US 1 (Belair Road) from I-695 to City Line Baltimore County – Baltimore County DPWT water line replacement project - Overnight lane closures along short sections of Belair Road for overnight roadway milling and patching, Monday-Thursday 9 p.m.-5 a.m. the next day through early June.
I-695 TSMO Project - Outer Loop from I-83 NB to MD 140 (Reisterstown Road), ITS Underground Installation and Roadway construction – Daytime Right Shoulder Closures for ITS construction and roadway construction by contractor team along outer loop I-695 from I-83 NB (BHX) to MD 140 9 a.m.-3 p.m., Monday 5/23 through Friday 5/27.
Updated
I-695 TSMO Project - I-695 Inner/Outer loop from US 40 (Baltimore National Pike) to I-95, Test Pits and Pipe Investigation –Daytime Intermittent Right/Left Shoulder Closures for test pits and pipe investigation by contractor team along inner/outer loop I-695 from US 40 to I-95, 9 a.m.-3 p.m., Monday 5/23 through Friday 5/27.
Updated
Raphael Road overpass at I-95 - MDTA Reconstruction – MDTA closed the Raphael Road overpass as part of the I-95 Express Toll Lanes (ETL) Northbound Extension project. The closure will be in place through early 2023 and traffic is being detoured to the Bradshaw Road overpass.
US 40 (Pulaski Highway) from MD 43 (White Marsh Blvd.) to Reames Road - Roadway milling, patching and resurfacing – Weekday single lane closures between 9 a.m. and 3 p.m. Monday-Friday through late May.
US 40 (Pulaski Highway) Westbound from Campbell Boulevard to MD 700 (Martin Boulevard) – Roadway milling and resurfacing - Weekday single lane closures between 9 a.m. and 3 p.m. and overnight between 8 p.m. and 5 a.m. Sunday-Thursday through late June. Updated
MD 7 (Philadelphia Road) from Ebenezer Road to New Forge Road - Roadway milling and patching – Weekday single lane closures with flagging operations, 9 a.m. to 3 p.m., through late June.
MD 30 (Hanover Pike) at Mt. Gilead Road – Intersection Improvements – Daytime lane closures with flagging operations at intersection Monday through Friday, 9 a.m. – 3 p.m. through fall 2022.
MD 45 (York Road) Northbound near Boxwood Lane and southbound York Road near Sherwood Road / BGE Electric Reliability Project Spring 2022 - BGE will shift travel lanes to create two work zones around BGE manholes in roadway. BGE will maintain two-way through traffic through the two work zones, BGE work will be 24/7 through late June 2022.
MD 122 (Security Blvd.) from Rolling Rd. to east of I-695 - Roadway milling, patching and resurfacing – Occasional weeknight single lane closures between 9 p.m. and 5 a.m. the next day, Sunday-Thursday as weather permits through mid-May.
MD 140 Northbound at Olive Lane / BGE Electric Reliability Project Spring 2022 - Through mid-May 2022, BGE will maintain two through lanes and the left turn lane along northbound MD 140. Right turns in and out of properties on Olive Lane will be maintained throughout construction. Left turns in and out of Olive Lane and the businesses directly south of Olive Lane will be restricted. BGE will maintain all through lanes along southbound MD 140 through the work zone.
MD 145 (Sweet Air Road) from east of MD 146 (Jarrettsville Pike) to Manor Rd. - Highway maintenance pavement patching, milling, and resurfacing with temporary lane closures and flagging operations on weekdays 9 a.m.-3 p.m. and Saturdays 6 a.m.-2 p.m. through late June.
MD 151 (North Point Blvd.) from New Battle Grove Road to Cove Road – Highway maintenance pavement patching, milling, and resurfacing with temporary lane closures on weekdays between 9 a.m. and 3 p.m. through late June.
US 1 (Belair Road) from Chapel Road to Honeygo Boulevard – Highway maintenance pavement patching with temporary lane closures on weekdays between 9 a.m. and 3 p.m. through mid-May.
US 1 (Belair Road) from Open Bible Way to north of the Little Gunpowder Falls (Baltimore/Harford County line) - Highway resurfacing project with temporary lane closures on weekdays between 9 a.m. and 3 p.m. through mid-May.
Ingleside Avenue underneath I-695 – ADA Sidewalk Upgrades – Temporary single-lane closures and flagging operations on Ingleside Avenue in the vicinity of the I-695 bridge on weekdays 9 a.m. to 3 p.m. until early summer.
