All work is weather permitting
Real-time travel conditions and live traffic cameras –https://md511.maryland.gov
Please see the traffic alerts recently issued below. These lane closures may impact your travel.
Weekend Lane Closures
Baltimore County
MD 542 (Loch Raven Boulevard) from Cromwell Bridge Road to Joppa Road - Weekend Concrete Pavement Patching – Continuous single lane closures on MD 542 northbound and southbound, weather permitting: 9 p.m. Friday 4/19 through 5 a.m. Monday 4/22. Traffic alert is available
here.
Week Ahead Lane Closures
Anne Arundel County
I-97 Concrete Pavement Patching Project – Weekend concrete work starting 8 p.m. Friday along southbound I-97 near New Cut Road and Benfield Blvd exits. Lane(s) will remain closed until concrete cures and are opened for travel. Drivers advised to use MD 2, MD 295 and I-95 as alternate routes. Traffic alert is available
here.
MD 100 Resurfacing between MD 170 and the Howard County line - Nighttime lane and ramp closures resume Sunday, April 21; permitted overnight scheduled work hours 8 p.m. - 5 a.m. Traffic alert is available
here.
US 50 Bridges Approaches – Nighttime single lane closures at eastbound US 50 bridge over the Patuxent River near the Prince George’s County line. Traffic alert is available
here.
Baltimore County
Additional details are available at the above Portal Page link.
• I-695 Outer loop from I-95 to I-70
• Northbound Harford Road to I-695 outer loop ramp
• Northbound Perring Parkway to I-695 outer loop ramp
Additional details are available at the above Portal Page link.
I-695 and I-83 (Baltimore Harrisburg Expressway) Areawide Interstate Pavement Patching – Temporary overnight lane closures and overnight ramp closures/detours scheduled at interchanges on I-695 Inner Loop in Towson area, between Exit 23, I-83 (JFX) and Exit 27, MD 146. I-83 (BHX) in the Maryland Line area between Exit 36, MD 439 and Exit 37, Freeland Road (MD/PA line) late spring 2024.
US 1 (Belair Rd.) from Sunshine Ave./ Bradshaw Rd./Jerusalem Rd. Intersection to Open Bible Way – Resurfacing – Single-lane closures on US 1 Monday – Friday 8 a.m. - 4 p.m. through late spring. Learn more
here.
MD 139 (Charles Street) City/County line to MD 134 (Bellona Ave) - Waterline replacement and roadway improvements. Single lane closures northbound and southbound (with aux/turn lane closures where needed at intersections). Daytime 9 a.m. - 3 p.m. Monday – Friday and overnight 8 p.m. – 5 a.m. Sunday – Thursday, through fall 2026.
Calvert County
MD 4 (Governor Thomas Johnson Bridge) and MD 231 (Benedict Bridge) bridge routine maintenance - Scheduled Sunday, April 21 for the MD 4 bridge and Sunday, April 28 for the MD 231 bridge. Traffic will be guided using a flagging operation between 6 a.m. and 2 p.m., weather permitting. Traffic alert is available
here.
Carroll County
Frederick County
MD 77 (Foxville Rd) between Pryor Rd and Park Central Rd – Drainage improvements – Road closure is expected to end by June. The Maryland Environmental Service is replacing a sewer line. Local traffic and emergency vehicles will have access. Traffic alert is available
here.
Harford County
US 40 (Pulaski Highway) between the Baltimore/Harford County line (Little Gunpowder Falls) and MD 152 (Mountain Road/Magnolia Road) - Paving - Weekdays, single lane closures 9 a.m. to 3 p.m. through early May. Traffic alert is available
here.
Montgomery County
MD 586 (Veirs Mill Road) between Newport Mill Rd and MD 28 (First Street) – Resurfacing – Single-lane closures and lane shifts overnight, Sundays through Thursdays, 9 p.m. to 5 a.m. Traffic alert available
here.
Prince George’s County
MD 704 from Greenleaf Road to Ardwick Ardmore Road – Resurfacing – Single-lane and ramp closures overnight, Sundays through Thursdays, 8 p.m. to 5 a.m. Traffic alert is available
here.
MD 5 from Old Branch Avenue to Curtis Drive – Resurfacing – Single-lane closures overnight, Sundays through Thursdays, 8 p.m. to 5 a.m. Traffic alert is available
here.
Washington County
I-68 at Creek Road – Bridge replacement work – Single right lane closures eastbound and westbound will be continuous throughout the duration of the project. For additional information, the traffic alert is available
here.