MDOT SHA LogoAll Work is Weather DependentReal-Time travel conditions and live traffic cameras md511.maryland.gov WeekendBaltimore/Harford County Line US 40 Dual Bridges over Little Gunpowder Falls and (Big) Gunpowder Falls – Bridge Replacement - Single lane closures on US 40 East and West in the vicinity of the bridges at any time between 7 a.m. and 4 p.m. on Saturdays through summer and fall 2021. Prince George’s County Northbound and Southbound I-95/I-495 (Capital Beltway) from Arena Drive to Ritchie Marlboro Road. Bridge replacement project. Intermittent off-peak single and multiple lane closures, overnight, on Friday, 8/13 at 7 p.m. through 6 p.m. on Saturday 8/14. Week Ahead Allegany County US 220 – Barton Park Drive to Bell Street – Single Lane Closures – 10 p.m.-6 a.m. Patch, mill and resurface. New Anne Arundel County MD 173 Bridge over Stoney Creek - Routine bridge maintenance with temporary openings on Monday August 16 between 6 a.m. and 2:30 p.m. MD 169 between Hammonds Ferry Road and MD 648 - Daytime flagging operation, 9 a.m. to 3 p.m., Monday through Friday. I-695 Southbound between MD 648 and MD 295 – Overnight pavement resurfacing, 9 p.m. to 5 a.m., Sunday through Thursday. MD 176 between Wright Road and Arundel Mills Boulevard/New Ridge Road – Daytime single lane closures, 8 a.m. to 4 p.m., Monday through Friday. MD 450 between Annapolis Street to US 50 (John Hanson Highway) near the Naval Academy Bridge – overnight patching and resurfacing, Sunday through Thursday night, 9 p.m. to 5 a.m. I-97 Bridge at New Cut Road - Nighttime single lane closures for pavement work Wednesday, August 18 and Thursday, August 19, 9 p.m. to 5 a.m.Baltimore City HIGH IMPACT I-895 (Baltimore Harbor Tunnel Throughway) between the tunnels and Boston Street/O’Donnell Street (exit 11) and the Holabird Avenue exit (MDTA Project) –Bridge rehabilitation project – Expect lane closures during off-peak travel times into summer 2021. Baltimore County I-695 Southwest Outer Loop Widening Project (US 40 to south of MD 144) - Roadway Widening and Bridge Replacement. I-695 South (Outer Loop) schedule Sunday-Thursday: Single lane closure 7 p.m.-5 a.m. the next day with double lane closure 10 p.m.-5 a.m. the next day. MD 137 (Mt. Carmel Rd.) from Gunpowder Rd. to MD 25 (Falls Rd.). Highway Maintenance roadway pavement milling, patching and resurfacing - Weekday single lane closures with flagging operations on MD 137 between 9 a.m. and 3 p.m. Monday-Friday, in summer 2021. MD 45 (York Rd.) from Gifford Rd. to Middletown Rd. - Highway Maintenance roadway pavement milling, patching and resurfacing – Work is now daytime, with single lane closures with flagging operations on MD 45 between 9 a.m. and 3 p.m. Monday-Friday, in summer 2021. Caroline County MD 328 (New Bridge Road) between MD 404 Business and Asbury Drive - Resurfacing, all lanes and shoulders. Single lane closures/flagging Monday-Friday 8 a.m. to 5 p.m., through August 27. Carroll County MD 26 (Liberty Road) between Calvert Way and Monroe Avenue - Highway maintenance roadway patching and resurface – Single lane closures overnight from 8 p.m. to 5 a.m. Sunday nights through Friday mornings. The project is expected to be complete in October. Calvert County MD 2 between Saint Michaels Court and the MD 2 / 4 intersection – Daytime single lane closures between 8 a.m. and 4 p.m. Charles County MD 224 between the Reeder Run Bridge and Reeder Place – Milling and resurfacing, daytime single lane closures between 8 a.m. and 4 p.m. Frederick County I-270: Exit ramp from southbound I-270 to northbound MD 85 and exit ramp from northbound MD 85 to southbound I-270 - Pipe installation - Overnight closures from 9 p.m. to 5 a.m. Sunday night through Friday. The work and closures are expected to continue through the summer season. Crestwood Boulevard between MD 85 (Buckeystown Pike) and Westview Drive – Pipe installation – Closed overnight Sundays through Thursdays from 9 p.m. to 5 a.m. the following morning. Detour route utilizes Executive