US 1 Hickory Bypass from US 1 Business to the northern “T” intersection with US 1 (Conowingo Road). - Highway pavement repair and resurfacing project – Weekday single lane closures between 9 a.m. and 3 p.m. Monday-Friday through late spring 2022.
US 1 Business from the signalized intersection with US 1 Hickory Bypass and the northern “T” intersection with US 1 (Conowingo Road) – Highway maintenance pavement patching – Weekdays single lane closures 9 a.m. and 3 p.m. through late spring 2022.
US 1 Business from MD 147 (Harford Rd.) to Tollgate Rd. - Highway pavement repair and resurfacing project – Overnight single lane closures between 8 p.m. and 5 a.m. the next day Sunday-Thursday through early June.
MD 23 (East-West Highway) from Commerce Road to US 1 Hickory Bypass – Highway maintenance pavement patching – Weekday single lane closures and flagging operations between 9 a.m. and 4 p.m. through late spring 2022.
MD 23 from MD 439 (Old York Road) to the Old York Road just south of MD 138 (Troyer Road) and north of the Jarrettsville Volunteer Fire Company – Highway maintenance pavement patching with temporary lane closures and flagging operations on weekdays between 9 a.m. and 3 p.m. through late June.
MD 136 (Whiteford Rd.) from Robinson Mill Road to Heaps Road – Highway Maintenance pavement milling patching and resurfacing – Overnight lane closures and flagging operations between 8 p.m. and 5 a.m., Sunday-Thursday through late June.
US 50 West between Athol Rd and MD 313 (Delmar Rd) - Utility work. Double lane and shoulder closures weekdays 7 a.m.-5 p.m. through May 26.
New
US 50 East and West between Naylor Mill Rd and US 50BU (E. Salisbury Pkwy) - Guardrail repair. Double lane and shoulder closures weekdays 7 a.m.-6 p.m. through June 30.
New
US 50 East and West at Friendship Rd – Utility Work. Double lane and shoulder closures weekdays 8 a.m.-3 p.m. through June 10.
US 50 East and West at Wicomico-Worcester Line – Bridge inspection. Double lane and shoulder closures weekdays 9 a.m.-2 p.m. through June 30.
US 50 West between Walston Switch and Hobbs Rd. - Guardrail repair. Double lane and shoulder closures weekdays 9 a.m.-3 p.m. through May 26.
US 50 East between Bent Pine Rd and MD 346 (Old Ocean City Blvd) Worcester County – Nighttime line striping. Double lane and shoulder closures Sunday-Friday 8 p.m.-7 a.m. through May 27.
US 50 East and West between Cypress St and N. Division St – Night time bridge maintenance. Three lane and shoulder closures weeknights 8 p.m.-6 a.m. through May 31.
US 13 South between Columbia Rd and Arlington Rd – Utility Work. Double lane and shoulder closures weekdays 8 a.m.-4 p.m. through May 25.
US 13 North and South between E. Carroll St and E. Church St – Structure repair. Double lane and shoulder closures weekdays 7 a.m.-4 p.m. through May 31.
US 13 North and South between Cedar Ln and Pine Bluff Rd – Structure repair. Double lane and shoulder closures weekdays 7 a.m. - 4 p.m. through May 31.
MD 528 South between 28th and 26th St – Utility Work. Three lanes and shoulder closures Monday-Thursday 7 a.m.-5 p.m. through June 2.
New
US 113 North and South between MD 365 (Public Landing Rd) and Brick Kiln Rd. -Utility Work. Utility Work. Double lane and shoulder closures weekdays 9 a.m.-3 p.m. through June 17.
Updated
MD 528 North and South between 90th and 87th Street – Utility Work. Three lanes and shoulders closed weekdays 7 a.m.-5 p.m. through June 3.
US 113 North at MD 376 (Bay St) - Construction. Double lane and shoulder closures weekdays 6 a.m.-6 p.m. through June 10. Updated
US 113 North at MD 367 (Bishopville Rd.) - Guardrail repair. Double lane and shoulder closures weekdays 9 a.m.-3 p.m. through May 26.
US 113 North and South at MD 575G (Kepler Ln) - Guardrail repair. Double lane and shoulder closures weekdays 9 a.m.-3 p.m. through May 26.
MD 528 North and South between 60th and 146th St. - Nighttime marking operations. Three lane and shoulder closures Sunday-Thursday 7 p.m.-6 a.m. through May 27.
MD 528 North and South between 40th and 62nd St – Landscape Management. Three lane and shoulder closures weekdays 7 a.m.-4 p.m. through May 26.
