MDOT SHA LogoAll Work is Weather Dependent Real-Time travel conditions and live traffic cameras md511.maryland.gov This Weekend Baltimore/Harford County Line US 40 Dual Bridges over Little Gunpowder Falls and (Big) Gunpowder Falls – Bridge Replacement - Single lane closures on US 40 East and West in the vicinity of the bridges at any time between 7 a.m. and 4 p.m. on Saturdays through summer and fall 2021. Updated Baltimore County MD 695A (Broening Hwy.) between Maryland Ave. and east of Ralls Ave. at Baltimore City/County Line in Dundalk - Roadway Resurfacing and Safety Improvements – Weekend work on Broening Hwy. with continuous lane closures on northbound and southbound 8 p.m. Friday – 5 a.m. Monday scheduled to occur on weekends through late July. Week Ahead Anne Arundel County MD 169 between Hammonds Ferry Road and MD 648 - Daytime flagging operation, 9 a.m. to 3 p.m., Monday through Friday. MD 256 between the MD 258 roundabout and the Rockhold Creek bridge – Daytime single lane closures, 8 a.m. to 4 p.m., Monday through Friday. MD 176 between Wright Road and Arundel Mills Boulevard/New Ridge Road – Daytime single lane closures, 8 a.m. to 4 p.m., Monday through Friday. MD 450 between Annapolis Street to US 50 (John Hanson Highway) near the Naval Academy Bridge – overnight patching, Sunday through Thursday night, 9 p.m. to 5 a.m. MD 435 (Taylor Avenue) between MD 70 (Rowe Boulevard) and MD 450 (West Street) - overnight patching, Sunday through Thursday, 9 p.m. to 5 a.m. Baltimore City HIGH IMPACT I-895 (Baltimore Harbor Tunnel Throughway) between the tunnels and Boston Street/O’Donnell Street (exit 11) and the Holabird Avenue exit (MDTA Project) –Bridge rehabilitation project – Expect lane closures during off-peak travel times into summer 2021. Updated Baltimore County HIGH IMPACT MD 146 (Dulaney Valley Rd.) Three Culverts Replacement – At 9 a.m. on Monday July 19, MDOT SHA will close the section of MD 146 between north of Timonium Road and south of Old Bosley Road to all traffic for three weeks. Through traffic on MD 146 between Towson and Jacksonville will be diverted to a posted detour route including I-695 (Baltimore Beltway), MD 45 (York Rd.) and MD 145. Weather permitting, the roadway will re-open on or about Monday, August 9. HIGH IMPACT I-695 Southwest Outer Loop Widening Project (US 40 to south of MD 144) - Major Roadway Widening and Bridge Replacement. Schedule for July 18 – 22: Outer Loop and Inner Loop from US 40 (Baltimore National Pike) to MD 144 (Frederick Rd.) Single lane closures 9 a.m.-3 p.m. and shoulder closures 7 a.m.-7 p.m. Monday-Friday. Updated I-695 Inner and Outer Loop from I-70 to Lillian Holt Drive - Soil borings – Right and left shoulder and single lane closures for rolling operations by contractor team for soil borings alongside I-695 Inner and Outer Loop between US 40 and I-795 at any time between 8 p.m. and 5 a.m. the next day, Sunday 7/18 through Thursday 7/22. MD 137 (Mt. Carmel Rd.) from Gunpowder Rd. to MD 25 (Falls Rd.) - Highway Maintenance roadway pavement milling, patching and resurfacing - Weekday single lane closures with flagging operations on MD 137 between 9 a.m. and 3 p.m. Monday-Friday, in summer 2021. MD 45 (York Rd.) from Gifford Rd. to Middletown Rd. - Highway Maintenance roadway pavement milling, patching and resurfacing – Work is now daytime, with single lane closures with flagging operations on MD 45 between 9 a.m. and 3 p.m. Monday-Friday, in summer 2021. MD 26 (Liberty Road) from Deer Park Road to Owings Mills Boulevard - Highway Maintenance roadway pavement patching - Occasional single lane closures between 9 a.m. and 3 p.m. Monday through Friday in summer 2021. Calvert County MD 2 between