Way. Emergency vehicles will be permitted through the closure. The overnight work is expected to be complete in September. MD 80 (Fingerboard Road) between Thurston Road and MD 355 (Urbana Pike) - Highway maintenance pavement patching - Single lane closures and flagging Sundays through Thursdays from 8 p.m. until 5 a.m. the next morning. MD 80 ramps at northbound I-270 will close when crews work at that location. Motorists will be detoured. This project is expected to be complete in October. New MD 28 (Dickerson Road) bridge over the Monocacy River – Bridge deck replacement project – Single lane closures with a flagging operation weekdays from 8 a.m. to 4 p.m. The weekday work is expected to be complete this month. Total bridge closure on the following weekends starting Fridays at 10 p.m. and ending Mondays by 5 a.m. on these dates: August 20 – 23 Updated Garrett County US 40 Alt – PA State Line to US 219 South – Single lane closures – 6:30 a.m.-7:00 p.m. Patch, mill and resurface. NewHarford County US 40 (Pulaski Hwy.) from Robinhood Rd. To MD 7 (Post Rd./Revolution St.) – Highway maintenance pavement repair, milling and resurfacing in Havre de Grace - Overnight single lane closures and lane shifts on eastbound and westbound US 40 Sunday-Thursday, between 9 p.m. and 5 a.m. the next day, through late September. MD 24 (Vietnam Veterans Memorial Hwy.) - Pavement resurfacing - Overnight single lane closures and traffic shifts Sunday through Thursday 8 p.m.-5 a.m. the next day through late September. Howard County MD 32 (Patuxent Freeway) at Dorsey Run Road – Road surface improvement project – Single lane closures on MD 32 and Dorsey Run Road between 7 p.m. and 6 a.m. along with daytime single lane closures Dorsey Run Road. Ramp B (Dorsey Run Road to Eastbound MD 32) is closed and expected to reopen in September. Motorists are detoured to the MD 32/US 1 (Washington Boulevard) interchange. MD 108 (Old Annapolis Road) between Centre Park Drive and Barrington Court, including ramps at eastbound MD 100 – Guardrail upgrades – Shoulder closure Monday through Friday from 9 a.m. to 3 p.m. starting Monday, August 16. The project will take one week to complete. New Montgomery & Prince George’s Counties Purple Line – For a list of active construction and lane closures along the Purple Line alignment, please click HERE (MTA project). Montgomery County MD 410 (East West Highway) at MD 186 (Brookville Road). Inlet/sidewalk construction project. Single, off-peak lane closures, weekdays, 9 a.m. to 3 p.m. through year-end 2021. MD 650 (New Hampshire Avenue) from the I-495 (Capital Beltway) ramps to Oakview Drive. Resurfacing project. Single and multiple off-peak lane closures, weekdays 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through late fall 2021.Prince George’s County Inner Loop/Outer Loop of I-95/I-495 from Temple Hill Road to MD 414 (St. Barnabas Road). Roadway patching. Single and multiple off-peak lane closures, overnight, Sunday through Thursday, 9 p.m. to 5 a.m. MD 210 (Indian Head Highway) northbound ramp to northbound I-495 (Capital Beltway). Resurfacing. Full ramp closure with detour, overnight, Sunday through Thursday, 9 p.m. to 5 a.m. Drivers should follow detour signs and use northbound MD 210 and MD 414 (St. Barnabas Road) to access northbound I-495. MD 223 (Woodyard Road) from Sherwood Drive to Victoria Drive. Sidewalk construction project. Off-peak lane closures, weekdays, 8:30 a.m. to 3:30 p.m. and Saturdays, 8 a.m. to 5 p.m. through late fall 2022. MD 223 (Woodyard Road) at Dower House Road. Geometric improvement project. Single weekday lane closures, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through year-end 2021. I-95/I-495 (Capital Beltway) from Suitland Road to MD 4 (Pennsylvania Avenue). Suitland Parkway bridge replacement project. Off-peak single and multiple lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Friday, 9 p.m. to 5 a.m. through year-end 2021. St. Mary's County MD 5 between Abell/Moakley Streets and MD 245 (Hollywood Road) - daytime single lane closures between 9 a.m. and 3 p.m. Updated Northbound MD 235 between By the Mill Road and north of MD 245 – Roadway milling and resurfacing. Crews are permitted to work overnight 8 p.m. to 5 a.m. or daytime 9 a.m. to 3 p.m. New MD 247 between MD 5 and Oakville Road – Daytime single lane closures for milling and resurfacing, 9 a.m. to 3 p.m. New Washington County US 40 – Big Pool Rd to I-70 (Exit 9) – Single lane closures – 6 a.m.