MD 528 North and South between 17th and 130th Street – Traffic Signal Work. Three lane and shoulder closure weekdays 7 a.m.-4 p.m. through June 6.
US 50 East and West between MD 528 (Philadelphia Ave) and Golf Course Rd – Nighttime bridge repair. Double lane and shoulder closures Sunday through Thursday 9 p.m.-6 a.m. through May 26.
US 113 North between MD 376 (Bay St) and Branch St. - Utility Work. Double lane and shoulder closures weekdays 7 a.m.-6 p.m. through May 26. Updated
US 113 North between Old Snow Hill Rd & Lambertson Rd. - Tree trimming. Double lane and shoulder closure weekdays 7 a.m.-4 p.m. through May 26.
MD 51 (Industrial Blvd) from Canal Parkway to Springdale Street – Left lane closures will be in place south bound. Crews will work daily, 7 a.m. to 7 p.m., on the section of the roadway between Canal Parkway and Springdale Street. Weather permitting, the project is expected to be completed by the end of June.
MD 51 (Oldtown Road) Bridge over the C&O Canal – Crews will be closing both lanes and creating a single lane in the center of the roadway. This traffic set up will include a temporary traffic signal alternating traffic through the single lane. Weather permitting, the project is expected to be completed by the end of summer.
MD 36 – Barton from Potomac Street to New Georges Creek Road at MD 935 - Flagging operation for a safety and resurfacing project – Patch, grind, and resurface and apply new pavement markings - Crews will work daily, 7 a.m. to 7 p.m.
I-68 (National Freeway) Bridge over MD 55 (Vale Summit Road) - Barrier repairs and fencing installation - Weekdays from 7 a.m. to 7 p.m. Right lane and shoulder closures both westbound and eastbound - Weather permitting, the project is expected to complete by the end of June.
Cove Road bridge over I-695 - Bridge deck replacement - On I-695, daytime single lane closures in both directions may occur Monday-Friday between 9 a.m. and 3 p.m. and overnight lane closures Sunday-Thursday between 7 p.m. and 5 a.m. the next day. On the Cove Road bridge over I-695, long-term single lane closures are in effect, with two-way traffic on the southern (eastbound) side of the bridge deck, through late summer 2022.
I-83 (Baltimore-Harrisburg Expressway) North and South Bridges over Padonia Road – Dual Bridge replacement and interchange improvements through summer 2022. There may be single lane closures on I-83 north and I-83 south between 9 a.m. and 4 p.m. Monday-Friday and between 7 p.m. and 5 a.m. the next day Sunday-Thursday. Single lane closures on Padonia Rd. West between 9 a.m. and 3 p.m. Monday-Saturday, and between 8 p.m. and 5 a.m. the next day Sunday-Thursday. Detours of Padonia Rd. underneath I-83 possible on any weeknight (Sunday-Thursday) between 8 p.m. and 5 a.m. the next morning. Interchange Ramp from Padonia Road East to I-83 North closed 24 hours/7 days until early summer 2022.
US 40 Dual Bridges over Little Gunpowder Falls and (Big) Gunpowder Falls – Four bridges to be replaced between White Marsh and Joppatowne – Motorists should expect temporary single lane closures on eastbound and westbound US 40 during the following off-peak times: Daytime (Monday – Saturday) Westbound US 40: 8 a.m. to 4 p.m. Eastbound US 40: 7 a.m. to 4 p.m. Overnight (Sunday-Thursday) Westbound and Eastbound US 40: 7 p.m. to 5 a.m. the next day.
US 1 (Washington Blvd.) Bridge over CSX Transportation rail lines – Bridge replacement – Clarke Blvd. at US 1 is closed/detoured 24 hours/7 days through late summer 2022. Posted detour route includes Selford Rd., Francis Ave., Oregon and Carville Aves., Tom Day Blvd. and US 1 Alt. (Southwestern Blvd.) Project scheduled through late fall 2022.
MD 25 (Falls Road) between Baltimore City / County Line and I-695 – Baltimore County DPWT water line replacement project - Overnight lane closures with flagging operations along sections of Falls Road, 9 p.m.-5 a.m. the next day Sunday-Thursday, with some daytime work as needed 9 a.m.-3 p.m. through spring 2024.
MD 26 (Liberty Road) Eastbound between Jean Dr. and Meadowdale Dr. - ADA Sidewalk Reconstruction/Upgrades - Temporary overnight single lane closures on MD 26 between 9 p.m. and 5 a.m. the next day Sunday-Thursday and between 9 a.m. and 12:30 p.m. Monday-Friday through mid-summer 2022. New
MD 26 (Liberty Road) between Brenbrook Drive and N. Rolling Road - ADA Sidewalk Reconstruction/Upgrades - Temporary overnight single lane closures on MD 26 between 9 p.m. and 5 a.m. the next day Sunday-Thursday and between 9 a.m. and 11 a.m. Monday-Thursday through spring 2022.