Saint Michaels Court and the MD 2 / 4 intersection – Daytime single lane closures between 8 a.m. and 4 p.m. Charles County Southbound US 301 between MD 257 and the end of SHA maintenance prior to the Nice Bridge – Daytime single lane closures, 8 a.m. to 4 p.m., weekdays. MD 224 between the Reeder Run Bridge and Reeder Place – Milling and resurfacing, daytime single lane closures between 8 a.m. and 4 p.m. Frederick County I-270: Exit ramp from southbound I-270 to northbound MD 85 and exit ramp from northbound MD 85 to southbound I-270 - Pipe installation - Overnight closures from 9 p.m. to 5 a.m. Sunday night through Friday. The work and closures are expected to continue through the summer season. MD 75 (Green Valley Road) bridge over I-70 - Highway maintenance roadway patching - Overnight single lane closures Sunday nights through Friday mornings from 8 p.m. to 5 a.m. Crews will start on the northbound lanes which are expected to take two weeks to complete before switching to the southbound lanes. The project is expected to be complete in July. Northbound US 15 at Jefferson Street – Highway maintenance roadway patching – Starting Thursday, July 15, single lane closures on the roadway and exit ramp closure from 9 p.m. to 5 a.m. The work will continue on Sunday, July 18 and Monday, July 19. New MD 28 (Dickerson Road) bridge over the Monocacy River – Bridge deck replacement project – Single lane closures with a flagging operation weekdays from 8 a.m. to 4 p.m. starting Monday, July 19. Total bridge closure on three weekends starting Fridays at 10 p.m. and ending Monday at 5 a.m. on these dates: July 23-26 July 30-August 2 August 6-9 Harford County US 40 (Pulaski Hwy.) from MD 7A (Post Road) to Otsego Street – Highway maintenance pavement patching - Overnight single lane closures and lane shifts on eastbound and westbound US 40 Sunday-Thursday, between 9 p.m. and 5 a.m. the next day. Norfolk Southern Railroad crossing at MD 7 in Havre de Grace – Railroad crossing repairs – MD 7 (Revolution St.) at Norfolk Southern Railroad crossing will be closed 24/7 July 19-23 for at-grade railroad crossing repairs between Lewis Lane and Pusey Street. Detour route includes Revolution Street, Post Road, US 40 Otsego St. and Juniata St. New Howard County Northbound US 29 exit ramp to westbound US 40 - Howard County construction project - Exit ramp will close for one night starting Wednesday, July 21 at 10 p.m. and reopen the following morning at 5 a.m. The closure is necessary to assist with Howard County's construction of a stormwater detention basin for flood protection of downtown Ellicott City. New MD 32 (Patuxent Freeway) at Dorsey Run Road – Road surface improvement project – Single lane closures on MD 32 and Dorsey Run Road between 7 p.m. and 6 a.m. along with daytime single lane closures Dorsey Run Road. Ramp A (Eastbound MD 32 to Dorsey Run Road) is currently closed and expected to reopen on Thursday, July 22. Ramp B (Dorsey Run Road to Eastbound MD 32) will close starting Sunday, July 18. Motorists will be detoured to the MD 32/US 1 (Washington Boulevard) interchange. Updated Montgomery & Prince George’s Counties Purple Line – For a list of active construction and lane closures along the Purple Line alignment, please click HERE (MTA project). Montgomery County MD 410 (East West Highway) at MD 186 (Brookville Road). Inlet/sidewalk construction project. Single, off-peak lane closures, weekdays, 9 a.m. to 3 p.m. through year-end 2021.