-6 p.m. Patch, mill and resurface. New Long-Term ClosuresAllegany County MD 51 (Industrial Boulevard) between Canal Parkway and Second Street – Bridge Rehabilitation – Northbound side of bridge closed - traffic is shifted onto the southbound side of the bridge – one lane traffic in each direction. MD 51 (Oldtown Road) over the C&O Canal near Paw Paw Tunnel – Bridge Rehabilitation - both lanes are closed and a temporary traffic signal is rotating traffic through a single center lane. MD 135 West of the MD 36 Intersection and MD 135 and River Road area Westernport/Bloomington – Bank stabilization - northbound lane will be closed – southbound lane will be used for commute lane -Traffic signage, barriers, lights and flaggers will be in place for directing and maintaining traffic control. Anne Arundel County MD 2 between Pasadena Road and MD 270 (Furnace Branch Road) - Overnight single lane closures, Sunday through Thursday nights, 9 p.m. and 5 a.m. MD 32 at MD 3 interchange – Ramp resurfacing, Sunday through Thursday nights 9 p.m. and 5 a.m. Baltimore County Cove Road bridge over I-695 - Bridge deck replacement - On I-695, daytime single lane closures in both directions Monday-Friday between 9 a.m. and 3 p.m. and overnight lane closures Sunday-Thursday between 7 p.m. and 5 a.m. the next day. On Cove Road bridge over I-695, long-term single lane closures are in effect, with two-way traffic on the northern side of the bridge deck. I-70 bridges over Patapsco River and CSX Rail Line at Baltimore/Howard Co. Line – Bridge Parapet Rehabilitation - Single lane closures Monday-Friday between 9 a.m. and 3 p.m. and overnight single and double lane closures Sunday-Thursday between 7 p.m. and 5 a.m. the next morning. Lane closures permitted when needed on Saturdays between 9 a.m. and 3 p.m. I-83 (Baltimore-Harrisburg Expressway) North and South Bridges over Padonia Road – Dual Bridge replacement and interchange improvements. There may be single lane closures on I-83 North and I-83 South between 9 a.m. and 4 p.m. Monday-Friday and between 7 p.m. and 5 a.m. the next day Sunday-Thursday. Single lane closures on Padonia Rd. West between 9 a.m. and 3 p.m. Monday-Saturday, and between 8 p.m. and 5 a.m. the next day Sunday-Thursday. Detours of Padonia Rd. underneath I-83 possible on any weeknights (Sunday-Thursday) between 8 p.m. and 5 a.m. the next morning. Note: Interchange Ramp from Padonia Road East to I-83 North closed 24 hours/7 days until project is complete. MD 695A (Broening Hwy.) between Maryland Ave. and east of Ralls Ave. at Baltimore City/County Line in Dundalk - Roadway Resurfacing and Safety Improvements – Daytime single lane closures on Broening Hwy. between 9 a.m. and 3 p.m. Monday-Thursday and between 9 a.m. and 2 p.m. Friday. Overnight double lane closures with traffic lane shifts on Broening Hwy. between 8 p.m. and 5 a.m. the next day Sunday-Thursday. US 40 Dual Bridges over Little Gunpowder Falls and (Big) Gunpowder Falls – Bridge replacement – Weekdays: Eastbound US 40 (towards Aberdeen) 6 a.m. to 4 p.m. Westbound US 40 (towards Baltimore) 8 a.m. to 4 p.m. Weeknights: Eastbound and Westbound US 40 8 p.m. to 5 a.m. the next day, Sunday-Thursday nights. Saturdays: Single lane closures on Eastbound and Westbound in the vicinity of the bridges at any time between 7 a.m. and 4 p.m. on Saturdays through summer 2021. US 1 (Washington Blvd.) Bridge over CSX Transportation rail lines – Bridge replacement – As of June 10, 2021, Clarke Blvd. at US 1 is closed/detoured 24 hours, 7 days/week for one year. Posted detour route includes Selford Rd., Francis Ave., Oregon and Carville Aves., Tom Day Blvd. and US 1 Alt. (Southwestern Blvd.). MD 43 (White Marsh Blvd.) at Honeygo Blvd. - Intersection Widening and Improvements - Temporary daytime lane closures on MD 43 and Honeygo Blvd. legs of the intersection between 9 a.m. and 3 p.m. Monday-Friday, and overnight lane closures at any time between 8 p.m. and 5 a.m. the next day Sunday-Thursday. When necessary, there will be temporary lane closures on weekends, 7 a.m.