 p.m. and 5 a.m. the next day Sunday-Thursday.
  • MD 22 (Churchville Road) between MD 136 (Calvary Road) and Prospect Mill Road - Roadway resurfacing and intersection widening - Single lane closures/lane shifts on MD 22 at Thomas Run Road/Shucks Road. intersection and 1,000 feet west of the intersection, between 9 a.m. and 3 p.m. Monday - Friday, and between 8 p.m. and 5 a.m. the next day Sunday-Thursday. Single lane closures Saturdays between 7 a.m. and 1 p.m. when necessary.           
  • MD 132 (West Bel Air Ave.) between US 40 (Philadelphia Blvd./Pulaski Highway) and MD 462 (Paradise Ave.) - Roadway resurfacing - Single lane and shoulder/parking lane closures on MD 132 between 9 p.m. and 5 a.m. the next day Sunday - Thursday and single lane and shoulder/parking lane closures when needed between 7 a.m. and 4 p.m. Monday-Friday.   
  • MD 924 South (Kenmore Avenue) between US 1 and Main Street, and between Ring Factory Road and Plumtree Road - Roadway resurfacing - Single lane and shoulder/parking lane closures on the one-way southbound segment of MD 924 (Kenmore Avenue) 9 a.m. to 3 p.m. Monday-Friday, and overnight 8 p.m. to  5 a.m. the next morning Sunday-Thursday nights.    

Montgomery/Prince George’s County

  • Purple Line – For a list of active construction and lane closures along the Purple Line alignment, please click HERE (MTA project).
  • I-495 (Capital Beltway) Outer Loop between MD 650 (New Hampshire Avenue) and MD 193 (University Boulevard) - Emergency repair - On Monday, July 6, crews will return to perform permanent bridge joint repairs. Intermittent single and multiple lane closures are expected weekdays, 9 a.m. to 3 p.m., and overnight, between 9 p.m. and 5 a.m. Repair should be complete by mid July. New

Prince George’s County

  • MD 5 (Branch Avenue) at MD 373 (Accokeek Road)/MD 381 (Brandywine Road) – Interchange construction project -  Intermittent lane closures on all three roads, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 8 p.m. to 5 a.m. through summer 2020.
  • MD 373 (Accokeek Road) over Burch Branch- Bridge Deck Replacement - Full lane closures 24/7 at MD 373 (Accokeek Road) over Burch Branch through late summer 2020.  Variable message boards will direct motorists through a detour.

Long-Term Closures

Allegany County

  • MD 51 (Industrial Blvd) Bridge over MD 61 (Canal Parkway) in Cumberland - Bridge replacement – All traffic will be switched over to the Northbound lanes while work is done on the South bound bridge - speed limit will be reduced to 30 mph - this will continue throughout the construction season.

Anne Arundel County

  • Southbound MD 2 at Tarragon Lane – Utility work - daytime single lane closures, Monday through Friday, 9 a.m. to 3 p.m. New
  • Westbound MD 175 (Annapolis Road/Jessup Road) between National Business Parkway and MD 295 (Baltimore-Washington Parkway) – Utility relocation – Single lane closures Sunday nights through Friday mornings from 7 p.m. to 5 a.m.
  • MD 424 between Duke of Kent Drive and MD 450 (Defense Highway) - Improvement project – Single lane closures between 9 a.m. and 3 p.m., weekdays.

Baltimore City

  • HIGH IMPACT  I-895 (Baltimore Harbor Tunnel Throughway) between the tunnels and Boston Street/O’Donnell Street (exit 11) and the Holabird Avenue exit (MDTA Project) –Bridge rehabilitation project – The southbound bore of the Baltimore Harbor Tunnel (I-895) will be closed continuously until mid-June.  