• US 29 (Colesville Road) from MD 97 (Georgia Avenue) to Spring Street. Resurfacing. Single and multiple lane off-peak lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through late summer 2021. NewPrince George’s County Inner Loop/Outer Loop of I-95/I-495 from Temple Hill Road to MD 414 (St. Barnabas Road). Roadway patching. Single and multiple off-peak lane closures, overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through late July 2021. New Inner/Outer Loop of I-95/I-495 over Suitland Parkway. Structural steel setting. Single and multiple off-peak lane closures with intermittent full traffic stops of up to 15 minutes, overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through late July 2021. New Southbound I-295 (Anacostia Freeway) ramp to northbound I-95/I-495 (Capital Beltway). Roadway patching. Full ramp closure with detour, overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through late summer 2021. Drivers should use southbound I-295, MGM National Avenue, to access northbound I-495. New MD 210 (Indian Head Highway) northbound ramp to northbound I-495 (Capital Beltway). Resurfacing. Full ramp closure with detour, overnight, Sunday through Thursday, 9 p.m. to 5 a.m. Drivers should follow detour signs and use northbound MD 210 and MD 414 (St. Barnabas Road) to access northbound I-495. MD 210 (Indian Head Highway) northbound ramp to southbound I-495 (Capital Beltway). Resurfacing. Full ramp closure with detour, overnight, Sunday through Thursday, 9 p.m. to 5 a.m. Drivers should follow detour signs and use northbound MD 210 and the exit to southbound I-495 to access southbound I-495. St. Mary's County MD 5 between Abell/Moakley Streets and MD 245 (Hollywood Road) - daytime single lane closures between 9 a.m. and 3 p.m. Updated Northbound MD 235 between By the Mill Road and north of MD 245 – Roadway milling and resurfacing. Crews are permitted to work overnight 8 p.m. to 5 a.m. or daytime 9 a.m. to 3 p.m. New MD 247 between MD 5 and Oakville Road – Daytime single lane closures for milling and resurfacing, 9 a.m. to 3 p.m. New Long-Term Closures Allegany County MD 51 (Industrial Boulevard) between Canal Parkway and Second Street – Bridge Rehabilitation – Northbound side of bridge closed - traffic is shifted onto the southbound side of the bridge – one lane traffic in each direction. MD 51 (Oldtown Road) over the C&O Canal near Paw Paw Tunnel – Bridge Rehabilitation - both lanes are closed and a temporary traffic signal is rotating traffic through a single center lane MD 135 west of the MD 36 Intersection and MD 135 and River Road area Westernport/Bloomington – Bank stabilization - northbound lane will be closed – southbound lane will be used for commute lane -Traffic signage, barriers, lights and flaggers will be in place for directing and maintaining traffic control. Anne Arundel County MD 2 between Pasadena Road and MD 270 (Furnace Branch Road) - Overnight single lane closures, Sunday through Thursday nights, 9 p.m. and 5 a.m. MD 32 at MD 3 interchange – Ramp resurfacing, Sunday through Thursday nights 9 p.m. and 5 a.m. Baltimore County MD 151 (Sparrows Pt. Blvd.) / Wharf Road (MD 151 B) Interchange - Three-bridge replacement project at interchange. The southbound side of the existing MD 151 bridge is closed and two-way traffic - one lane in each direction - runs on the northbound side of the bridge. This will be in effect for the next year and will enable partial demolition of the existing bridge over Wharf Road and future construction of the new bridge. This is in addition to the detours of southbound and northbound Wharf Road at the interchange. NOTES: As of May 12, the northbound side of MD 151 is closed between the Baltimore County Highways Maintenance Shop (1500 block) and the Wharf Rd. Interchange. Two-way traffic will run on the southbound side of MD 151 , one lane in each direction. The existing ramp from Northbound MD 151 to southbound Wharf Road