-1 p.m. MD 45 (York Road) between north of Padonia Road and Wight Avenue – Roadway Resurfacing/County Water Main replacement – Single and double lane closures on MD 45 for overnight final paving and marking work between 9 p.m. and 5 a.m. the next day Sunday-Thursday and single lane closures where needed between 9 a.m. and 3 p.m. Monday-Friday through late August. MD 140 (Reisterstown Rd.) between Painters Mill Rd. and E. Pleasant Hill Rd. – Resurfacing/County Water Main replacement - Crews currently installing new 36-inch water main from Owings Mills Blvd. to East Pleasant Hill road with connections to fire hydrants and buildings along MD 140. Daytime single lane closures between 9 a.m. and 3 p.m. between Owings Mills Blvd. and E. Pleasant Hill Rd. Night time single lane closures within project limits Sunday-Thursday nights between 9 p.m. and 5 a.m. the next day. Access to all driveways in this section will be maintained during any lane closures. MD 140 (Reisterstown Rd.) between E. Pleasant Hill Rd. and Stocksdale Ave. – Resurfacing/County Water Main replacement - Daytime single lane closures Monday - Friday 9 a.m.-3 p.m. between E. Pleasant Hill Rd and Stocksdale Ave. Night time single lane closures within project limits Sunday-Thursday nights between 8 p.m. and 6 a.m. the next day. Access to driveways in this section will be maintained during any lane closures. MD 147 (Harford Rd.) / Joppa Rd. - Intersection Improvements - Daytime single lane closures and flagging operations on Harford and Joppa Road in the vicinity of the intersection Monday-Thursday 9 a.m.-4 p.m. Monday-Thursday and 9 a.m.-3 p.m. Fridays. Overnight work with lane closures Sunday-Thursday 9 p.m.-5 a.m. the next day. Traffic lane shift now in effect 24/7 along southbound MD 147 at Joppa Rd. MD 150 (Eastern Ave.) between the bridge over Back River and the intersection with Mace Ave./Riverside Dr. - Baltimore County Water main replacement and MDOT SHA highway resurfacing – Occasional single lane closures on westbound MD 150 for final daytime concrete curb, ramp and sidewalk work Monday-Friday between 9 a.m. and 3 p.m. through mid-August. MD 151 (Sparrows Pt. Blvd.) / Wharf Road (MD 151 B) Interchange - Three-bridge replacement project at interchange. The southbound side of the existing MD 151 bridge is closed and two-way traffic - one lane in each direction - runs on the northbound side of the bridge. This will be in effect for the next year and will enable partial demolition of the existing bridge over Wharf Road and future construction of the new bridge. This is in addition to the detours of southbound and northbound Wharf Road at the interchange. Notes: As of May 12, the northbound side of MD 151 is closed between the Baltimore County Highways Maintenance Shop (1500 block) and the Wharf Rd. Interchange. Two- way traffic will run on the southbound side of MD 151, one lane in each direction. The existing ramp from Northbound MD 151 to southbound Wharf Road is open for local traffic only. Cecil County MD 279 (Elkton Road) at MD 277 (Fletchwood Road) – Northbound MD 279 is reduced to a single lane at the MD 277 intersection near the Delaware line and shifted across the median to a contraflow pattern (one lane in each direction) through summer 2021. This is part of the Delaware Department of Transportation (DelDot) reconstruction of route 279. Updated Frederick County I-270 (Eisenhower Highway) southbound from MD 121 (Clarksburg Road) to MD 109 (Old Hundred Road) I-270 acceleration lane expansion