All work is weather dependent
Real-time travel conditions and live traffic cameras – www.md511.maryland.gov
Week Ahead
Anne Arundel County
MD 270 between MD 2 and MD 648 – Pavement Resurfacing – Single lane closure with a flagging operation, 9 a.m. to 3 p.m. weekdays.
.
Baltimore County
I-95 at I-695 – Southwest Interchange - Pre-construction traffic shifts, lane marking, installation of construction barriers and shields in work zone for multi-bridge rehabilitation project. NEW
Sunday, Dec. 4:
Lane Closures: Northbound and Southbound I-95 Single, double and triple lane closures between 7 p.m. Sunday and 5 a.m. Monday.
Ramp Closure: Ramp from Northbound I-95 to Eastbound I-695 (Beltway Outer Loop) between 7 p.m. Sunday and 5 a.m. Monday.
Monday, Dec. 5 and Tuesday, Dec. 6
Lane Closures: Northbound and Southbound I-95 single and double lane closures between 7 p.m. Monday and 5 a.m. Tuesday and again between 7 p.m. Tuesday and 5 a.m. Wednesday.
Wednesday, Dec. 7
Lane Closures: Northbound and Southbound I-95 single and double lane closures between 7 p.m. Wednesday and 5 a.m. Thursday
Ramp Closure: Ramp from Northbound I-95 to Westbound I-695 (Beltway Inner Loop)
Thursday, Dec. 8
Lane Closures: Northbound and Southbound I-95 single and double lane closures between 7 p.m. Thursday and 5 a.m. Friday.
I-695 TSMO Project: I-695 Outer Loop near MD 140 (Reisterstown Rd.) – Set temporary construction work zone barrier - Overnight single and double lane closures from 8 p.m. to 5 a.m. the next morning, Sunday, Dec 4 through Thursday, Dec. 8. NEW
I-695 TSMO Project: I-695 Inner/Outer loop from US 40 (Balto. National Pike) to MD 26 (Liberty Road) – Staging construction materials and equipment – Overnight single and double lane closures from 8 p.m. to 5 a.m. the next morning, Sunday, Dec 4 through Thursday, Dec. 8.. NEW
I-695 TSMO Project: Westbound I-70 from Ingleside Ave. Bridge to I-695 – Installation of construction staging area - Overnight single and double lane closures on westbound I-70, 8 p.m. to 5 a.m. the next morning, Sunday, Dec. 4 through Thursday, Dec. 8 NEW
I-695 TSMO Project: I-695 Outer Loop from I-83 to I-70 – Remove and relocate construction traffic barriers - Overnight single and double lane closures from 8 p.m. to 5 a.m. the next morning, Sunday, Dec 4 through Thursday, Dec. 8. NEW
MD 25 (Falls Road) between MD 128 (Butler Rd.) and MD 137 (Mt. Carmel Rd.) – Highway Maintenance Patching – Lane closures and flagging operation in place along sections of MD 25 weekdays 9 a.m. to 3 p.m. through late December 2022. Updated
MD 26 (Liberty Rd.) from I-695 to North Rolling Rd. – ADA Sidewalk Improvements - Overnight single lane closures along this section of Liberty Road Sundays through Thursdays between 9 p.m. and 5 a.m. the following morning. Daytime single lane closures on this section of Liberty Road possible Mondays through Fridays between 9 a.m. and 12:30 p.m. through late December 2022.
MD 542 (Loch Raven Boulevard) from Taylor Avenue to Joppa Road - Highway maintenance pavement patching - Occasional overnight single lane closures and flagging operations for final punchlist tasks between 9 p.m. and 5 a.m. the next morning, Sundays through Thursday through late December 2022.
Calvert County
MD 4 at Mount Harmony Road – Median closure and crossover work for intersection reconstruction - Daytime single lane closure along northbound and southbound MD 4 between 9 a.m. and 3 p.m. if needed.
Carroll County
MD 30 (Hanover Pike/Hampstead Bypass) between Basler Rd and Baltimore Co line – Highway maintenance project – Single lane closure and flagging operation weekdays from 9 a.m. to 3 p.m. Project is expected to be complete by the end of the year.