Baltimore County

  •  I-70 East and West from I-695 (Baltimore Beltway) to Baltimore/Howard Co. line – Part of Areawide Interstate route pavement resurfacing - Single lane closures on I-70 East between 7 p.m. and 5 a.m. the next day Sunday-Thursday;  double lane closures between 8 p.m. and 5 a.m. the next day Sunday-Thursday.   
  • I-83 (Baltimore-Harrisburg Expressway) North and South Bridges over Padonia Road –Dual Bridge replacement and interchange improvements – I-83 South has a split traffic pattern at Padonia Rd. interchange with all lanes open (2 left, one right) until late fall 2020. I-83 North has single lane closures between 9 a.m. and 4 p.m. Monday-Friday and between 7 p.m. and 5 a.m. the next day Sunday-Thursday.  24 hours/7 days single lane closure on Padonia Rd. East until the project is complete. Interchange Ramp from Padonia Road East to I-83 North closed 24 hours/7 days until the project is complete.  Single lane closures on Padonia Rd. West between 9 a.m. and 3 p.m. Monday-Saturday, and between 8 p.m. and 5 a.m. the next day Sunday-Thursday. Detours of Padonia Rd. underneath I-83 possible on weeknights (Sunday-Thursday) between 8 p.m. and 5 a.m the next morning.  Ongoing
  • HIGH IMPACT  I-695 South (Baltimore Beltway Outer Loop) between US 40 (Baltimore National Pike) and MD 144 (Frederick Road) – Highway widening project – Single and double lane closures along I-695 South and North (Outer and Inner Loops) between 9 p.m. and 5 a.m. the next day Sunday-Thursday. Interchange Ramp from I-695 South/Outer Loop at Exit 13 - MD 144 (Frederick Road) closed for reconstruction until late summer 2020.
  • US 1 (Belair Road) between I-695 (Baltimore Beltway) and Still Meadow Road – Roadway resurfacing – Intermittent single lane closures on northbound and southbound US 1 between 8 am to 4 pm Monday-Friday.      
  • US 1 (Belair Road) Bridge over Gunpowder Falls – Bridge rehabilitation – Intermittent two-hour single lane closures on northbound and southbound US 1 in the vicinity of the bridge between 9 a.m. and 3 p.m. Monday-Friday.
  • MD 150 (Eastern Ave.) between the bridge over Back River and the intersection with Mace Avenue/Riverside Drive - Resurfacing/County water main replacement – Single lane closures on eastbound and MD 150 between 9 a.m. and 3 p.m., Monday-Friday, and between 7 p.m. and 5 a.m. the next day, Sunday-Thursday.
  • MD 140 (Reisterstown Road) between Painters Mill Rd. and Pleasant Hill Rd. –Resurfacing/County Water Main replacement - Single lane closures with lane shifts along northbound and southbound MD 140 from the CSX Railroad Bridge to Straw Hat Road  Monday-Friday between 9 a.m. and 3 p.m. and Sunday-Thursday between 7 pm and 5 a.m. the next morning. weather permitting. Crews are installing a new 36-inch water main from CSX Railroad Bridge to Straw Hat Road. Access to all driveways in this section will be maintained during the lane closures.      
  • MD 140 (Reisterstown Rd.) Northbound between Garrison View Rd. and Painters Mill Rd. – Highway Widening and Resurfacing - Single and double lane closures along northbound MD 140 Sunday-Thursday between 9 p.m. and 5 a.m. the next morning. Occasional single lane closures Monday-Friday for a two-hour time period between the hours of 9 a.m. and 3 p.m. Ongoing
  • MD 45 (York Road) between north of Padonia Road and Wight Avenue –Roadway Resurfacing/County Water Main replacement – Single and double lane closures on MD 45 between 9 p.m. and 5 a.m. the next day Sunday-Thursday and single lane closures between 9 a.m. and 3 p.m. Monday-Friday. Ongoing
  • US 40 (Pulaski Hwy.) Dual Bridges over the Gunpowder Falls and the Little Gunpowder Falls (Baltimore/Harford Co. Line) - Bridge rehabilitation - Single lane closures on US 40 East between 7 a.m. and 3 p.m. Monday-Friday, and on US 40 West between 7 a.m. and 4 p.m. Monday-Friday.Carroll County• MD 32 (Sykesville Road) between Main Street and Macbeth Way – Road widening project – Both shoulders are closed and traffic shifted with a barrier wall on northbound MD 32 until summer 2020.

