• Westbound I-70 Bridge over the Monocacy River –
Parapet wall repair from this week’s crash – Single lane closure beginning at 8 p.m. Sunday until 5 a.m. Monday.
• MD 194 (Woodsboro Pike) between Daysville Road and MD 26 (liberty Road) –
Resurfacing – Single lane closures guided by flaggers Sundays through Thursdays between 8 p.m. and 5 a.m. Project should be completed early next week.
Howard County
• MD 216 (Scaggsville Road) between MD 108 and US 29 (Columbia Pike) –
Pavement repair/patching – Single lane closures Sundays through Fridays between 8 p.m. until 5 a.m.
• Eastbound and westbound US 40 (Baltimore National Pike) between Centennial Lane and St. John’s Lane –
Resurfacing – Single and double lane closures Sundays through Fridays between 7 p.m. until 5 a.m.
• Southbound MD 32 between MD 108 and the Middle Patuxent River Bridge –
Resurfacing – Single lane closures Sundays through Thursday between 8 p.m. and 5 a.m.
Montgomery County
• MD 193 (University Boulevard) between Williamsburg Drive and Franklin Avenue –
Resurfacing - Double lane closures Sundays through Thursdays from 8 p.m. until 5 a.m.
Prince George’s County
• MD 295 (Baltimore Washington Parkway) Bridge over northbound I-95 (outer loop of I-495) –
Bridge repair - Double lane closures on NB I-95 beginning at 9 p.m. Sunday until 5 a.m. Monday.
• Eastbound US 50 between Lottsford Vista Road and the Anne Arundel County Line –
Resurfacing - Double lane closures Sundays through Thursdays from 9 p.m. until 5 a.m.
• I-95 between I-95/I-495 (Capital Beltway) and MD 212 (Old Gunpowder Road) -
Resurfacing - Double lane closures Sundays through Thursdays from 9 p.m. until 5 a.m.
Wicomico County
• MD 349 (Nanticoke Road) between Oliver Drive and Rockawalkin Road –
Road washout/pipe repair – Road closed and detoured until August.
A look ahead at next week
Anne Arundel County
• MD 436 (Ridgely Avenue) Swing Bridge over Weems Creek –
Routine bridge maintenance – Bridge to be in the open position (closed to vehicular traffic) from 7 p.m. Thursday until 7 a.m. Friday. Click here for more information.
New
• I-895 (Harbor Tunnel Thruway) Bridge over the Patapsco River (Patapsco Flats) (MDTA project) –
Bridge rehabilitation – Reduced lanes. Click here for more information.
Baltimore County
• Campbell Boulevard between Honeygo Boulevard and Franklin Square Drive (MDTA project) –
Express toll lane construction – Single lane closures starting June 13 from 6 a.m. to 5 p.m. Mondays through Fridays until late-August.
Frederick County
• Eastbound US 340 between MD 17 (Burkittsville Road) and Lander Road –
Resurfacing – Single lane closures from 10 a.m. until 3 p.m. and 8 p.m. until 5 a.m.
Garrett County
• I-68 (National Freeway) between US 219 and Shade Hollow Road –
Resurfacing – Single lane closures from 6 a.m. until 6 p.m.
• US 40 Alt. (National Pike) between US 219 (Chestnut Ridge Road) and Green Lantern Road –
Resurfacing – Single lane closures with flagging operations between 9 a.m. and 3 p.m., Mondays through Fridays.
Harford County
• MD 165 (Baldwin Mill Road) between MD 152 (Fallston Road/Mountain Road) and MD 23 (East-West Highway) –
Pavement repair/patching – Single lane closures from 6 a.m. until 4 p.m. and occasional Saturdays from 6 a.m. until 2 p.m.
New
• MD 155, I-95, MD 161, US 1, MD 136, MD 440, MD 543 and MD 165 –
Power generation equipment heavy transport – Rolling roadblocks behind convoy on Monday and Tuesday between 9 p.m. and 5 a.m. and Tuesday 10 a.m. until 3 p.m. and 8 p.m. until 5 a.m. Click here for route information.
New
Montgomery County
•
MD 195 (Carroll Avenue) between Jefferson Avenue and Flower Avenue (MD 195 Bridge over Sligo Creek and Parkway) -
Bridge rehabilitation – Bridge to closed and traffic detoured for one year beginning at 10 a.m. Monday.
Click here for more information.
Prince George’s County
• MD 704 (Martin Luther King, Jr. Highway) between Ardwick-Ardmore Road and 92nd Avenue -
Resurfacing - Single lane closures Sundays through Thursdays from 9 p.m. to 5 a.m.
Washington County
• I-70 between MD 56 (Big Pool Road) and Boyd Road –
Resurfacing – Single lane and shoulder closures Sundays through Thursday from 8 p.m. until 5 a.m.
• Northbound I-81 between I-70 and Halfway Boulevard –
Merge/auxiliary lane construction – Narrow and shortened ramps.