MDOT SHA MAJOR PLANNED MAJOR LANE CLOSURE UPDATE - NOVEMBER 8, 2019

MDOT SHA Logo

MDOT SHA Logo

All Work is Weather Dependent

Real-Time travel conditions and live traffic cameras are available - md511.maryland.gov.

Weekend Closures

Anne Arundel County
 
• HIGH-IMPACT - MD 450 (Defense Highway) between Ridges Gateway and Crownsville Road/South Haven Road – Culvert replacement – MD 450 to be closed starting at 11:45 pm. On Friday, November 8 and will reopen no later than 5 a.m. Monday, November 11. new
 
Baltimore/Harford County

• Westbound US 40 (Pulaski Highway) on the Bridge over the Little Gunpowder Falls – Bridge rehabilitation project – Single lane closure Saturday and Sunday between 7 a.m. and 3 p.m.

Frederick County

• US 40 Alternate between Fern Lane and Ridge Road – Landscape work – The right lane, “truck climbing lane”, of eastbound US 40 Alt will be closed on Saturday, Nov. 9 from 8 a.m. to 4 p.m. new

Long-Term Closures

Anne Arundel/Queen Anne’s County line

HIGH-IMPACT - US 50/301 (Chesapeake Bay Bridge) – Bridge deck rehabilitation project (MDTA Project) – Westbound US 50/US 301 right lane closed 24/7 and no two-way traffic. 

Allegany County

• MD 36 (Mt. Savage Road) Bridge over Jennings Run –Bridge Replacement – MD 36 is closed and detoured.

Baltimore City

• I-895 (Baltimore Harbor Tunnel Throughway) between the tunnels and Boston Street/O’Donnell Street (exit 11) and the Holabird Avenue exit (MDTA Project) – Bridge rehabilitation project – Northbound I-895 closed and two-way traffic using southbound I-895. Use I-95 (Fort McHenry Tunnel) or I-695 (Francis Scott Key Bridge) as alternate routes. Project to last until 2021.

Baltimore County

• MD 140 (Reisterstown Road) north of the McDonogh Road/Cradock Lane – BGE utility work – Lane shift to occur on September 3 for 60 days, as well as left turn lane from southbound MD 140 to Craddock Lane. Posted local detour in effect for turn lane closure.

HIGH-IMPACT - Outer loop of I-695 (Baltimore Beltway) ramp to MD 144 (Frederick Road) – Ramp reconstruction/storm drain and electrical work for highway widening project – Ramp to close at 9 p.m. on August 5 for approximately eight months. Motorists will be guided to the I-695/MD 372 (Wilkens Avenue) interchange and motorists will use the ramps to access the inner loop of I-695 back to MD 144.

• Eastbound Padonia Road ramp to northbound I-83 – Ramp closure for bridge replacement project – Motorists will be guided to Deerco Road to the I-83/Timonium Road interchange.

• Bradshaw Road Bridge over I-95 (MDTA Project) – Bridge rehabilitation project – Bridge to close and traffic detoured until spring 2020.

Cecil County

• MD 273 (Telegraph Road) Bridge over Big Elk Creek – Bridge replacement project – Temporary traffic signal to alternate traffic in single lane until spring 2020.
 
Frederick County
 
• MD 28 (Dickerson Road) Bridge over the Monocacy River – Bridge rehabilitation– Single lane closure (24/7) guided by temporary traffic signal until spring 2020.

• MD 464 (Point of Rocks Road) Bridge over Little Catoctin Creek – Bridge replacement project – Total closure until early 2020. Motorists will be guided around the bridge project using Olive School Road to MD 180 (Jefferson Pike) to MD 17 (Petersville Road). A temporary traffic signal will be installed at MD 180 (Jefferson Pike) and Olive School Road prior to the closure.
 
Howard County
 
• Southbound US 1 (Washington Boulevard) between Brumbaugh Street and Bonnie View Lane – BGE utility relocation – Right lane closed until early-November.
 
• Triadelphia Road Bridge over MD 32 – Highway widening project – Eastbound Triadelphia Road will be closed and detoured until summer 2020. Westbound Triadelphia Road will be able to use existing bridge.
Prince George’s County
 
• Kerby Hill Road/Livingston Road intersections at MD 210 (Indian Head Highway) – Interchange construction project – Crossover from Kerby Hill Rd. to Livingston Rd. across MD 210 to close and be detoured. Click here for detour routes. Crews construction bridge that will connect the roads and will be complete by the end of 2021. 
 
• Southbound I-95/I-495 (Capital Beltway) ramp to eastbound MD 214 (Central Avenue) – Bridge replacement project – Total ramp closure with traffic using the Capital Beltway/MD 202 (Largo Road) interchange and then to MD 214 via MD 202.

MAJOR Closures for Next Week
 
Anne Arundel County

• Westbound MD 175 (Annapolis Road/Jessup Road) between National Business Parkway and MD 295 (Baltimore-Washington Parkway) – Utility relocation – Single lane closures Sunday nights through Friday mornings from 7 p.m. to 5 a.m.