MD 26 (Liberty Road) between Deer Park Rd. and Pikeswood Rd. - Americans with Disabilities Act (ADA) Sidewalk Reconstruction/Upgrades - Temporary daytime single lane closures on MD 26 between 9 a.m. and 3 p.m. Monday-Friday through late spring 2022.
MD 30 (Hanover Pike) at Mt. Gilead Road – Intersection Improvements – Daytime lane closures with flagging operations at intersection Monday through Friday, 9 a.m.-3 p.m. through fall 2022.
MD 43 (White Marsh Blvd.) at Honeygo Blvd. - Intersection Widening and Improvements - Temporary daytime lane closures on MD 43 and Honeygo Blvd. legs of the intersection between 9 a.m. and 3 p.m. Monday-Friday, and overnight lane closures at any time between 8 p.m. and 5 a.m. the next day Sunday-Thursday. When necessary, there will be temporary lane closures on weekends, 7 a.m.-1 p.m. Saturday and/or Sunday. Project scheduled through early summer 2022.
MD 140 (Reisterstown Road) between I-695 and Mt. Wilson Lane/ Grey Rock Rd. - Americans with Disabilities Act (ADA) improvements - includes traffic signal upgrades, crosswalk markings, and paving on MD 140 and also on Hooks Lane at MD 140. Temporary daytime single lane closures on MD 140 between 9 a.m. and 3 p.m. Monday-Friday and overnight single lane closures on Hooks Lane approach to MD 140 between 9 p.m. and 5 a.m. the next morning Sunday-Thursday through summer 2022.
MD 140 (Reisterstown Rd.) between Painters Mill Rd. and E. Pleasant Hill Rd. – Resurfacing/County Water Main replacement - Crews are installing new 36-inch water main from Owings Mills Blvd. to East Pleasant Hill Road with connections to fire hydrants and buildings along MD 140. Daytime single lane closures between 9 a.m. and 3 p.m. between Owings Mills Blvd. and E. Pleasant Hill Rd. Nighttime single lane closures within project limits Sunday-Thursday nights between 9 p.m. and 5 a.m. the next day. Access to all driveways in this section will be maintained during any lane closures. Project scheduled through spring 2022.
MD 140 (Reisterstown Rd.) between E. Pleasant Hill Rd. and Stocksdale Ave. – Resurfacing/County Water Main replacement - Daytime single lane closures Monday-Friday 9 a.m.-3 p.m. between E. Pleasant Hill Rd and Stocksdale Ave. Nighttime single lane closures within project limits Sunday-Thursday nights between 8 p.m. and 6 a.m. the next day. Access to driveways in this section will be maintained during any lane closures. Project scheduled through summer 2024.
MD 147 (Harford Road) / Joppa Road - Intersection improvements - Daytime single lane closures and flagging operations on Harford and Joppa Road in the vicinity of the intersection Monday-Thursday 9 a.m.-4 p.m. Monday-Thursday and 9 a.m.-3 p.m. Fridays. Overnight work with lane closures Sunday-Thursday 9 p.m.-5 a.m. the next day. Traffic shift in effect as of Jan. 26 on westbound Joppa Rd. with lanes shifted to the left approaching Harford Rd. Traffic shift and right lane closure in effect along southbound MD 147 from Jomat Avenue to south of Joppa Road, through summer 2022.
MD 151 (Sparrows Point Blvd.) / Wharf Road (MD 151 B) Interchange - Three-bridge replacement project at interchange. The southbound side of the existing MD 151 bridge is closed and two-way traffic - one lane in each direction - runs on the northbound side of the bridge. This will be in effect through 2022 and will enable partial demolition of the existing bridge over Wharf Road and future construction of the new bridge. This is in addition to the detours of southbound and northbound Wharf Road at the interchange for replacement of two other bridges.
Brookeville Road from MD 97 (Georgia Avenue) to Grayheaven Manor Road. Sewer relocation project. Full 24/7 road closure with detour through late spring 2022. Drivers should add extra commute time and use MD 97 and MD 108 as alternate routes.
MD 185 (Connecticut Avenue) at Jones Bridge Road/Kensington Parkway Intersection improvement project. Single off-peak lane closures on MD 185, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. and single off-peak lane closures on Jones Bridge Road, weekdays, 9 a.m. to 3 p.m. and overnight, 7 days per week, 9 p.m. to 5 a.m. through late summer 2023.
