SHA PLANNED LANE CLOSURE UPDATE (04/24/2015 – 04/27/2015)

MDOT SHA Logo

MDOT SHA Logo

Baltimore County

• I-695 (Baltimore Beltway) between MD 41 (Perring Parkway) and MD 7 (Philadelphia Road)Mobile pothole patching operation – Double lane closures on both loops of I-695 Saturday and Sunday from 5 a.m. until 1 p.m.

Baltimore/Carroll County Line

• MD 140 (Westminster Pike) Bridge over the Patapsco River (Baltimore/Carroll County Line)Bridge rehabilitation – Single lane closure on eastbound MD 140 on the bridge Saturday from 6 a.m. until 2 p.m. and changing traffic pattern using moveable barrier Saturday and Sunday.  Click here for more information. 

Caroline/Talbot County Line

• MD 331 (Dover Road) Bridge over the Choptank River Bridge replacement – Single lane closure with flagging operation Saturday 9 a.m. until 1 p.m.
 
Howard County
 
Southbound US 29 (Columbia Pike) between MD 32 and MD 175 - Guardrail repair - Single lane closure Saturday from 9 a.m. until 2 p.m.
 

 

The spring and summer construction season is getting into high gear. For a statewide listing of most SHA projects, click here for e-Road Ready 2015.

In addition to this project, drivers may also encounter mobile or short-term work zones. Always expect the unexpected, pay extra close attention and drive slowly through any work zone. Whether it is a tree trimming operation or a bridge project, be aware when orange is there: Think Orange (the color of construction equipment and signs), stay alert and slow down. Everyone is at risk. In four out of five work zone-related crashes, it is the driver or passenger who is injured or killed.

In 2014, nine people lost their lives in Maryland work zone crashes, including four highway workers. While SHA and its transportation partners work hard to keep traffic safely moving in work zones, please partner with us because work zone safety is everyone’s business – slow down and stay alert. Safer driving. Safer work zones. For everyone.


###