• MD 3 (Crain Highway) between Conway Road and Carver Road - Gas main installation - Single lane closures Mondays through Fridays between 9 a.m. and 3 p.m.
 
Baltimore County
 
• MD 145 (Paper Mill Road) Bridge over Gunpowder Falls – Routine bridge maintenance– Single lane closures Mondays through Fridays between 9 a.m. and 3 p.m. until early-December. new
 
• MD 45 (York Road) between north of the Towson Roundabout and Cavan Drive (just north of I-695) - Resurfacing – Single and double lane closures Sunday nights through Friday mornings between 8 p.m. and 5 a.m.
 
• MD 45 (York Road) between north of Padonia Road and Wight Avenue – Resurfacing/Water main replacement – Single and double lane closures Sunday nights through Friday mornings between 9 p.m. and 5 a.m.

Frederick County

• MD 75 (Green Valley Road) between MD 80 (Fingerboard Road) and MD 355 (Urbana Pike) – Patching and resurface – Beginning Thursday, November 7, single lane closures with flagging operations Monday through Friday from 8:30 a.m. to 3:30 p.m. with possible Saturday hours if there are weather delays. This project is expected to finish in two weeks.
 
• MD 85 (Buckeystown Pike) between English Muffin Way and MD 80 (Fingerboard Road) – Pavement repair – Single lane closures Mondays through Fridays between 8 a.m. and 4 p.m. through mid-November.
 
Harford/Cecil County line

• US 1 (Conowingo Road) over the Conowingo Hydroelectric Dam – Utility improvements – Single lane closures guided by flaggers Mondays through Fridays between 9 a.m. and 3 p.m. through mid-November. new

Howard County

• Northbound I-95 between MD 100 and Patapsco River (Howard/Baltimore County line) – Resurfacing and guardrail – Single and double lane closures Sunday through Thursday from 8 p.m. to 5 a.m. Work will start on northbound I-95 and then switch to southbound. The work is expected to be complete this fall.
 
• MD 32 between Guildford Road and the Middle Patuxent Bridge – Resurfacing –Single lane closures Sunday nights through Friday mornings between 8 p.m. and 5 a.m.
 
• MD 108 (Old Annapolis Road) between Centre Park Drive and MD 104 (Waterloo Road) – Patching and resurfacing – Single lane closures Sunday nights through Friday mornings between 7 p.m. and 5 a.m.

Montgomery County

• MD 28 (Norbeck Road) between MD 97 (Georgia Avenue) and Baileys Lane – Intersection improvements – Single lane closures Mondays through Fridays between 9 a.m. and 3 p.m. and Sunday nights through Friday mornings between 8 p.m. and 5 a.m.
 
• US 29 (Colesville Road) between MD 97 (Georgia Avenue) and St. Andrews Way (near Sligo Creek Parkway) - Resurfacing – Single lane closures Mondays through Fridays between 9 a.m. and 3 p.m. and Sunday nights through Friday mornings between 8 p.m. and 5 a.m.
 
• US 29 (Colesville Road) between I-495 (Capital Beltway) and MD 97 (Georgia Avenue) - WSSC water line replacement project - Single and double lane closures Mondays through Fridays between 9:30 a.m. to 3:30 p.m. and Sundays through Friday mornings between 9 p.m. and 5 a.m. Single lane closures Saturday between 9 a.m. and 5 p.m.
 
• MD 97 (Georgia Avenue) between north of Goldmine Road and south of Holiday Drive - Bypass construction – Single lane closures Mondays through Fridays between 8 a.m. and 3 p.m.
 
• MD 185 (Connecticut Avenue) between MD 410 (East-West Highway) and Manor Road – Resurfacing project – Single lane closures Mondays through Fridays between 9 a.m. and 3 p.m. and Sunday nights through Friday mornings between 8 p.m. and 5 a.m.
 
Washington County

• MD 144 (E. Main Street) between Tollgate Ridge Road and Locher Road – Resurfacing– Beginning November 4, daily single lane closures between 8 a.m. and 5 p.m. Project should be complete by the end of November.

• I-81 between the Potomac River Bridge (West Virginia line) and MD 68/MD 63 (Lappans Road) – Highway widening project – Left lane closures Sunday nights through Friday mornings between 9 p.m. and 5 a.m. There may be occasional, brief total closures to move equipment and material into place between 2 a.m. and 4 a.m.

Future File

Frederick County

• MD 180 (Jefferson Pike) between I-70 and Mt. Zion Road – Patching and resurface – Single lane closures with flagging operations Monday through Friday from 8 a.m. to 3 p.m. with possible Saturday hours if there are weather delays. This project is expected to finish in one week. new

Calvert/St. Mary’s County line
 
HIGH-IMPACT - MD 4/Thomas Johnson Memorial Bridge over the Patuxent River – Routine bridge inspection – Routine inspection of the bridge will take place between November 17 and November 21. Motorists can expect single lane closures guided a flagging operation beginning at 9 p.m. each evening. All lanes will open by 5 a.m. each morning. new
 

###