All Work is Weather Dependent

MDOT SHA is suspending non-emergency interstate lane closures until 9 p.m. Monday, November 26

Major Weekend Lane Closures

Anne Arundel County
 
• Northbound I-895 Bridge over the Patapsco Flats (Between MD 295 and the I-97/MD spur) – Bridge rehabilitation – (MDTA project) 24/7 right lane closure until summer 2019.
Caroline/Talbot County line

• MD 331 (Dover Road) Bridge over the Choptank River – Final surface paving – Single lane closures guided by flaggers beginning Sunday. November 25 each night until Friday, November 30. Crews will work between 7 p.m. and 6 p.m. new
 
Cecil County

• MD 273 (Telegraph Road) at Blue Ball Road – Roundabout paving – Single lane closures guided by flaggers Saturday between 8 a.m. and 5 p.m. new
 
Montgomery County

• Northbound I-270 between Democracy Boulevard and Montrose Road - Resurfacing - Single and double lane closures Sunday nights through Friday mornings 8 p.m. and 5 a.m.

• US 29 (Colesville Road) between I-495 (Capital Beltway) and MD 97 (Georgia Avenue) - WSSC water line replacement project - Single and double lane closures Mondays through Fridays between 9:30 a.m. to 3:30 p.m. and Sundays through Friday mornings between 9 p.m. and 5 a.m. Single lane closures Saturday between 9 a.m. and 5 p.m.

Long-Term Closures

Baltimore City

HIGH-IMPACT - (MDTA Project) - I-895 (Baltimore Harbor Tunnel Throughway) between the tunnels and Boston Street/O’Donnell Street (exit 11) and the Holabird Avenue exit. – Bridge rehabilitation project – Northbound I-895 to close on November 27 and two-way traffic using southbound I-895. Use I-95 (Fort McHenry Tunnel) or I-695 (Francis Scott Key Bridge) as alternate routes. Project to last until 2021. new

Baltimore County

HIGH-IMPACT - Outer loop of I-695 (Baltimore Beltway) ramp to Edmonson Avenue – Ramp closure for widening project – Motorists will be guided to I-695/MD 144 (Frederick Road) interchange and back to the inner loop I-695 to Edmonson Avenue. In approximately three weeks, the Edmonson Avenue ramp to the outer loop I-695 will also close. Local detours. new

• Eastbound Padonia Road ramp to northbound I-83 – Ramp closure for bridge replacement project – Motorists will be guided to Deerco Road to the I-83/Timonium Road interchange.

Frederick County

• Eastbound US 40 Alternate (Old National Pike) between Fern Lane and Ridge Road – Roadside slope repair – Right truck “climbing” lane and shoulder closed until mid-November.

Prince George’s County

• US 301 (Crain Highway) between Frank Tippett Road and Trumps Hill Road - Gas pipeline construction and installation (Washington Gas project) – Single right lane closure through spring 2019.
 
Somerset/Worcester County line

• US 13 (Ocean Highway) northbound over Pocomoke River at the Worcester/Somerset county line – Bridge work – Northbound US 13 bridge over Pocomoke River has been reduced to one 12-foot lane for bridge work through the late-fall.

Wicomico County

• MD 349 (Nanticoke Road) Rockawalkin Road – Washout/major road repair – MD 349 is closed and detoured until early 2019.
 
MAJOR Closures for Next Week

Allegany County

• MD 807 (Bedford Road) near Patmar Drive (north of Cumberland) – Drainage improvement project – Single lane closures guided by an Automated Flagger Assistance Device beginning Tuesday, November 27 until Thursday, November 29. new

Anne Arundel County

• Westbound MD 175 (Annapolis Road) between Disney Road and Reece Road – Traffic switch and new traffic pattern – Single lane closures Tuesday, November 27 between 9 a.m. and 3 p.m. new

Baltimore County
 
• I-95 south of I-195 – Traffic volume counter deployment – Brief total stoppages to deploy traffic counters beginning 11:15 p.m. November 27 until 2 a.m. November 28. Crews will recover the devices during the same period on Thursday, November 29 into Friday, November 30. new

• I-83 (Baltimore-Harrisburg Expressway) at Padonia Road – Lane shifts for bridge replacement project – On Wednesday, November 14, traffic will be shifted on northbound I-83 and will include single and double closures. All lanes will open by 5 a.m. Thursday. Southbound traffic will be shifted between 9 p.m. and 5 a.m. Thursday night into Friday morning.

Carroll County

• MD 86 (Lineboro Road) between MD 30 (Hanover Pike) and the Pennsylvania line – Pavement repair – Single lane closures guided by flaggers Monday through Friday between 8 a.m. and 4 p.m. Complete early-December.

Frederick County

• MD 355 (Urbana Pike) Bridge over the Monocacy River – Bridge approach paving – Single lane closures guided by flaggers beginning Wednesday, November 14 between 8 a.m. and 4 p.m.

• Park Mills Road Bridge over I-270 – Bridge approach paving – Single lane closures guided by flaggers beginning Wednesday, November 14 between 8 a.m. and 4 p.m.

• US 15 (Catoctin Mountain Highway) at Mountville Road – Pavement repair – Single lane closures Monday, November 12 between 8 a.m. and 3 p.m. 

Howard County

• I-95 north of MD 216 (Scaggsville Road) – Traffic volume count deployment – Brief total stoppages to deploy traffic counters beginning 11:15 p.m. November 26 until 2 a.m. November 27. Crews will recover the devices during the same period on Wednesday, November 28 into Thursday, November 29. new

• I-95 south of MD 103 (Meadowridge Road) – Traffic volume count deployment – Brief total stoppages to deploy traffic counters beginning 11:15 p.m. November 26 until 2 a.m. November 27. Crews will recover the devices during the same period on Wednesday, November 28 into Thursday, November 29. new

Kent County

• MD 213 (Church Hill Road) Bridge over the Chester River – Routine drawbridge maintenance – Test openings on Monday, November 26 between 9 a.m. and 3 p.m. new

Montgomery County

• Northbound I-270 at MD 109 (Old Hundred Road) – Paving/line striping – On northbound I-270 - Single lane closures Mondays through Fridays between 9 a.m. and 11 a.m.

• MD 97 (Georgia Avenue) between north of Goldmine Road and south of Holiday Drive - Bypass construction – Single lane closures Mondays through Fridays between 8 a.m. and 3 p.m.

Washington County

• I-81 between the Potomac River Bridge (West Virginia line) and MD 68/MD 63 (Lappans Road) – Highway widening project – Left lane closures Sunday nights through Friday mornings between 9 p.m. and 5 a.m. There may be occasional, brief total closures to move equipment and material into place between 2 a.m. and 4 a.m.

 

###