is open for local traffic only. HIGH IMPACT US 1 Bridge over CSX Transportation rail lines – Bridge replacement – As of June 10, 2021, Clarke Blvd. at US 1 is closed/detoured 24/7, 7 days/week for one year. Posted detour route to and from US 1 (Washington Blvd.) includes Selford Road, Francis Avenue, Oregon/Carville Avenue, Tom Day Boulevard, and US 1 Alt. (Southwestern Blvd.) I-83 (Baltimore-Harrisburg Expressway) North and South Bridges over Padonia Road –Dual Bridge replacement and interchange improvements. There may be single lane closures on I-83 North and I-83 South between 9 a.m. and 4 p.m. Monday-Friday and between 7 p.m. and 5 a.m. the next day Sunday-Thursday. Single lane closures on Padonia Rd. West between 9 a.m. and 3 p.m. Monday-Saturday, and between 8 p.m. and 5 a.m. the next day Sunday-Thursday. Detours of Padonia Rd. underneath I-83 possible on any weeknights (Sunday-Thursday) between 8 p.m. and 5 a.m. the next morning. Note: Interchange Ramp from Padonia Road East to I-83 North closed 24 hours/7 days until project is complete. Cove Road bridge over I-695 - Bridge deck replacement - On I-695, daytime single lane closures in both directions Monday-Friday between 9 a.m. and 3 p.m. and overnight lane closures Sunday-Thursday between 7 p.m. and 5 a.m. the next day. On Cove Road bridge over I-695, long-term single lane closures are in effect, with two-way traffic shifted to northern side of the bridge deck. I-70 bridges over Patapsco River and CSX Rail Line at Baltimore/Howard Co. Line – Bridge Parapet Rehabilitation - Single lane closures Monday-Friday between 9 a.m. and 3 p.m. and overnight single and double lane closures Sunday - Thursday between 7 p.m. and 5 a.m. the next morning. Lane closures permitted when needed on Saturdays between 9 a.m. and 3 p.m. MD 695A (Broening Hwy.) between Maryland Ave. and east of Ralls Ave. at Baltimore City/County Line in Dundalk - Roadway Resurfacing and Safety Improvements – Daytime single lane closures on Broening Hwy. between 9 a.m. and 3 p.m. Monday-Thursday and between 9 a.m. and 2 p.m. Friday. Overnight double lane closures with traffic lane shifts on Broening Hwy. between 8 p.m. and 5 a.m. the next day Sunday-Thursday. Weekend work on Broening Hwy. with continuous lane closures northbound and southbound 8 p.m. Friday – 5 a.m. Monday scheduled to occur on weekends through July. US 40 Dual Bridges over Little Gunpowder Falls and (Big) Gunpowder Falls – Bridge replacement – Weekdays: Eastbound US 40 (towards Aberdeen) 6 a.m. to 4 p.m. Westbound US 40 (towards Baltimore) 8 a.m. to 4 p.m. Weeknights: Eastbound and Westbound US 40 Weeknights: 8 p.m. to 5 a.m. the next day, Sunday-Thursday nights. Saturdays: Single lane closures on Eastbound and Westbound in the vicinity of the bridges at any time between 7 a.m. and 4 p.m. on Saturdays through summer 2021. Updated MD 147 (Harford Road) at Joppa Rd. - Intersection Improvements - Single lane closures and flagging operations on Joppa Road east and west of Harford Rd. daytime between 9 a.m. and 4 p.m. Monday-Thursday and between 9 a.m. and 3 p.m. Friday. and overnights Sunday-Thursday between 9 p.m. and 5 a.m. the next day. MD 150 (Eastern Ave.) between the bridge over Back River and the intersection with Mace Ave./Riverside Dr. - Baltimore County Water main replacement and MDOT SHA highway resurfacing – Occasional single lane closures on westbound MD 150 for final daytime work Monday-Friday between 9 a.m. and 3 p.m. in summer. MD 140 (Reisterstown Rd.) between Painters Mill Rd. and E. Pleasant Hill Rd. –Resurfacing/County Water Main replacement - Crews currently installing new 36-inch water main from Owings Mills Blvd. to East Pleasant Hill Rd. with connections