THIS WEEKEND
Anne Arundel County
• Southbound I-97 between Quarterfield Road and MD 3 (Crain Highway) – Concrete patching.
Double left lane closures beginning at 10 p.m. Friday, November 30 until 8 a.m. Sunday, December 2.
Northbound I-97 between inner loop of I-695 (Baltimore Beltway) ramp and I-895 merge -- Concrete patching – Single left lane closures 10 p.m. Friday, November 30 to 8 a.m. Sunday, December 2.
Baltimore County
• Northbound I-795 between I-695 and Owings Mills - Concrete patching
Weekdays: Monday – Friday-9 a.m. – 3 p.m. – single lane closures.
Weeknights: Sunday – Thursday from 7 p.m. – 5 a.m. the next morning. If needed, double lane closures after 10 p.m.
Frederick County
• MD 80 (Fingerboard Road) at I-270 Bridge –Bridge painting – Temporary nighttime closures from 9 p.m. through 5 a.m. each night, Sunday, December 2, through Thursday, December 6. Follow detour.
Montgomery County
• MD 191 (Bradley Boulevard) Bridge over I-495 (Capital Beltway) – Routine bridge inspection. Double right and left lane closures on the outer loop I-495 on Saturday, December 1 from 4:30 a.m. until 11:30 a.m.
• Southbound MD 185 (Connecticut Avenue) between Saul Road and Washington Street – Retaining wall construction
Single lane closures on southbound MD 185 on Saturday, December 1 at 8 a.m. until 4 p.m.
Prince George’s County
• Northbound I-95/I-495 (outer loop of the Capital Beltway) at MD 201 (Kenilworth Avenue) – Bridge replacement project
Beginning 9 p.m. Friday, November 30, crews will begin lane closures to remove the demolition shield of the MD 201 Bridge over I-95 in Greenbelt. Three right lanes will be closed beginning at 12 midnight. All lanes will be open by 8 a.m. Saturday, December 1.
• US 50 (John Hanson Highway) Bridge over I-95/I-495 (Capital Beltway) – Routine bridge inspection. Double left lane closures on the outer loop (northbound) I-95/I-495 on Saturday, December 1 from 5 a.m. until 12 noon.
• Eastbound MD 193 (Greenbelt Road) between Cherrywood Lane and Branchville Road -- Concrete bus pad construction.
SHA will close the two right lanes on eastbound MD 193 beginning at 8 p.m. this Friday, November 30. All lanes will be open to traffic no later than 12 noon on Sunday, December 2.
Queen Anne’s County
• Westbound US 50 over US 301 – Bridge rehabilitation project-left lane closed on westbound US 50.
###