Cecil County

  • MD 273 (Telegraph Road) Bridge over Big Elk Creek – Bridge replacement project – Temporary traffic signal to alternate traffic in single lane through summer 2020.

Charles County

  • MD 234 and Glasva School Road – Bridge railing repair – Crews will close access at the southern end of Glasva School Road and detour traffic to northbound US 301 with access restricted to local residents. Detour in effect through late spring.

Frederick County

  • MD 28 (Dickerson Road) Bridge over the Monocacy River – Bridge rehabilitation– Total bridge closure scheduled every weekend starting Fridays at 10 p.m. and ending Mondays at 5 a.m. through September except on holiday weekends. Single lane closure with a flagging operation Monday through Friday from 8 a.m. to 4 p.m.

Harford County

  • Old Joppa Road Bridge over I-95 (MDTA project) – Bridge replacement project – Old Joppa Road closed and locally detoured.     
  • MD 22 (Churchville Road) between MD 136 (Calvary Rd.) and Prospect Mill Rd. - Roadway resurfacing and intersection widening - Single lane closures/lane shifts on MD 22 at Thomas Run Rd./Shucks Rd. intersection between 9 a.m. and 3 p.m. Monday-Friday, and between 8 p.m. and 5 a.m. the next day Sunday-Thursday and between 7 a.m. and 1 p.m. Saturdays when necessary. Ongoing 
  • MD 132 (West Bel Air Ave.) between US 40 (Philadelphia Blvd./Pulaski Hwy.) and MD 462 (Paradise Ave.) - Roadway resurfacing - Single lane and shoulder/parking lane closures on MD 132 between 9 p.m. and 5 a.m. the next day Sunday-Thursday and single lane and shoulder/parking lane closures when needed between 7 a.m. and 4 p.m. Monday-Friday. Ongoing

Howard County

  • Triadelphia Road Bridge over MD 32 – Highway widening project – Eastbound Triadelphia Road closed and detoured until summer 2020. Westbound Triadelphia Road traffic can use the existing bridge.