to fire hydrants and buildings along MD 140 summer 2021. Occasional daytime single lane closures between 9 a.m. and 3 p.m. between Owings Mills Blvd. and E. Pleasant Hill Rd. Night time single lane closures within project limits Sunday-Thursday nights between 9 p.m. and 5 a.m. the next day. Access to all driveways in this section will be maintained during any lane closures. MD 140 (Reisterstown Rd.) between E. Pleasant Hill Rd. and Stocksdale Ave. –Resurfacing/County Water Main replacement - Daytime single lane closures Monday-Friday between 9 a.m. and 4 p.m. until late summer 2021. Daytime single lane closures Monday-Friday between 9 a.m. and 3 p.m. between E. Pleasant Hill Rd and Stocksdale Ave. Night time single lane closures within project limits Sunday-Thursday nights between 8 p.m. and 6 a.m. the next day. Access to driveways in this section will be maintained during any lane closures. MD 45 (York Road) between north of Padonia Road and Wight Avenue – Roadway Resurfacing/County Water Main replacement – Single and double lane closures on MD 45 for overnight waterline utility and paving work between 9 p.m. and 5 a.m. the next day Sunday-Thursday and single lane closures where needed between 9 a.m. and 3 p.m. Monday-Friday. through late July. MD 43 (White Marsh Blvd.) at Honeygo Blvd. - Intersection Widening and Improvements - Temporary daytime lane closures on MD 43 and Honeygo Blvd. legs of the intersection between 9 a.m. and 3 p.m. Monday-Friday, and overnight lane closures at any time between 8 p.m. and 5 a.m. the next day Sunday-Thursday. When necessary, there will be temporary lane closures on weekends, between 7 a.m. and 1 p.m. Cecil County MD 279 (Elkton Road) at MD 277 (Fletchwood Road) – Northbound MD 279 is reduced to a single lane at the MD 277 intersection near the Delaware line and shifted across the median to a contraflow pattern (one lane in each direction) through summer 2021. This is part of the Delaware Department of Transportation (DelDot) reconstruction of route 279. Updated Frederick County I-270 (Eisenhower Highway) southbound from MD 121 (Clarksburg Road) to MD 109 (Old Hundred Road) I-270 acceleration lane expansion project. Single and multiple off-peak lane closures, weekdays 9:30 a.m.to 3:30 p.m. and overnight, Sunday through Thursday, 7 p.m. to 4 a.m. through year-end 2021. Possible Traffic Impact in Frederick County Harford County Old Joppa Road Bridge over I-95 (MDTA project) – Bridge replacement project – Old Joppa Road closed and locally detoured. Clayton Road bridge over I-95 between MD 152 and MD 24 (MDTA project) - Clayton Road closed and detoured until early 2022. MD 22 (Churchville Road) between MD 136 (Calvary Road) and Prospect Mill Road -Roadway resurfacing and intersection widening - Single lane closures/lane shifts on MD 22 east and west of Thomas Run Road/Shucks Road intersection when necessary between 9 a.m. and 3 p.m. Monday-Friday, and between 8 p.m. and 5 a.m. the next day Sunday-Thursday and between 7 a.m. and 1 p.m. Saturdays when necessary through late summer 2021. MD 132 (West Bel Air Ave.) between US 40 (Philadelphia Blvd./Pulaski Hwy.) and MD 462 (Paradise Ave.) - Intermittent concrete curb, ramp, sidewalk work on parts of MD 132 through summer 2021. MD 132 - MD 462 to the Railroad Crossing Monday-Friday, 7 a.m.-4 p.m. Sunday-Thursday, 9 p.m. until 5 a.m. the next day; MD 132 - Railroad Crossing to US 40 Sunday-Thursday, 9 p.m. until 5 a.m. the next day Sunday-Thursday, 9 a.m. until 11 a.m. (concrete work); MD 132 / US 40 Intersection Monday-Friday, 9 a.m.