Raphael Road overpass at I-95 – MDTA Reconstruction – MDTA closed the Raphael Road overpass as part of the I-95 Express Toll Lanes (ETL) Northbound Extension project. The closure will be in place through early 2023 and traffic is being detoured to the Bradshaw Road overpass.
I-695 Outer Loop from I-83 North (BHX) to Greenspring Avenue – ITS Underground Installation – Daytime right shoulder closures 9 a.m.-3 p.m. weekdays for ITS construction by contractor team along Outer Loop Monday, April 11 through Friday, April 15.
I-695 Inner/Outer Loops from I-83 North (BHX) to I-95 – Test Pit Operations – Daytime right and left shoulder closures 9 a.m.-3 p.m. weekdays for test pits by contractor team along Inner and Outer Loop Monday, April 11 through Friday, April 15.
I-695 Inner/Outer Loops from US 40 (Balto. National Pike) to MD 45 (York Road) – Sign Layout – Daytime right/left shoulder closures 9 a.m.-3 p.m. weekdays for sign layout by contractor team along inner/outer loop I-695 from US 40 to MD 45 Monday, April 11 through Friday, April 15.
I-695 Outer Loop from I-83 (BHX) to Greenspring Ave.) – Work Zone Barrier Wall Installation –Overnight right shoulder and lane closures for installation of concrete work zone barriers along outer loop 8 p.m.-5 a.m. the next day Tuesday, April 12 through Thursday, April 14. New
US 40 (Pulaski Hwy.) from MD 43 (White Marsh Blvd.) to Reames Rd. - Roadway milling, patching and resurfacing – Weekday single lane closures between 9 a.m. and 3 p.m. Monday – Friday through early May.
MD 7 (Philadelphia Rd.) from Ebenezer Rd. to New Forge Rd. - Roadway milling and patching – Weekday single lane closures with flagging operations, 9 a.m. to 3 p.m., Monday-Friday through late June. New
MD 122 (Security Blvd.) from Rolling Rd. to east of I-695 - Roadway milling, patching and resurfacing – Occasional weeknight single lane closures between 9 p.m. and 5 a.m. the next day, Sunday-Thursday as weather permits through late April.
MD 140 Northbound at Olive Lane / BGE Electric Reliability Project Spring 2022 - Through mid-May 2022, BGE will maintain two through lanes and the left turn lane along northbound MD 140. Right turns in and out of properties on Olive Lane will be maintained throughout construction. Left turns in and out of Olive Lane and the businesses directly south of Olive Lane will be restricted. BGE will maintain all through lanes along southbound MD 140 through the work zone.
MD 151 (North Point Blvd.) from New Battle Grove Road to Cove Road – Highway maintenance pavement patching, milling, and resurfacing with temporary lane closures on weekdays between 9 a.m. and 3 p.m. through late June.
US 1 (Belair Road) from Chapel Road to Honeygo Boulevard – Highway maintenance pavement patching with temporary lane closures on weekdays between 9 a.m. and 3 p.m. through late April.
US 1 (Belair Road) from Open Bible Way to north of the Little Gunpowder Falls (Baltimore/Harford County line) - Highway resurfacing project with temporary lane closures on weekdays between 9 a.m. and 3 p.m. through late April.
US 1 Hickory Bypass from US 1 Business to the northern “T” intersection with US 1 (Conowingo Road). - Highway pavement repair and resurfacing project – Weekday single lane closures between 9 a.m. and 3 p.m. Monday-Friday through late spring 2022.
US 1 Business from the signalized intersection with US 1 Hickory Bypass and the northern “T” intersection with US 1 (Conowingo Road) – Highway maintenance pavement patching – Weekdays single lane closures 9 a.m. and 3 p.m. through late spring 2022.
MD 23 (East-West Highway) from Commerce Road to US 1 Hickory Bypass – Highway maintenance pavement patching – Weekday single lane closures and flagging operations between 9 a.m. and 4 p.m. through late spring 2022.
MD 7 from MD 152 to Fashion Way - Highway Maintenance pavement patching work - Weekday single lane closures with flagging operations, as weather permits, between 9 a.m. and 3 p.m. Monday-Friday through late April 2022.