Springfield Ave (MD 851) between Spout Hill Road and Walnut Ave - Drainage improvement project – Single-lane closure during the work hours of 9 a.m. to 3 p.m. Monday through Friday so crews can safely install a new sewer manhole and pipes underneath Springfield Avenue. MDOT SHA expects the work to be complete this spring.
Dorchester County
US 50 East and West from Old Ocean Gateway to MD 331 (Rhodesdale-Vienna Rd) - Structure replacement –Single lane and shoulder closures 6 a.m. - 6 p.m. through January. Updated
Frederick County
I-70 from east of the MD 75 (Green Valley Road) exit to the Carroll County line - Highway maintenance project - Starting at 9 p.m. on Sunday, December 4, crews will close one lane of eastbound I-70 to improve the roadway surface. There will be single and double lane closures as needed during the monthlong project. The schedule is Sunday through Thursday from 9 p.m. to 5 a.m. the following morning.
I-70 at MD 75 (Green Valley Road) – Bridge deck demolition – Single lane closure on I-70 overnight during the following hours:
• Daytime Monday through Friday from 9 a.m. to 4 p.m.
• Overnight Sunday through Thursday from 10 p.m. to 5 a.m.
Demolition work is expected to be complete in December.
Harford County
MD 24 (Vietnam Veterans Memorial Highway) from MD 924 (Tollgate Road/Emmorton Road) to MacPhail Road and from Wheel Road to Singer Road – Pavement Milling and Resurfacing – Overnight temporary single lane closures/traffic lane shifts on MD 24 northbound and southbound between 8 p.m. and 5 a.m. the next morning, Sundays through Thursdays through late December.
MD 24 (Vietnam Veterans Memorial Highway) from Singer Road to MacPhail Rd. - Pavement resurfacing - Temporary single lane closures and lane shifts between 8 p.m. and 5 a.m. the next morning, Sunday – Thursday, and on Fridays if needed, until late December. Updated
Montgomery & Prince George’s Counties
Purple Line – For a list of active construction and lane closures along the Purple Line alignment, please click
HERE (MTA project).
St. Mary’s County
MD 5 (Point Lookout Road) between Abell/Moakley Streets and MD 245 (Hollywood Road) - Single and/or double lane closures, Sundays through Thursdays, 8 p.m. to 5 a.m.
Wicomico County
Eastbound US 50 from White Richardson Road to East of Bent Pine Road – Milling, patching, paving and striping operations - Double lane and shoulder closures with flagging operations weekdays 7 a.m. - 5:30 p.m. through November.
Worcester County
MD 378 (Baltimore Ave) from South 1st Street to N. Division – Milling, patching, paving and striping operations – Double lane closures weekdays 8 a.m. - 4:30 p.m. through January 202
Long-Term Closures
Allegany County
I-68 (National Freeway) to Street Road - Crews will be patching, milling, and paving. There will be daily closures both EB and WB. Signs, barrels, and cones will be in place. Work times will vary between night work and daytime work. Weather permitting, this project is expected to be completed by mid-November.
Anne Arundel County
Southbound MD 2 (Ritchie Highway) between Cypress Creek Road and US 50 - Resurfacing - Overnight single Lane closures between 10 p.m. and 5 a.m., Sundays through Thursdays with temporary overnight ramp detours.
MD 2 between the South River bridge and MD 214 - Pavement Resurfacing and sidewalk reconstruction between 8 p.m. and 5 a.m., Sunday through Thursday nights with lane closures.
I-97 Southbound between MD 450 and MD 178 – Pavement Patching – overnight single lane closures between 9 p.m. to 5 a.m., Sunday through Thursday nights.
Baltimore County
Raphael Road overpass of I-95 (JFK Memorial Expressway) - MDTA Reconstruction Project – MDTA closed the Raphael Road overpass as part of the I-95 Express Toll Lanes (ETL) Northbound Extension project. The closure will be in place through early 2023 and traffic is being detoured to the Bradshaw Road overpass.