-3 p.m. MD 924 South (Kenmore Avenue) between US 1 and Main Street, and MD 924 (Emmorton Road) between Ring Factory Road and Plumtree Road -Roadway resurfacing and traffic signal upgrades - Concrete curb, ramp, sidewalk work on sections of MD 924 through spring 2021. MD 924 from Ring Factory Rd. to Plumtree Rd. Monday-Friday, 9 a.m.-3 p.m. and Sunday-Thursday, 9 p.m. until 5 a.m. the next day; MD 924 from US 1 to Kenmore Ave. Monday-Friday, 9 a.m.-3 p.m. and Sunday-Thursday, 9 p.m.-5 a.m. the next day through late summer 2021. Montgomery County MD 410 (East West Highway) at MD 186 (Brookville Road). Inlet/sidewalk construction project. Single, off-peak lane closures, weekdays, 9 a.m. to 3 p.m. through year-end 2021. MD 185 (Connecticut Avenue) at Jones Bridge Road/Kensington Parkway. Intersection improvement project. Single off-peak lane closures on MD 185, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. and single off-peak lane closures on Jones Bridge Road, weekdays, 9 a.m. to 3 p.m. and overnight, 7 days per week, 9 p.m. to 5 a.m. through late summer 2023. US 29 (Colesville Road) from St. Andrews Way to Stewart Lane. -Safety and resurfacing project - Single daytime lane closures, weekdays, 9 a.m. to 3 p.m. and double overnight lane closures, Sunday through Thursday, 9 p.m. to 5 a.m. through year-end 2021. MD 97 (Georgia Avenue) from north of Gold Mine Road to south of Holiday Drive. Roadway relocation project.- Intermittent single northbound and southbound lane closure MD 185 (Connecticut Avenue) from MD 547 (Knowles Avenue) to Dupont Avenue. Geometric/median improvement project. Single and multiple off-peak northbound and southbound lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 6 a.m. through late summer 2021. MD 190 (River Road) from MD 188 (Wilson Lane) to MD 614 (Goldsboro Road). Roadway improvement project. Single lane closures, weekdays, 9 a.m. to 3 p.m. and multiple lane closures, overnight, 9 p.m. to 5 a.m. through late summer 2021. MD 185 (Connecticut Avenue) from MD 547 (Knowles Avenue) to Dupont Avenue. Geometric/median improvement project. Single and multiple off-peak northbound and southbound lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 6 a.m. through year-end 2021. I-270 (Eisenhower Highway) from Interstate 70 to I-495 (Capital Beltway). Traffic congestion relief construction project - Intermittent single lane closures, weekdays, 10 a.m. to 3 p.m. and single, double and triple overnight lane closures, Sunday through Thursday, 7 p.m. to 5 a.m. and intermittent temporary ramp closures with detours up to 24 hours a day through late spring 2021. I-270 (Eisenhower Highway) southbound from MD 121 (Clarksburg Road) to MD 109 (Old Hundred Road). I-270 acceleration lane expansion project. Single and multiple off-peak lane closures, weekdays 9:30 a.m.to 3;30 p.m. and overnight, Sunday through Thursday, 7 p.m. to 4 a.m. through year-end 2021. Seminary Road from Hale Street to MD 192 (Forest Glen Road) - Bridge rehabilitation project - Intermittent left and right single northbound and southbound lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 8 p.m. to 5 a.m. through late fall 2021. Inner and Outer Loop of I-495 (Capital Beltway) from MD 97 (Georgia Avenue) to MD 185 (Connecticut Avenue). Bridge rehabilitation project. Intermittent single weekday single lane closures, 9 a.m. to 3 p.m. and intermittent overnight single double and triple lane closures and full traffic stops, Sunday through Thursday, 9 p.m. to 5 a.m. through late fall 2021. Prince George’s County US 1 (Baltimore Avenue), College Ave. to MD 193 (University Boulevard) - US 1 Reconstruction Project - Corridor Improvement- Northbound and southbound single lane closures throughout the length of the project Saturday through Sunday, 10 a.m. to 4 p.m. and 9 p.m. to 7 a.m. through summer 2023. MD 