MD 136 from Telegraph Road to MD 165 - Highway Maintenance pavement patching work - Weekday single lane closures with flagging operations, as weather permits, between 8 a.m. and 4 p.m. Monday-Friday through late April 2022.
MD 146 (Jarrettsville Road) from Pocock Road to MD 23 (Norrisville Road) - Highway maintenance pavement patching with temporary lane closures and flagging operations on weekdays between 9 a.m. and 3 p.m. through late June.
MD 165 from MD 24 (Rocks Road) to North Harford High School driveway - Highway maintenance pavement patching – Overnight single lane closures and flagging operations on this section of MD 165 overnight, Sunday-Thursday between 9 p.m. and 5 a.m. the next day as weather permits through late April 2022.
MD 646 (Prospect Road) from MD 543 (Ady Road) to MD 136 (Whiteford Road) – Highway maintenance pavement patching – Temporary daytime lane closures with flagging operations Monday through Friday between 9 a.m. and 3 p.m. through late June.
MD 528 North and South between 18th and 62nd Street – pavement marking. Three lanes and shoulder closures weekdays 7:00 a.m.-6:00 p.m. through April 15. New
MD 528 North and South from 100th to 146th Street - Utility work. Three lanes and shoulder closures weekdays 7:00 a.m.-7:00 p.m. through April 18 New
MD 528 North and South from MD 90 (Ocean City Expressway) to 100th Street - Utility work. Three lanes and shoulder closures weekdays 7:00 a.m.-7:00 p.m. through April 18. New
MD 528 North and South from 1st to 33rd Street - Utility work. Three lanes and shoulder closures weekdays 7:00a.m. - 7:00p.m. through April 18. New
MD 378 North from 1st to 2nd Street – Utility Work. Three lane closures weekdays 7:00 a.m.-4:00 p.m. through April 29. New
MD 528 North and South between 70th and 74th Street – Utility work. Lane and shoulder closures weekdays 7:00 a.m.-5:00 p.m. through April 29.
US 113 North and South between Betheden Church Rd and Woodside Ln – Utility Work. Double lane and shoulder closures weekdays 7:00 a.m.-5:00 p.m. through April 29.
MD 528 North and South between 127th and 119th Street – Milling, patching, paving and marking operations. Four lanes and shoulder closures weekdays 7:00 a.m.-5:00 p.m. through April.
Cove Road bridge over I-695 - Bridge deck replacement - On I-695, daytime single lane closures in both directions may occur Monday-Friday between 9 a.m. and 3 p.m. and overnight lane closures Sunday-Thursday between 7 p.m. and 5 a.m. the next day. On the Cove Road bridge over I-695, long-term single lane closures are in effect, with two-way traffic on the southern (eastbound) side of the bridge deck, through late summer 2022.
I-83 (Baltimore-Harrisburg Expressway) North and South Bridges over Padonia Road – Dual Bridge replacement and interchange improvements through summer 2022. There may be single lane closures on I-83 north and I-83 south between 9 a.m. and 4 p.m. Monday-Friday and between 7 p.m. and 5 a.m. the next day Sunday-Thursday. Single lane closures on Padonia Rd. West between 9 a.m. and 3 p.m. Monday-Saturday, and between 8 p.m. and 5 a.m. the next day Sunday-Thursday. Detours of Padonia Rd. underneath I-83 possible on any weeknight (Sunday-Thursday) between 8 p.m. and 5 a.m. the next morning. Interchange Ramp from Padonia Road East to I-83 North closed 24 hours/7 days until entire project is complete summer 2022.
US 40 Dual Bridges over Little Gunpowder Falls and (Big) Gunpowder Falls – Four bridges to be replaced between White Marsh and Joppatowne – Motorists should expect temporary single lane closures on eastbound and westbound US 40 during the following off-peak times: Daytime (Monday-Saturday) Westbound US 40: 8 a.m. to 4 p.m. Eastbound US 40: 7 a.m. to 4 p.m. Overnight (Sunday-Thursday) Westbound and Eastbound US 40: 7 p.m. to 5 a.m. the next day.
US 1 (Washington Blvd.) Bridge over CSX Transportation rail lines – Bridge replacement – Clarke Blvd. at US 1 is closed/detoured 24 hours/7 days through summer 2022. Posted detour route includes Selford Rd., Francis Ave., Oregon and Carville Aves., Tom Day Blvd. and US 1 Alt. (Southwestern Blvd.). Project scheduled through late fall 2022.