I-70 Westbound between I-695 and the Patapsco River/Howard Co. Line – Asphalt Pavement Resurfacing and Safety Improvements – Single and double lane closures on westbound I-70 daytime Monday – Friday 9 a.m. to 3 p.m. and overnight Sunday – Thursday 7 p.m. to 5 a.m. the next day, through early 2023. There will also be temporary overnight interchange ramp closures and detours for paving work Sunday – Thursday nights (posted in advance on digital message boards).
I-70 Westbound and Eastbound between the Baltimore City Line and I-695 – Concrete Pavement Resurfacing – Single and double lane closures on I-70 east of I-695 weekdays Monday – Friday 9 a.m. to 3 p.m. and continuous lane and/or ramp closures on selected weekends for concrete pour and cure from 9 p.m. Friday through 5 a.m. Sundays, until early 2023.
I-695 Bridge over US 40 (Baltimore National Pike) - Bridge support structure rehabilitation – Crews are working on repairs to bridge piers and abutments under I-695 with long-term traffic shifts and temporary lane closures on US 40 eastbound and westbound underneath I-695 in Catonsville through early spring 2023. Updated.
I-695 North (Beltway Inner Loop) Noise Wall from MD 144 to US 40 – Construction of new noise wall – Single lane or shoulder closures possible along I-695 Inner Loop from MD 144 to Edmondson Ave. during off-peak hours when necessary for installation of noise wall. NEW
US 40 (Pulaski Highway) Dual Bridges over Little Gunpowder Falls and (Big) Gunpowder Falls -Bridge rehabilitation – Construction work will proceed on all four bridges through spring 2023, with ongoing temporary single lane closures on eastbound and westbound US 40 in the vicinity of the bridges during the following off-peak times: Daytime (Monday – Saturday) Westbound US 40: 8 a.m. to 4 p.m. Eastbound US 40: 7 a.m. to 4 p.m. Overnight (Sunday – Thursday) Westbound and Eastbound US 40: 7 p.m. to 5 a.m. the next day.
MD 25 (Falls Road) between Baltimore City / County Line and I-695 – Baltimore County DPWT water line replacement project - Overnight lane closures with flagging operations along sections of Falls Road, 9 p.m. - 5 a.m. the next day Sunday – Thursday, with some daytime work as needed 9 a.m. - 3 p.m. through spring 2024.
MD 26 (Liberty Road) between Brenbrook Drive and N. Rolling Road - ADA Sidewalk Reconstruction/Upgrades - Occasional temporary overnight single lane closures on MD 26 between 9 p.m. and 5 a.m. the next day Sunday - Thursday and now between 9 a.m. and 12:30 p.m. Monday - Thursday through late December 2022. Updated.
MD 30 (Hanover Pike) at Mt. Gilead Road – Intersection Improvements – New left turn lane from MD 30 northbound to Mt. Gilead Rd. open to traffic. Lane closures with flagging operations at intersection for installation of final pavement markings, reflective markers and guardrails 9 a.m. - 3 p.m. Monday through Friday through December 2022. Updated
MD 43 (White Marsh Blvd.) at Honeygo Blvd. - Intersection Widening and Improvements - Temporary daytime lane closures on MD 43 and Honeygo Blvd. legs of the intersection between 9 a.m. and 3 p.m. Monday-Friday, and overnight lane closures at any time between 8 p.m. and 5 a.m. the next day Sunday-Thursday. When necessary, there will be temporary lane closures on weekends, 7 a.m. - 1 p.m. Saturday and/or Sunday through early spring 2022. Updated
MD 140 (Reisterstown Road) between I-695 and Mt. Wilson Lane/ Grey Rock Rd. with MD 140 at Hooks Lane - Americans with Disabilities Act (ADA) improvements - includes traffic signal upgrades, crosswalk markings, and paving on MD 140 and also on Hooks Lane at MD 140. Temporary daytime single lane closures on MD 140 between 9 a.m. and 3 p.m. Monday – Friday and overnight single lane closures on Hooks Lane approach to MD 140 between 9 p.m. and 5 a.m. the next morning Sunday – Thursday.
