SHA PLANNED LANE CLOSURE UPDATE (01/04/13 TO 01/11/13)

MDOT SHA Logo

MDOT SHA Logo

(All work is weather permitting. The blue text indicates a hyperlink to a map.)

Baltimore County
 
• Berrymans Lane Bridge over I-795 (north of Franklin Boulevard interchange) – Routine bridge inspection.  Single lane closures on southbound I-795 on Saturday, January 5 from 6 a.m. to 9 a.m. and single lane closures on northbound I-795 from 9 a.m. to 12 noon.
 
• Pleasant Hill Road Bridge over I-795 (north of Owings Mills Boulevard interchange) – Routine bridge inspection.  Single lane closures on southbound I-795 on Sunday, January 6 from 6 a.m. to 9 a.m. and single lane closures on northbound I-795 from 9 a.m. until 12 noon.

• MD 139 (Charles Street) Bridge over I-695 – Routine bridge inspection. Single lane closures on the inner loop of I-695 on Sunday, January 6 from 5 a.m. until 11 a.m.
 
Prince George’s
 
• Cherry Hill Road Bridge over I-95 (prior to I-495) – Routine bridge inspection.  Alternating double right and left lane closures along southbound I-95 on Saturday, January 5 from 5:30 a.m. to 11:30 a.m.
 
Montgomery
 
• Inner and outer loop of I-495 (Capital Beltway) between MD 650 (New Hampshire Avenue) and MD 193 (University Boulevard) – Bridge rehabilitation project.  Crews installing roadway sensors. Single and double lane closures beginning Sunday, January 6 at 8 p.m. to Monday, January 7 at 5 a.m.
 
Queen Anne’s County
 
• Westbound US 50 over US 301 – Bridge rehabilitation project-left lane closed on westbound US 50. 
 
###

###