MD 185 (Connecticut Avenue) at Saul Road Intersection improvement project. Single lane closures with intermittent intersection closures, weekdays, 9 a.m. to 3 p.m. through year-end 2022.
MD 97 (Georgia Avenue) from north of Gold Mine Road to south of Holiday Drive. - Roadway relocation project - Intermittent single northbound and southbound lane closures weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 6 a.m. through year-end 2022.
MD 410 (East West Highway) from Rocton Avenue to Curtis Street – Curb realignment and sidewalk construction. Single lane closure, weekdays, 9 a.m. to 3 p.m. through late spring 2022.
I-270 from I-70 to I-495 (Capital Beltway) - Traffic congestion relief construction project - Intermittent single lane closures, weekdays, 10 a.m. to 3 p.m. and single, double and triple overnight lane closures, Sunday through Thursday, 7 p.m. to 5 a.m. and intermittent temporary ramp closures with detours up to 24 hours a day through year-end 2022.
I-270 Southbound from MD 121 (Clarksburg Road) to MD 109 (Old Hundred Road) - I-270 acceleration lane expansion project. Single and multiple off-peak lane closures, weekdays 9:30 a.m.to 3:30 p.m. and overnight, Sunday through Thursday, 7 p.m. to 4 a.m. through year-end 2022.
Cherry Hill Road over I-95 northbound ramp at the I-495 Outer Loop(Capital Beltway). Bridge painting and cleaning project. Single and multiple off-peak lane closures; 8 p.m. to 5 .am. through late fall 2022.
US 1 (Baltimore Avenue), College Ave. to MD 193 (University Boulevard) - US 1 Reconstruction Project - Corridor Improvement- Northbound and southbound single lane closures throughout the length of the project Saturday through Sunday, 10 a.m. to 4 p.m. and 9 p.m. tm. through late summer 2023.
MD 5 (Branch Avenue) from the DC Line to the intersection of Curtis Drive - Safety and resurfacing project. Intermittent/temporary single and multiple MD 5 northbound off-peak lane closures, weekdays, 9 a.m. to 3 p.m., overnight, Sunday through Thursday 7 p.m. to 5 a.m. and weekends, 5 a.m. to 10 p.m. and weekends 5 a.m. to 10 p.m. Intermittent/temporary single and multiple MD 5 southbound off-peak lane closures weekdays, 6 a.m. to 12 noon overnight, Sunday through Thursday, 7 p.m. to 6 a.m. and intermittent/temporary single and multiple MD 637 single lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 7 p.m. to 6 a.m. through late summer 2022.
MD 5 (Branch Avenue) from Suitland Parkway to Curtis Drive. Median construction. Single northbound lane closure 24 hours a day through late summer 2022.
MD 210 at Livingston Road/Kerby Hill Road. Interchange construction project. Intermittent off-peak single and multiple lane closures, Monday through Saturday, 9 a.m.to 3 p.m. and overnight, Sunday through Thursday, 8 p.m.to 5 a.m. through late summer 2022.
MD 212A (Powder Mill Road) from Pine Street to US 1 (Baltimore Avenue) - Roadway reconstruction project. Intermittent single and multiple lane closures weekdays, 8 a.m. to 4 p.m. through late summer 2022.
MD 223 (Woodyard Road) from Sherwood Drive to Victoria Drive - Sidewalk construction project - Off-peak lane closures, weekdays, 8:30 a.m. to 3:30 p.m. and Saturdays, 8 a.m. to 5 p.m. through late fall 2022.
MD 223 (Woodyard Road) at Dower House Road - Geometric improvement project - Single weekday lane closures, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through late summer 2022.
MD 500 (Queens Chapel Road) from Eastern Avenue to MD 208 (Hamilton Street) Community safety and enhancement project. Intermittent single and multiple lane closures weekdays,9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 7 p.m. to 6 a.m. through late summer 2022.
I-95/I-495 (Capital Beltway) from Suitland Road to MD 4 (Pennsylvania Avenue) - Suitland Parkway bridge replacement project. Road shoulder closure permissible 24 hours daily, intermittent single and multiple lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Friday, 8 p.m. to 6 a.m. through year end 2022.
MD 33 (Talbot St.) from Spencer Ave. to Lee St. in St. Michaels - Sidewalk project. Occasional single-lane closures and flagging 9 a.m. to 3 p.m. Monday-Thursday through Spring 2023. New