MD 140 (Reisterstown Rd.) between E. Pleasant Hill Rd. and Stocksdale Ave. –Resurfacing/County Water Main replacement - Daytime single lane closures Monday - Friday 9 a.m. - 3 p.m. between E. Pleasant Hill Rd and Stocksdale Ave. Nighttime single lane closures within project limits Sunday – Thursday nights between 8 p.m. and 6 a.m. the next day. Access to driveways in this section will be maintained during any lane closures. Project scheduled through late summer 2024.
MD 147 (Harford Road) / Joppa Road - Intersection Improvements - Daytime single lane closures and flagging operations on Harford and Joppa Roads in the vicinity of the intersection Monday – Thursday 9 a.m. - 4 p.m. Monday – Thursday and 9 a.m. - 3 p.m. Fridays. Overnight work with lane closures Sunday – Thursday 9 p.m. - 5 a.m. the next day. Concrete median construction and final pavement milling and asphalt paving work on Joppa Road approaches to Harford Road through late December 2022. Updated
MD 151 (Sparrows Point Blvd.) / Wharf Road (MD 151 B) Interchange - Three-bridge replacement project at interchange – New traffic pattern in effect as of Nov. 16: Northbound and southbound Wharf Road (and the northern bridge) are now open to traffic between MD 158 (Bethlehem Blvd.) and the left-turn ramp to MD 151. This ramp and bridge is now open to access TPA. Wharf Road remains closed underneath both the MD 151 bridge (southern bridge) and the ramp bridge (middle bridge) for bridge construction through spring 2024. Bridge replacement and other construction work within the interchange scheduled to continue through summer 2024.
Cecil County
MD 213 (Augustine Herman Highway) bridge over C&D Canal in Chesapeake City – U.S. Army Corps of Engineers bridge repair project. Occasional single lane closures and flagging will occur 9 a.m. to 3 p.m., Monday-Thursday. View real-time traffic conditions at the bridge with these cameras: MD 213 at Basil Ave. (south side) and MD 213 at Lock St. (north side).
MD 279 (Elkton Road) at MD 277 (Fletchwood Road) – Northbound MD 279 is reduced to a single lane at the MD 277 intersection near the Delaware line and shifted across the median to a contraflow pattern (one lane in each direction). This is part of the Delaware Department of Transportation (DelDot) reconstruction of route 279.
Frederick County
Northbound US 15 Bridge over MD 77 – Bridge Deck replacement project – The right lane is closed. Each side of the bridge is expected to take six to eight months to finish. The entire project is expected to be complete by spring 2023.
Garrett County
MD 39 (Hutton Road) from Ashby Ellis to US 219 in Oakland – Drainage improvement and repaving project, flagging operation, 7 a.m. - 5 p.m. Monday-Friday
Harford County
Old Joppa Road Bridge over I-95 (MDTA project) – Bridge replacement project – Old Joppa Road closed and locally detoured.
Howard County
MD 94 bridge over I-70 - Bridge deck replacement project - Northbound MD 94 lane is closed.
Montgomery County
MD 97 (Georgia Avenue) from north of Gold Mine Road to south of Holiday Drive - MD 97 relocation project. Intermittent off-peak single and multiple lane closures, weekdays, 8 a.m. to 4 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through year-end 2022.
Brookeville Road from MD 97 (Georgia Avenue) to Grayheaven Manor Road. Sewer relocation project. Full 24/7 road closure with detour through late fall 2022. Drivers should add extra commute time and use MD 97 and MD 108 as alternate routes.
Brighton Dam Road near MD 97 (Georgia Avenue). MD 97 relocation project excavation and new road resurfacing work. Off-road activity with an intermittent off-peak flagging operation and single lane closures, Sunday through Saturday from sunrise to sunset through year-end 2022.
MD 108 (Olney Sandy Spring Road) from Olney Mill Road to Brooke Road. Safety and resurfacing project. Off-peak single daytime lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 8 p.m. to 5 a.m. through late summer 2023.