project. Single and multiple off-peak lane closures, weekdays 9:30 a.m.to 3:30 p.m. and overnight, Sunday through Thursday, 7 p.m. to 4 a.m. through year-end 2021. Possible Traffic Impact in Frederick County Harford County Old Joppa Road Bridge over I-95 (MDTA project) – Bridge replacement project – Old Joppa Road closed and locally detoured. Clayton Road bridge over I-95 between MD 152 and MD 24 (MDTA project) - Clayton Road closed and detoured until early 2022. MD 22 (Churchville Road) between MD 136 (Calvary Road) and Prospect Mill Road -Roadway resurfacing and intersection widening – Occasional single lane closures/lane shifts on MD 22 east and west of Thomas Run Road/Shucks Road intersection when necessary between 9 a.m. and 3 p.m. Monday-Friday, and between 8 p.m. and 5 a.m. the next day Sunday-Thursday and between 7 a.m. and 1 p.m. Saturdays when necessary through late summer 2021. MD 924 South (Kenmore Avenue) between US 1 and Main Street, and MD 924 (Emmorton Road) between Ring Factory Road and Plumtree Road -Roadway resurfacing and traffic signal upgrades - Occasional concrete curb, ramp, sidewalk work on sections of MD 924 through spring 2021. MD 924 from Ring Factory Rd. to Plumtree Rd. Monday-Friday, 9 a.m.-3 p.m. and Sunday-Thursday, 9 p.m. until 5 a.m. the next day; MD 924 from US 1 to Kenmore Ave. Monday-Friday, 9 a.m.-3 p.m. and Sunday-Thursday, 9 p.m.-5 a.m. the next day through late summer 2021. Montgomery County MD 410 (East West Highway) at MD 186 (Brookville Road). Inlet/sidewalk construction project. Single, off-peak lane closures, weekdays, 9 a.m. to 3 p.m. through year-end 2021. MD 185 (Connecticut Avenue) at Jones Bridge Road/Kensington Parkway. Intersection improvement project. Single off-peak lane closures on MD 185, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. and single off-peak lane closures on Jones Bridge Road, weekdays, 9 a.m. to 3 p.m. and overnight, 7 days per week, 9 p.m. to 5 a.m. through late summer 2023. US 29 (Colesville Road) from St. Andrews Way to Stewart Lane. Safety and resurfacing project - Single daytime lane closures, weekdays, 9 a.m. to 3 p.m. and single/multiple off-peak overnight lane closures, Sunday through Thursday, 9 p.m. to 5 a.m. through year-end 2021. MD 97 (Georgia Avenue) from north of Gold Mine Road to south of Holiday Drive. Roadway relocation project. Intermittent single northbound and southbound lane closures weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 6 a.m. through late summer 2021. MD 190 (River Road) from MD 188 (Wilson Lane) to MD 614 (Goldsboro Road). Roadway improvement project. Single lane closures, weekdays, 9 a.m. to 3 p.m. and multiple lane closures, overnight, 9 p.m. to 5 a.m. through late summer 2021. MD 185 (Connecticut Avenue) from MD 547 (Knowles Avenue) to Dupont Avenue. Geometric/median improvement project. Single and multiple off-peak northbound and southbound lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 6 a.m. through year-end 2021. I-270 (Eisenhower Highway) from Interstate 70 to I-495 (Capital Beltway). Traffic congestion relief construction project - Intermittent single lane closures, weekdays, 10 a.m. to 3 p.m. and single, double and triple overnight lane closures, Sunday through Thursday, 7 p.m. to 5 a.m. and intermittent temporary ramp closures with detours up to 24 hours a day through year-end 2021. I-270 (Eisenhower Highway) southbound from MD 121 (Clarksburg Road) to MD 109 (Old Hundred Road). I-270 acceleration lane expansion project. Single and multiple off-peak lane closures, weekdays 9:30 a.m.to 3;30 p.m. and overnight, Sunday through Thursday, 7 p.m. to 4 a.m. through year-end 2021. Seminary Road from Hale Street to MD 192 (Forest Glen Road) - Bridge rehabilitation project - Intermittent left and right single northbound and southbound lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 8 p.m. to 5 a.m. through late fall 2021. Inner and Outer Loop of I-495 (Capital Beltway) from MD 97 (Georgia Avenue) to MD 185 (Connecticut