Stormwater Management Design Resources
Stormwater Management Design Guidance Drawings
  
    
The zip file above contains the guidance drawings listed below. 
   
      
         
            |  
               Facility | Revision Date | 
         
            | Bioretention (F-6) | 6-1-2022 | 
         
            | Submerged Gravel Wetland (M-2) | 6-1-2022 | 
         
            | Micro-bioretention for well-drained soils (M-6) | 6-1-2022 | 
         
            | Micro-bioretention for poorly drained soils (M-6) | 6-1-2022 | 
         
            | Bio-swale for well-drained soils (M-8) | 6-1-2022 | 
         
            | Bio-swale for poorly drained soils (M-8) | 6-1-2022 | 
         
            | Grass Swale (M-8) | 6-1-2022 | 
         
            | Wet Swale (M-8) | 6-1-2022 | 
Stormwater Management Site Development Criteria
    The criteria in this document includes context-sensitive measures for stormwater management facilities beyond the standards set forth in the 2000 Maryland Stormwater Design Manual. This document has been developed to assist stormwater designers to incorporate safety, sustainability, visual, and environmental quality features into stormwater management (SWM) facilities. 
     
   
As-built Certification Data Tables
  
     
    The zip file above contains the data tables listed below. We recommend that you read the included PDF containing instructions for importing as-built certification data tables into MicroStation. 
   
      
         
            | Stormwater Management As-Built Certification | Revision Date | 
         
            | MDOT SHA Plan Review Division 
 | 6-3-2021 | 
         
            | MDE Code 378 | 6-3-2021 | 
      
   
 
   
      
         
            |  
               Facility | Revision Date | 
         
            | Bioretention (F-6) 
 | 10-22-2021 | 
         
            | Submerged Gravel Wetland - Non-378 (M-2) 
 | 12-6-2021 | 
         
            | Micro-bioretention (M-6) 
 | 10-25-2021 | 
         
            | Rain Garden (M-7) 
 | 10-27-2021 | 
         
            | Bio-swale (M-8 ) 
 | 10-25-2021 | 
         
            | Grass Swale (M-8) 
 | 6-3-2021 | 
         
            | Wet Swale (M-8) 
 | 10-25-2021 | 
         
            | Non-Rooftop Disconnect (N-2) | 10-25-2021 | 
         
            | Wet Swale (O-2) 
 | 10-25-2021 | 
         
            | Dry Extended Detention Pond (P-X) 
 | 10-25-2021 | 
         
            | Wet Pond (P-2) | 10-25-2021 | 
         
            | Check Dam 
 | 6-25-2021 | 
         
            | Forebay | 10-25-2021 | 
         
            | Inlet 
 | 11-10-2022 | 
         
            | Riser 
 | 6-16-2021 | 
         
            | Weir 
 | 6-16-2021 
 | 
      
   
  
   
Stormwater Management Facility Tracking Numbers
   
MDOT SHA assigns a unique tracking number to all SWM facilities that are owned by SHA and/or treat SHA runoff. Final facility data is requested from project development teams no earlier than 65% design for inclusion within the SHA NPDES geospatial database.
   
   
   
   
Notice of Intent (NOI) Application
 
   Managers of MDOT SHA projects with a limit of disturbance (LOD) of one acre and greater must obtain a permit for coverage under the General Permit for Stormwater Discharge Associated with Construction Activity, otherwise known as Maryland General Permit No. 20-CP. As part of that process, documents must be submitted to the Highway Hydraulics Division liaison for the project. The application and related files are contained in the zip file linked below.
 For additional information, please contact the assigned Highway Hydraulics Division liaison for your project or 
      [email protected].