(All Work is Weather Permitting)
Anne Arundel County
• MD 710 (East Ordinance Road) at Pennington Avenue –
Concrete patching – Single lane closure between 9 p.m. Friday until 8 a.m. Sunday.
Baltimore County
• MD 147 (Harford Road) at I-695 (Baltimore Beltway) –
Highway widening/Interchange reconstruction – Left lane to close in both directions Sunday from 6 a.m. until 5 a.m. Monday.
• I-83 (Baltimore-Harrisburg Expressway) prior to and just past Cold Bottom Road –
Paving – Single lane closures from 7 p.m. Sunday until 5 a.m. Monday
• I-83 (Baltimore-Harrisburg Expressway) between Dairy Road and MD 45 (York Road) –
Resurfacing (grinding and paving) – Single lane closures Sundays through Thursdays from 7 p.m. until 5 a.m.
Carroll County
• MD 97 (Old Washington Road) between Streaker Road and the Howard County line –
Resurfacing – Single lane closure Sundays through Thursdays from 8 p.m. until 5 a.m.
Frederick County
•
MD 85 (Buckeystown Pike) between English Muffin Way and Manor Woods Road –
CSX rail crossing work – MD 85 to be closed between 4 a.m. Saturday until 6 p.m. Monday.
Click here for more information.
• MD 144 (Frederick Road) ramp to eastbound I-70 –
Ramp grinding and paving – Temporary ramp closure and detour Friday until Saturday from 11 p.m. until 6 a.m.
• MD 194 (Woodsboro Pike) between Daysville Road and MD 26 (Liberty Road) –
Resurfacing – Single lane closure Sundays through Thursdays from 8 p.m. until 5 a.m.
• US 40 Alternate (Old National Pike) between Bolivar Road and the Washington County line –
Resurfacing – Single lane closure Sundays through Thursdays from 8 p.m. until 5 a.m.
Howard County
• Northbound US 29 between Seneca Drive and Broken Land Parkway –
Highway widening project – Left lane closure Saturday between 8 a.m. and 12 noon.
• US 1 (Washington Boulevard) at Guilford Road –
Resurfacing – Single lane closure beginning at 8 p.m. Sunday until 5 a.m. Monday.
Howard County
• Eastbound and westbound US 40 (Baltimore National Pike) between Centennial Lane and St. John’s Lane –
Resurfacing – Single and double lane closures Sundays through Fridays between 7 p.m. until 5 a.m.
Montgomery County
• MD 193 (University Boulevard) between Williamsburg Drive and Franklin Avenue –
Resurfacing - Double lane closures Sundays through Thursdays from 8 p.m. until 5 a.m.
• US 29 (Colesville Road) Bridge over I-495 (Capital Beltway) –
Routine bridge inspection - Double lane closures on I-495 between 4 a.m. and 12 noon.
Prince George’s County
• Eastbound US 50 between Lottsford Vista Road and the Anne Arundel County Line –
Resurfacing - Double lane closures Sundays through Thursdays from 9 p.m. until 5 a.m.
• I-95 between I-95/I-495 (Capital Beltway) and MD 212 (Old Gunpowder Road) -
Resurfacing - Double lane closures Sundays through Thursdays from 9 p.m. until 5 a.m.
Wicomico County
• MD 349 (Nanticoke Road) between Oliver Drive and Rockawalkin Road –
Road washout/pipe repair – Road closed and detoured until August.
A look ahead at next week
Baltimore County
• Campbell Boulevard between Honeygo Boulevard and Franklin Square Drive (MDTA project) –
Express toll lane construction – Single lane closures starting June 13 from 6 a.m. to 5 p.m. Mondays through Fridays until late-August.
Frederick County
• Eastbound US 340 between MD 17 (Burkittsville Road) and Lander Road –
Resurfacing – Single lane closures from 10 a.m. until 3 p.m. and 8 p.m. until 5 a.m.
Garrett County
• I-68 (National Freeway) between US 219 and Shade Hollow Road –
Resurfacing – Single lane closures from 6 a.m. until 6 p.m.
Washington County
• Northbound I-81 between I-70 and Halfway Boulevard –
Merge/auxiliary lane construction – Narrow and shortened ramps.