MD 185 (Connecticut Avenue) at Jones Bridge Road/Kensington Parkway Intersection improvement project - Single off-peak lane closures on MD 185, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. and single off-peak lane closures on Jones Bridge Road, weekdays, 9 a.m. to 3 p.m. and overnight, 7 days per week, 9 p.m. to 5 a.m. through late summer 2023.
MD 187 (Old Georgetown Road) from Tilden Lane to Nicholson Lane/ Safety and resurfacing project. Off-peal single daytime weekday lane closures, 9 a.m. to 3 p.m. and overnight lane closures, Sunday through Thursday, 8 p.m. to 5 a.m. through year-end 2022.
Southbound I-270 between I-70 and I-495 (Capital Beltway) - Traffic congestion relief construction project - Intermittent single lane closures, weekdays, 10 a.m. to 3 p.m. and single, double, and triple overnight lane closures, Sunday through Thursday, 7 p.m. to 5 a.m. and intermittent temporary ramp closures with detours up to 24 hours a day through late summer 2023.
Prince George’s County
US 1 (Baltimore Avenue) College Avenue to MD 193 (University Boulevard) - US 1 Reconstruction Project - Corridor Improvement- Northbound and southbound single lane closures throughout the length of the project Saturday through Sunday, 10 a.m. to 4 p.m. and 9 p.m. tm. through late summer 2023.
US 1 (Baltimore Avenue) from Rhode Island Avenue to MD 212A (Powder Mill Road). Safety and resurfacing project. Off peak single and multiple lane closures, weekdays, 9 a.m. to 3 p.m. through late summer 2023.
US 1 (Rhode Island Avenue) from Charles Armentrout Drive to Farragut Street. Rhode Island Avenue Trolley Trail project. Single and multiple off-peak lane closures, weekdays, 9 a.m. to 3 p.m. through year-end 2023.
MD 210 at Livingston Road/Kerby Hill Road. Interchange construction project. Intermittent off-peak single and multiple lane closures, Monday through Saturday, 9 a.m.to 3 p.m. and overnight, Sunday through Thursday, 8 p.m.to 5 a.m. through late fall 2022.
MD 212A (Powder Mill Road) from Pine Street to US 1 (Baltimore Avenue) - Roadway reconstruction project. Intermittent single and multiple lane closures weekdays, 8 a.m. to 4 p.m. through late fall 2022.
MD 223 (Woodyard Road) from Sherwood Drive to Victoria Drive - Sidewalk construction project - Off-peak lane closures, weekdays, 8:30 a.m. to 3:30 p.m. and Saturdays, 8 a.m. to 5 p.m. through late fall 2022.
MD 223 (Woodyard Road) at Dower House Road - Geometric improvement project - Single weekday lane closures, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through late fall 2022.
MD 500 (Queens Chapel Road) from Eastern Avenue to MD 208 (Hamilton Street) Community safety and enhancement project. Intermittent single and multiple lane closures weekdays,9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 7 p.m. to 6 a.m. through late fall 2022.
U S 1 (Baltimore Avenue) over I-495 (Capital Beltway) - Bridge painting and cleaning project. Single and multiple off-peak lane closures; 8 p.m. to 5 a.m. through year-end 2022.
Queen Anne’s County
US 301 (Blue Star Memorial Highway) between MD 291 and Pfalzgroff Lane – Bridge replacement. US 301 is reduced to one lane in each direction through Fall 2023. Northbound traffic is being shifted across the median to run on one lane of the southbound alignment. This is an ASE (Automated Speed Enforcement) work zone with a reduced speed limit of 45 mph.
Talbot County
MD 33 (Talbot St.) from Spencer Ave. to Lee St. in St. Michaels - Sidewalk project. Occasional single-lane closures and flagging 9 a.m. to 3 p.m. Monday-Thursday through spring 2023.
Washington County
Eastbound and westbound I-70 at the MD 65 (Sharpsburg Pike) – Bridge rehabilitation and widening of I-70 bridges over MD 65 – motorists should expect periodic shoulder work and nighttime lane closures.
Westbound I-68 (National Freeway) between Mountain Road and MD 144 – Patching, milling, and paving. Motorists should expect some intermittent lane closures. Sundays through Thursdays. Once westbound is completed work will begin eastbound.