MD 25 (Falls Road) between Baltimore City / County Line and I-695 – Baltimore County DPW water line replacement project - Overnight lane closures with flagging operations along sections of Falls Road, 9 p.m. - 5 a.m. the next day Sunday-Thursday, with some daytime work as needed 9 a.m.-3 p.m. through spring 2024.
MD 26 (Liberty Road) between Brenbrook Drive and N. Rolling Road - ADA Sidewalk Reconstruction/Upgrades - Temporary single lane closures on MD 26 between 9 p.m. and 5 a.m. the next day Sunday-Thursday and between 9 a.m. and 11 a.m. Monday-Thursday through spring 2022.
MD 26 (Liberty Road) between Deer Park Rd. and Pikeswood Rd. - Americans with Disabilities Act (ADA) Sidewalk Reconstruction/Upgrades - Temporary single lane closures on MD 26 between 9 a.m. and 3 p.m. Monday-Friday through late spring 2022.
MD 43 (White Marsh Blvd.) at Honeygo Blvd. - Intersection Widening and Improvements - Temporary daytime lane closures on MD 43 and Honeygo Blvd. legs of the intersection between 9 a.m. and 3 p.m. Monday-Friday, and overnight lane closures at any time between 8 p.m. and 5 a.m. the next day Sunday-Thursday. When necessary, there will be temporary lane closures on weekends, 7 a.m.-1 p.m. Saturday and/or Sunday. Project scheduled through late spring 2022.
MD 140 (Reisterstown Road) between I-695 and Mt. Wilson Lane/ Grey Rock Rd. - Americans with Disabilities Act (ADA) improvements - includes traffic signal upgrades, crosswalk markings, and paving on MD 140 and also on Hooks Lane at MD 140. Temporary daytime single lane closures on MD 140 between 9 a.m. and 3 p.m. Monday-Friday and overnight single lane closures on Hooks Lane approach to MD 140 between 9 p.m. and 5 a.m. the next morning Sunday-Thursday through summer 2022. New
MD 140 (Reisterstown Rd.) between Painters Mill Rd. and E. Pleasant Hill Rd. – Resurfacing/County water main replacement - Crews are installing new 36-inch water main from Owings Mills Blvd. to East Pleasant Hill Road with connections to fire hydrants and buildings along MD 140. Daytime single lane closures between 9 a.m. and 3 p.m. between Owings Mills Blvd. and E. Pleasant Hill Rd. Nighttime single lane closures within project limits Sunday-Thursday nights between 9 p.m. and 5 a.m. the next day. Access to all driveways in this section will be maintained during any lane closures. Project scheduled through spring 2022. Updated
MD 140 (Reisterstown Rd.) between E. Pleasant Hill Rd. and Stocksdale Ave. – Resurfacing/County Water Main replacement - Daytime single lane closures Monday-Friday 9 a.m.-3 p.m. between E. Pleasant Hill Rd and Stocksdale Ave. Nighttime single lane closures within project limits Sunday-Thursday nights between 8 p.m. and 6 a.m. the next day. Access to driveways in this section will be maintained during any lane closures. Project scheduled through summer 2024. Updated
MD 147 (Harford Road) / Joppa Road - Intersection Improvements - Daytime single lane closures and flagging operations on Harford and Joppa Road in the vicinity of the intersection Monday-Thursday 9 a.m.-4 p.m. Monday-Thursday and 9 a.m.-3 p.m. Fridays. Overnight work with lane closures Sunday-Thursday 9 p.m.-5 a.m. the next day. Traffic shift in effect as of Jan. 26 on westbound Joppa Rd. with lanes shifted to the left approaching Harford Rd. Traffic shift and right lane closure in effect along southbound MD 147 from Jomat Avenue to south of Joppa Road, through spring 2022.
MD 151 (Sparrows Point Blvd.) / Wharf Road (MD 151 B) Interchange - Three-bridge replacement project at interchange. The southbound side of the existing MD 151 bridge is closed and two-way traffic - one lane in each direction - runs on the northbound side of the bridge. This will be in effect for the next year and will enable partial demolition of the existing bridge over Wharf Road and future construction of the new bridge. This is in addition to the detours of southbound and northbound Wharf Road at the interchange.
