JavaScript is required to use content on this page. Please enable JavaScript in your browser.
The zip file above contains the guidance drawings listed below.
The zip file above contains the data tables listed below. We recommend that you read the included PDF containing instructions for importing as-built certification data tables into MicroStation.
MDOT SHA projects with a limit of disturbance (LOD) of one acre and greater are required to obtain a permit for coverage under the General Permit for Stormwater Discharge Associated with Construction Activity, otherwise known as Maryland General Permit No. 20-CP. As part of that process, documents must be prepared and submitted to the Highway Hydraulics Division liaison for the project. The application and related files are contained in the zip file linked below.
We're available on the following channels.