5 (Branch Avenue) from the DC Line to the intersection of Curtis Drive. Safety and resurfacing project. Intermittent/temporary single and multiple MD 5 northbound off-peak lane closures, weekdays, 9 a.m. to 3 p.m., overnight, Sunday through Thursday 7 p.m. to 5 a.m. and weekends, 5 a.m. to 10 p.m. and weekends 5 a.m. to 10 p.m. Intermittent/temporary single and multiple MD 5 southbound off-peak lane closures weekdays, 6 a.m. to 12 noon overnight, Sunday through Thursday, 7 p.m. to 6 a.m. and intermittent/temporary single and multiple MD 637 single lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 7 p.m. to 6 a.m. through late spring 2022. MD 210 (Indian Head Highway) at Kerby Hill Road/Livingston Road. Interchange construction project – Crossover from Kerby Hill Rd. to Livingston Rd. across MD 210 to close and be detoured. Click here for detour routes. Crews construction bridge that will connect the roads and will be complete by the end of 2021. MD 212A (Powder Mill Road) from Pine Street to US 1 (Baltimore Avenue). Roadway reconstruction project. Intermittent single and multiple lane closures weekdays, 8 a.m. to 4 p.m. through late summer 2022. Eastbound MD 214 (Central Avenue) ramp to northbound I-95/I-495 (Capital Beltway). Bridge construction project. Full ramp closure with detour through year-end 2021. Drivers should use the signed detour route of eastbound MD 214 to northbound MD 202 (Largo Road) to westbound MD 214 to access northbound I-95/I-495). MD 500 (Queens Chapel Road) from Eastern Avenue to MD 208 (Hamilton Street). Community safety and enhancement project. Intermittent single and multiple lane closures weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 7 p.m. to 6 a.m. through late summer 2022. Southbound I-95/I-495 (Capital Beltway) ramp to eastbound MD 214 (Central Avenue) – Bridge replacement project – Total ramp closure with traffic using the Capital Beltway/MD 202 (Largo Road) interchange and then to MD 214 via MD 202 to year end 2021. I-95/I-495 (Capital Beltway) over Suitland Road. Bridge replacement project. Intermittent single and multiple lane closures, weekdays, 7 a.m. to 5 p.m. and overnight, Sunday through Thursday, 8 p.m. to 5 a.m. and weekends, Saturday night 6 p.m. to 11 a.m. Sunday morning through late summer 2021. I-95/I-495 (Capital Beltway) from Suitland Road to MD 4 (Pennsylvania Avenue). Suitland Parkway bridge replacement project. Road shoulder closure permissible 24 hours daily, intermittent single and multiple lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Friday through Thursday, 8 p.m. to 6 a.m. through year-end 2021. St. Mary’s County MD 5 between Abell/Moakley Streets and MD 245 (Hollywood Road) - Daytime single lane closures between 9 a.m. and 3 p.m. Washington County I-70 Eastbound and Westbound at the MD 65 Interchange – Bridge rehabilitation and widening of I 70 bridge over MD 65- Left shoulder closed EB/WB long term for phase 1 work. Intermittent, single lane closures at nighttime from Sunday through Thursday between midnight and 5 a.m. on I-70. Additionally, alternating/single lane closures will be performed between 9 a.m. and 3 p.m., weekdays on MD 65 North/South. I-70 Eastbound and Westbound at MD 56 (Big Pool) - Bridge deck replacement and rehabilitation for the bridge over I-70 - Left and right shoulder closure. Intermittent flagging operations during the day will be used to guide motorists through the area during Monday-Friday from 7a.m.-5 pm. I-70 Eastbound/Westbound between Boyd Road and Ashton Road - Grinding and paving procedures and traffic barrier upgrades – Nightly lane closures – Sunday-Thursday, 8 p.m.-7 a.m. Single lane closures will be utilized to complete operations.