MDOT SHA Logo
(July 25, 2013) – The State Highway Administration (SHA) will perform routine maintenance requiring short-term openings of the Dover Bridge over the Choptank River on Tuesday, July 30 between 9 a.m. and 3 p.m., weather permitting. The brief closures of the bridge will last no longer than those needed for an average vessel to pass through the open swing span.
SHA’s contractor, Covington Machine and Welding, Inc. of Annapolis, will perform the inspection and work. The routine maintenance includes: greasing the bridge locks; testing the opening and closing the bridge swing span; raising and lowering the traffic gates; checking all traffic and navigational lights; and checking all hydraulic oil levels for bridge motors.
If inclement weather prevents the maintenance work as originally scheduled, it will be conducted the next business day. Anyone with questions about the project may contact the SHA District 2 Office at 1-800-637-9740.
As crews strive to keep work zones safe, each driver needs to actively modify his or her driving style to help prevent crashes. Stay alert – look for reduced speed limits, narrow driving lanes and highway workers. Slow down and don’t follow too closely. Safer Driving. Safer Work Zones. For everyone!
# # #