SHA PLANNED LANE CLOSURE UPDATE (06/27/2014 – 07/03/2014)

MDOT SHA Logo

MDOT SHA Logo

SHA will suspend planned lane closures in observance of the July 4th holiday on Thursday, July 3 and Friday, July 4.

Anne Arundel County

• Eastbound US 50 near MD 665 (Aris T. Allen Boulevard)Patching and pipe work – Double lane closures beginning at 8 p.m. Saturday with ALL lanes closed at 10 p.m. All lanes will re-open by 8 a.m. Sunday

• Outer loop of I-695 (Baltimore Beltway) ramp to northbound MD 170 (Camp Meade Road)Concrete patching – Temporary ramp closure and detour from 9 p.m. Friday until 5 a.m. Monday.

Carroll County

• Westbound MD 140 between Glen Falls Road and MD 91 (Gamber Road)Bridge rehabilitation – The right lane will be blocked on Saturday from 6 a.m. until 2 p.m.

Frederick County

 Northbound I-270 between MD 80 (Fingerboard Road) to I-70Resurfacing – Single lane closure beginning at 8 p.m. Sunday until 5 a.m. Monday.

Harford County

• MD 7 (Philadelphia Road) Bridge over James Run (north of MD 136) - Bridge replacement – Road is closed until late summer. Motorists will be directed to US 40 for the detour route. Click here for more information.

Montgomery County

• MD 355 (Rockville Pike/Wisconsin Avenue) from MD 191 (Bradley Lane/Bradley Boulevard) to MD 187 (Old Georgetown Road) - Traffic signal utility conduit work – Single and double lane closures from 10 p.m. Sunday until 5 a.m. Monday.

• Georgia Avenue between MD 390 (16th Street) and the Washington D.C. Line Roadway grinding and patching – Single and double lane closures from 9 p.m. Sunday until 5 a.m. Monday.

Prince George’s County

 MD 4 (Pennsylvania Avenue) from Ritchie Marlboro Road to Dower House Road Resurfacing – Double lane closures in both directions Sundays through Thursdays from 9 p.m. to 5 a.m.

• US 1 (Baltimore Avenue) from Indian Lane to Hollywood Road - Resurfacing - Single and double lane closures Sundays through Thursdays from 9 p.m. until 5 a.m.

• Westbound MD 193 (Greenbelt Road) between Rhode Island Avenue and Southway Paving/Resurfacing – Double lane closures from 9 p.m. Sunday until 5 a.m. Monday.
 
 


While SHA and its partners work hard to maintain safe traffic mobility in work zones, each driver needs to actively modify their driving style to help prevent crashes. Stay alert – look for reduced speed limits, narrow driving lanes and highway workers. Slow down and don't follow too closely. Safer Driving. Safer Work Zones. For everyone!

###