Avenue). Bridge rehabilitation project. Intermittent single weekday single lane closures, 9 a.m. to 3 p.m. and intermittent off=peak single and multiple lane closures with intermittent full traffic stops, Sunday through Thursday, 9 p.m. to 5 a.m. through late fall 2021. Prince George’s County US 1 (Baltimore Avenue), College Ave. to MD 193 (University Boulevard) - US 1 Reconstruction Project - Corridor Improvement- Northbound and southbound single lane closures throughout the length of the project Saturday through Sunday, 10 a.m. to 4 p.m. and 9 p.m. to 7 a.m. through summer 2023. MD 5 (Branch Avenue) from the DC Line to the intersection of Curtis Drive. Safety and resurfacing project. Intermittent/temporary single and multiple MD 5 northbound off-peak lane closures, weekdays, 9 a.m. to 3 p.m., overnight, Sunday through Thursday 7 p.m. to 5 a.m. and weekends, 5 a.m. to 10 p.m. and weekends 5 a.m. to 10 p.m. Intermittent/temporary single and multiple MD 5 southbound off-peak lane closures weekdays, 6 a.m. to 12 noon overnight, Sunday through Thursday, 7 p.m. to 6 a.m. and intermittent/temporary single and multiple MD 637 single lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 7 p.m. to 6 a.m. through late spring 2022. MD 210 (Indian Head Highway) at Kerby Hill Road/Livingston Road. Interchange construction project – Crossover from Kerby Hill Rd. to Livingston Rd. across MD 210 to close and be detoured. Click here for detour routes. Crews construction bridge that will connect the roads and will be complete by the end of 2021. MD 212A (Powder Mill Road) from Pine Street to US 1 (Baltimore Avenue). Roadway reconstruction project. Intermittent single and multiple lane closures weekdays, 8 a.m. to 4 p.m. through late summer 2022. Eastbound MD 214 (Central Avenue) ramp to northbound I-95/I-495 (Capital Beltway). Bridge construction project. Full ramp closure with detour through year-end 2021. Drivers should use the signed detour route of eastbound MD 214 to northbound MD 202 (Largo Road) to westbound MD 214 to access northbound I-95/I-495). MD 500 (Queens Chapel Road) from Eastern Avenue to MD 208 (Hamilton Street). Community safety and enhancement project. Intermittent single and multiple lane closures weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 7 p.m. to 6 a.m. through late summer 2022. Southbound I-95/I-495 (Capital Beltway) ramp to eastbound MD 214 (Central Avenue) – Bridge replacement project – Total ramp closure with traffic using the Capital Beltway/MD 202 (Largo Road) interchange and then to MD 214 via MD 202 to year end 2021. I-95/I-495 (Capital Beltway) over Suitland Road. Bridge replacement project. Intermittent single and multiple lane closures, weekdays, 7 a.m. to 5 p.m. and overnight, Sunday through Thursday, 8 p.m. to 5 a.m. and weekends, Saturday night 6 p.m. to 11 a.m. Sunday morning through late summer 2021. I-95/I-495 (Capital Beltway) from Suitland Road to MD 4 (Pennsylvania Avenue). Suitland Parkway bridge replacement project. Road shoulder closure permissible 24 hours daily, intermittent single and multiple lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Friday through Thursday, 8 p.m. to 6 a.m. through year-end 2021. St. Mary’s County MD 5 between Abell/Moakley Streets and MD 245 (Hollywood Road) - Daytime single lane closures between 9 a.m. and 3 p.m. Washington County I-70 Eastbound and Westbound at the MD 65 Interchange – Bridge rehabilitation and widening of I 70 bridge over MD 65- Left shoulder closed EB/WB long term for phase 1 work. Intermittent, single lane closures at nighttime from Sunday through Thursday between midnight and 5 a.m. on I-70. Additionally, alternating/single lane closures will be performed between 9 a.m. and 3 p.m., weekdays on MD 65 Northbound and Southbound. I-70 Eastbound/Westbound between Boyd Road and Ashton Road - Grinding and paving procedures and traffic barrier upgrades – Nightly lane closures – Sunday-Thursday 8 p.m.-7 a.m. Single lane closures will be utilized to complete operations.