Montgomery County

  • US 29 (Colesville Road) from MD 97 (Georgia Avenue) to Spring Street. - WSSC pipe replacement project - Intermittent northbound and southbound lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through late summer 2020.     
  • US 29 (Colesville Road) from St. Andrews Way to Stewart Lane. -Safety and resurfacing project - Single daytime lane closures, weekdays, 9 a.m. to 3 p.m. and double overnight lane closures, Sunday through Thursday, 9 p.m. to 5 a.m. through year-end 2021.     
  • MD 97 (Georgia Avenue) from north of Gold Mine Road to south of Holiday Drive. - Relocation project.- Intermittent single northbound and southbound lane closures, weekdays, 8 a.m. to 4 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through year-end 2021.
  • MD 124 (Quince Orchard Road) from Dosh Drive to MD 117 (Clopper Road/West Diamond Avenue). Bicycle/pedestrian improvement project. Intermittent single daytime lane closures, weekdays, 9 a.m. to 3 p.m. through late summer 2020.
  • MD 187 (Old Georgetown Road) from I-495 (Capital Beltway) to Cedar Lane. Safety and resurfacing project. Intermittent daytime single and double lane closures, weekdays, 8 a.m. to 7 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through late fall 2020.
  • MD 355 (Frederick Road) at West Old Baltimore Road. Intersection construction project. Intermittent single lane closures on both roads, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 7 p.m. to 6 a.m. through year-end 2020.     
  • I-270 (Eisenhower Highway) from Watkins Mill Road to Great Seneca Creek Crossing.- Interchange construction project. -Intermittent northbound lane closures, weekdays, 5 a.m. to 2 p.m. and southbound 10 a.m. to 7 p.m. and overnight northbound and southbound lane closures, Sunday through Thursday, 7 p.m. to 5 a.m. through late summer 2020.     
  • I-270 (Eisenhower Highway) from Interstate 70 to I-495 (Capital Beltway). Traffic congestion relief construction project. Intermittent single lane closures, weekdays, 10 a.m. to 3 p.m. and single, double and triple overnight lane closures, Sunday through Thursday, 7 p.m. to 5 a.m. and intermittent temporary ramp closures with detours up to 24 hours a day through late spring 2021.     
  • I-270 (Eisenhower Highway) from MD 189 (Falls Road) to Democracy Boulevard. - Road resurfacing.-  Intermittent single, double, triple and quadruple lane southbound lane closures, overnight, Sunday through Thursday, 7 p.m. to 5 a.m. through late summer 2020. (Two traffic lanes will remain open during all resurfacing phases).
  • Inner and outer loops I-495 (Capital Beltway) from MacArthur Boulevard to the American Legion Bridge. Bridge cleaning and painting project. Intermittent mobile left and right lane closures, overnight, Sunday through Thursday, 11 p.m. to 5 a.m. through late summer 2020.      
  • Seminary Road from Hale Street to MD 192 (Forest Glen Road). Bridge rehabilitation project. Intermittent left and right single northbound and southbound lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 8 p.m. to 5 a.m. through year-end 2020.     
  • Inner and outer loops of I-495 (Capital Beltway) from MD 97 (Georgia Avenue) to MD 185 (Connecticut Avenue) Bridge rehabilitation project. Intermittent single weekday single lane closures, 9 a.m. to 3 p.m. and intermittent overnight single double and triple lane closures and full traffic stops, Sunday through Thursday, 9 p.m. to 5 a.m. through year-end 2020.

Prince George’s County

  • US 1 (Baltimore Ave) College Ave to MD 193 (University Blvd)- US 1 Reconstruction Project - Corridor Improvement- Northbound and southbound single lane closures throughout the length of the project Saturday through Sunday, 10 a.m. to 4 p.m. and 9 p.m. to 7 a.m. starting June 6th through summer 2023.          
  • US 1 from Oak Street to the Howard County Line – Resurfacing – Northbound and southbound double lane closures 7 a.m. to 5 p.m. Monday through Friday. The 1.2-mile project is expected to be complete by this summer.
  • Kerby Hill Road/Livingston Road intersections at MD 210 (Indian Head Highway) – Interchange construction project – Crossover from Kerby Hill Rd. to Livingston Rd. across MD 210 to close and be detoured. Click here for detour routes. Crews construction bridge that will connect the roads and will be complete by the end of 2021.          
  • Southbound I-95/I-495 (Capital Beltway) ramp to eastbound MD 214 (Central Avenue) – Bridge replacement project – Total ramp closure with traffic using the Capital Beltway/MD 202 (Largo Road) interchange and then to MD 214 via MD 202.

Queen Anne’s County

  • MD 213 through Centreville – Striping and placement of pavement markings/symbols will continue as weather permits through July 9.  Motorists may encounter lane shifts, shoulder closures and flagging during daytime hours. Updated

St. Mary’s County

  • Southbound MD 5 between Abell/Moakley Streets and MD 245 (Hollywood Road) - Daytime single lane closures between 9 a.m. and 3 p.m.
  • Northbound and southbound MD 235 between MD 5 and Laurel Grove Road – Resurfacing Project. Single lane closures - Monday through Friday, 8 a.m. to 4 p.m.    

Washington County

  • I-70 east and westbound at the MD 65 Interchange – Bridge rehabilitation and widening – Alternating East and West bound lane closures. Work continues daily between 7:00 a.m.-6:00 p.m. Monday-Thursday night work will be done from 6:00 p.m.-5:00 am. This will be continuous throughout the project.     
  •  I-70 east and westbound at MD 56 (Big Pool) - Bridge deck replacement and rehabilitation for the bridge over I-70 - Left and right shoulder closure.

 

 

 

 

 

###