SHA PLANNED LANE CLOSURE UPDATE (06/30/2014 – 06/27/2014)

MDOT SHA Logo

MDOT SHA Logo

(All work is weather permitting.)

Anne Arundel County
 
The work on I-695 at Md 170 has been postponed until next weekend due to the threat of rain.

• Outer loop of I-695 (Baltimore Beltway) ramp to northbound MD 170 (Camp Meade Road)Concrete patching – Temporary ramp closure and detour from 9 p.m. Friday until 5 a.m. Monday.

Carroll County

• Eastbound and westbound MD 140 (Baltimore Boulevard) between Sandymount Road and Old Westminster Road - Patching - Single lane closures from 8 p.m. Friday until 6 p.m. Sunday.

• Westbound MD 140 between Old Westminster Pike to Glen Falls Road Bridge rehabilitation – The right lane will be blocked on Saturday from 6 a.m. until 2 p.m.

Frederick County

• Northbound I-270 between MD 80 (Fingerboard Road) to I-70Resurfacing – Single lane closure beginning at 8 p.m. Sunday until 5 a.m. Monday.

Harford County

• MD 7 (Philadelphia Road) Bridge over James Run (north of MD 136) - Bridge replacement – Road is closed until late summer. Motorists will be directed to US 40 for the detour route. Click here for more information.

Howard County

• Southbound I-95 between the Rest Area to MD 198 (Sandy Spring Road) Resurfacing – Double left lane closures from 7 p.m. Friday to 5 a.m. Saturday and 8 p.m. Saturday until 5 a.m. Sunday.

Montgomery County

• Southbound MD 185 (Connecticut Avenue) between Bradley Lane and Washington D.C. Line Roadway Patching/Utility relocation – Two right lanes blocked from 7 p.m. Friday until 3 p.m. Sunday. 

• MD 355 (Rockville Pike/Wisconsin Avenue) from MD 191 (Bradley Lane/Bradley Boulevard) to MD 187 (Old Georgetown Road) - Traffic signal utility conduit work – Single and double lane closures from 10 p.m. Sunday until 5 a.m. Monday.

• Georgia Avenue between MD 390 (16th Street) and the Washington D.C. Line Resurfacing – Single and double lane closures from 9 p.m. Sunday until 5 a.m. Monday.

Prince George’s County

• MD 4 (Pennsylvania Avenue) from Ritchie Marlboro Road to Dower House Road Resurfacing – Double lane closures in both directions Sundays through Thursdays from 9 p.m. to 5 a.m.

• US 1 (Baltimore Avenue) from Indian Lane to Hollywood Road - Resurfacing - Single and double lane closures Sundays through Thursdays from 9 p.m. until 5 a.m.

• Westbound MD 193 (Greenbelt Road) between Rhode Island Avenue and Southway Paving/Resurfacing – Double lane closures from 9 p.m. Sunday until 5 a.m. Monday.
 
 
 

While SHA and its partners work hard to maintain safe traffic mobility in work zones, each driver needs to actively modify their driving style to help prevent crashes. Stay alert – look for reduced speed limits, narrow driving lanes and highway workers. Slow down and don't follow too closely. Safer Driving. Safer Work Zones. For everyone!

 

###