Projects highlighted in red print indicate the potential for severe congestion.
(All Work is Weather Permitting)
Anne Arundel County
• Southbound I-97 between Quarterfield Road and New Cut Road – Concrete Patching – Double lane closures from 9 p.m. Friday until 5 a.m. Monday. Beachgoers should consider using MD 2 (Ritchie Highway) or MD 295 to MD 32 and back to I-97 as alternates.
• Westbound US 50 between Oceanic Avenue and Whitehall Road – Resurfacing – Double lane closures Monday from 9 p.m. to 5 a.m. Tuesday.
• Eastbound US 50 east of Severn River Bridge to Whitehall Road – Resurfacing – Two lanes blocked from 9 p.m. Sunday until 5 a.m. Monday.
• MD 179 (St. Margarets Road) between Buschs Frontage Road (at the US 50 interchange) and MD 648 (Baltimore Annapolis Boulevard) – Resurfacing – Single lane closures with a flagging operation. Grinding (removing the top layer of asphalt) will take place Mondays through Fridays between 9 a.m. and 3 p.m. and paving will occur at night Sundays through Thursdays between 8 p.m. and 5 a.m. each morning.
Baltimore County
• Northbound US 1 Alternate (Washington Boulevard) near Commerce Drive – Concrete bus pad installation - Single lane closure beginning at 4 a.m. Saturday until 2 p.m. Sunday.
Calvert County
• MD 231 (Benedict Bridge) over the Patuxent River – Bridge cleaning - Single lane closure with flagging operation Saturday from 6 a.m. until 2 p.m.
Calvert/St. Mary’s County Line
(Postponed)
• MD 4 (Thomas Johnson Bridge) over the Patuxent River – Bridge inspection - Single lane closure with flagging operation Sunday from 9 p.m. until 5 a.m. Monday.
Caroline/Talbot Counties
• MD 331 (Dover Road) at the Dover Bridge/Caroline/Talbot County lines – Bridge construction/fill operations – Traffic to be reduced to a single lane guided by flaggers Mondays through Saturdays between 9 a.m. and 7 p.m.
Carroll County
• MD 97 (Old Washington Road) between Streaker Road and the Howard County line – Resurfacing - Single lane closure with flagging operation Sunday from 9 p.m. until 5 a.m. Monday.
Kent County
• MD 213 Drawbridge over the Chester River (Chester River) – Bridge metal repairs – Single lane closures guided by a flagging operation. This will continue all week.
Montgomery County
• Outer loop of I-495 (Capital Beltway) between MD 97 (Georgia Avenue) and MD 185 (Connecticut Avenue) – Bridge deck repair – Two lanes closed from 9 p.m. Friday (tonight) until 5 a.m. Monday. Motorists should consider MD 200 (Intercounty Connector) as alternate.
Prince George’s County
• Eastbound US 50 between Lottsford Road and the Anne Arundel County line - Resurfacing – Single and double lane closures beginning 9 p.m. Sunday until 5 a.m. Monday.
A look ahead at next week
Anne Arundel County
• Westbound US 50 between Oceanic Avenue and Whitehall Road – Resurfacing – Double lane closures Monday from 9 p.m. to 5 a.m. Tuesday.
Baltimore County
• Southbound I-83 between MD 137 (Mt. Carmel Road) and Shawan Road – Resurfacing – Single lane closures Mondays through Fridays after 10 a.m. until 3 p.m. and Saturdays between 6 a.m. and 2 p.m.
• Campbell Boulevard between Honeygo Boulevard and Franklin Square Drive (MDTA project) – Express toll lane construction – Single lane closures starting June 13 from 6 a.m. to 5 p.m. Mondays through Fridays until late-August.
• MD 146 (Jarrettsville Pike) between MD 145 (Sweet Air Road/Paper Mill Road) and the Harford County line – Resurfacing – Single lane closures guided by a flagging operations Mondays through Fridays from 9 a.m. until 3 p.m. and Saturdays between 6 a.m. and 2 p.m.
Calvert/St. Mary’s County Line
• MD 4 (Thomas Johnson Bridge) over the Patuxent River – Deck patching - Single lane closure with flagging operation Tuesday and Wednesday nights 9 p.m. until 5 a.m. All lanes open by 5 a.m. Thursday.
Howard County
• US 40 (Baltimore National Pike) between the Little Patuxent River Bridge and St. John’s Lane – Resurfacing – Single and double lane closures starting Tuesday and continuing until the project is complete. Work hours are 9 p.m. until 5 a.m.
Montgomery County
• Inner loop of I-495 (Capital Beltway) between the I-270 west spur and Seminary Road – Resurfacing – Two lanes closed from 9 p.m. until 5 a.m.