Notes: The northbound side of MD 151 is closed between the Baltimore County Highways Maintenance Shop (1500 block) and the Wharf Rd. Interchange. Two-way traffic runs on the southbound side of MD 151, one lane in each direction. The existing ramp from northbound MD 151 to southbound Wharf Road is open for local traffic only.
MD 185 (Connecticut Avenue) at Jones Bridge Road/Kensington Parkway Intersection improvement project. Single off-peak lane closures on MD 185, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. and single off-peak lane closures on Jones Bridge Road, weekdays, 9 a.m. to 3 p.m. and overnight, 7 days per week, 9 p.m. to 5 a.m. through late summer 2023.
MD 97 (Georgia Avenue) from north of Gold Mine Road to south of Holiday Drive. - Roadway relocation project - Intermittent single northbound and southbound lane closures weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 6 a.m. through year-end 2022.
MD 410 (East West Highway) from Rocton Avenue to Curtis Street – Curb realignment and sidewalk construction. Single lane closure, weekdays, 9 a.m. to 3 p.m. through late spring 2022.
I-270 from I-70 to I-495 (Capital Beltway) - Traffic congestion relief construction project - Intermittent single lane closures, weekdays, 10 a.m. to 3 p.m. and single, double and triple overnight lane closures, Sunday through Thursday, 7 p.m. to 5 a.m. and intermittent temporary ramp closures with detours up to 24 hours a day through year-end 2022.
I-270 Southbound from MD 121 (Clarksburg Road) to MD 109 (Old Hundred Road) - I-270 acceleration lane expansion project. Single and multiple off-peak lane closures, weekdays 9:30 a.m.to 3;30 p.m. and overnight, Sunday through Thursday, 7 p.m. to 4 a.m. through year-end 2022.
US 1 (Baltimore Avenue), College Ave. to MD 193 (University Boulevard) - US 1 Reconstruction Project - Corridor Improvement- Northbound and southbound single lane closures throughout the length of the project Saturday through Sunday, 10 a.m. to 4 p.m. and 9 p.m. tm. through late summer 2023.
MD 5 (Branch Avenue) from the DC Line to the intersection of Curtis Drive - Safety and resurfacing project. Intermittent/temporary single and multiple MD 5 northbound off-peak lane closures, weekdays, 9 a.m. to 3 p.m., overnight, Sunday through Thursday 7 p.m. to 5 a.m. and weekends, 5 a.m. to 10 p.m. and weekends 5 a.m. to 10 p.m. Intermittent/temporary single and multiple MD 5 southbound off-peak lane closures weekdays, 6 a.m. to 12 noon overnight, Sunday through Thursday, 7 p.m. to 6 a.m. and intermittent/temporary single and multiple MD 637 single lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 7 p.m. to 6 a.m. through late summer 2022.
MD 5 (Branch Avenue) from Suitland Parkway to Curtis Drive. Median construction. Single northbound lane closure 24 hours a day through late summer 2022.
MD 210 (Indian Head Highway) at Kerby Hill Road/Livingston Road. Interchange construction project - Intermittent single and multiple-off peak lane closures on all roads, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through late summer 2022.
MD 212A (Powder Mill Road) from Pine Street to US 1 (Baltimore Avenue) - Roadway reconstruction project. Intermittent single and multiple lane closures weekdays, 8 a.m. to 4 p.m. through late summer 2022.
MD 223 (Woodyard Road) from Sherwood Drive to Victoria Drive. Sidewalk construction project. Off-peak lane closures, weekdays, 8:30 a.m. to 3:30 p.m. and Saturdays, 8 a.m. to 5 p.m. through late fall 2022.
MD 223 (Woodyard Road) at Dower House Road - Geometric improvement project - Single weekday lane closures, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through late summer 2022.
MD 500 (Queens Chapel Road) from Eastern Avenue to MD 208 (Hamilton Street) Community safety and enhancement project. Intermittent single and multiple lane closures weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 7 p.m. to 6 a.m. through late summer 2022.
I-95/I-495 (Capital Beltway) from Suitland Road to MD 4 (Pennsylvania Avenue) - Suitland Parkway bridge replacement project. Road shoulder closure permissible 24 hours daily, intermittent single and multiple lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Friday, 8 p.m. to 6 a.m. through year end 2022.