I-97 between MD 174 and Benfield Boulevard – 9 p.m. to 5 a.m., Sunday through Thursday nights; 9 a.m. to 3 p.m. Monday through Friday.
MD 450 near Huntwood Drive - Daytime flagging operation - 9 a.m. to 3 p.m.
MD 648 at Hoyle Lane - Daytime flagging operation – 9 a.m. to 3 p.m.
MD 32 between MD 295 and MD 198 – Nighttime single lane closures - 9 p.m. to 5 a.m.
MD 2 between MD 270 (Furnace Branch Road) and I-695 (Baltimore Beltway) - Nighttime single lane closures - Resurfacing - 8 p.m. to 5 a.m.
MD 2 between MD 253 (Mayo Road) and Tarragon Lane – Utility work - daytime single lane closures, Monday through Friday, 9 a.m. to 3 p.m.
MD 175 Annapolis Road/Jessup Road) Westbound between National Business Parkway and MD 295 (Baltimore-Washington Parkway) – Utility relocation – Single lane closures Sunday nights through Friday mornings from 7 p.m. to 5 a.m.
MD 424 between Duke of Kent Drive and MD 450 (Defense Highway) - Improvement project – Single lane closures between 9 a.m. and 3 p.m., weekdays.
I-70 East and West from I-695 (Baltimore Beltway) to Baltimore/Howard Co. line – Part of Areawide Interstate route pavement resurfacing - Single lane closures on I-70 East between 7 p.m. and 5 a.m. the next day Sunday-Thursday; double lane closures between 8 p.m. and 5 a.m. the next day Sunday-Thursday.
I-83 (Baltimore-Harrisburg Expressway) North and South Bridges over Padonia Road –Dual Bridge replacement and interchange improvements – I-83 South and North both have a split traffic pattern at Padonia Rd. interchange with all lanes open (two left, one right) until late fall 2020 (South) and spring 2021 (North). I-83 North and South may have single lane closures between 9 a.m. and 4 p.m. Monday-Friday and between 7 p.m. and 5 a.m. the next day Sunday-Thursday. 24 hours/7 days single lane closure on Padonia Rd. East until project is complete. Notes: Interchange Ramp from Padonia Road East to I-83 North closed 24 hours/7 days until project is complete. Single lane closures on Padonia Rd. West between 9 a.m. and 3 p.m. Monday-Saturday, and between 8 p.m. and 5 a.m. the next day Sunday-Thursday. Detours of Padonia Rd. underneath I-83 possible on any weeknights (Sunday-Thursday) between 8 p.m. and 5 a.m. the next morning.
I-695 South (Baltimore Beltway Outer Loop) between US 40 (Baltimore National Pike) and MD 144 (Frederick Road) – Southwest Outer Loop highway widening project – Single and double lane closures along I-695 South and North (Outer and Inner Loop) between 9 p.m. and 5 a.m. Sunday - Thursday. Interchange Ramp from I-695 South/Outer Loop at Exit 13 - MD 144 (Frederick Road) closed for reconstruction until early fall 2020.
I-695 North/Outer Loop from MD 151 (North Point Boulevard) to Cove Road- Areawide interstate highway pavement resurfacing - Overnight single lane closures Sunday-Thursday nights between 7 p.m. and 5 a.m.
• Cove Road bridge over I-695 - Bridge deck replacement - On I-695, daytime single lane closures in both directions Monday-Friday between 9 a.m. and 3 p.m. and overnight lane closures Sunday-Thursday between 7 p.m. and 5 a.m. the next day. On Cove Road, daytime single lane closures in both directions Monday-Friday between 9 a.m. and 3 p.m. and overnight lane closures Sunday-Thursday between 7 p.m. and 5 a.m. the next day Sunday-Thursday.
MD 150 (Eastern Ave.) between the bridge over Back River and the intersection with Mace Ave./Riverside Dr. - Baltimore County Water main replacement and MDOT SHA highway resurfacing – Single lane closures on eastbound and MD 150 between 9 a.m. and 3 p.m., Monday-Friday, and between 7 p.m. and 5 a.m. the next day, Sunday-Thursday.
MD 140 (Reisterstown Rd.) Northbound between Garrison View Rd. and Painters Mill Rd. – Highway Widening and Resurfacing - Single and double lane closures along northbound MD 140 Sunday-Thursday between 9 p.m. and 5 a.m. the next morning. Occasional single lane closures Monday-Friday for a two-hour time period between the hours of 9 a.m. and 3 p.m.
MD 140 (Reisterstown Rd.) between Painters Mill Rd. and Pleasant Hill Rd. –Resurfacing/County Water Main replacement - Single lane closures with lane shifts along northbound and southbound MD 140 from Straw Hat Road to East Pleasant Hill Road. Crews currently installing new 36-inch water main from Straw Hat Road to Pleasant Hill Rd. Daytime single lane closures Monday-Friday between 9 a.m. and 3 p.m. Night time single lane closures Sunday-Thursday between 8 p.m. and 6 a.m. the next day. Access to all driveways in this section will be maintained during the lane closures.
Updated
MD 45 (York Road) between north of Padonia Road and Wight Avenue – Roadway Resurfacing/County Water Main replacement – Single and double lane closures on MD 45 for night paving work between 9 p.m. and 5 a.m. the next day Sunday-Thursday and single lane closures where needed between 9 a.m. and 3 p.m. Monday-Friday.
US 40 (Pulaski Hwy.) Dual Bridges over the Gunpowder Falls and the Little Gunpowder Falls (Baltimore/Harford Co. Line) - Bridge rehabilitation - Single lane closures on US 40 East between 7 a.m. and 3 p.m. Monday-Friday, and on US 40 West between 7 a.m. and 4 p.m. Monday-Friday.
US 29 (Colesville Road) from MD 97 (Georgia Avenue) to Spring Street. - WSSC pipe replacement project - Intermittent northbound and southbound lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through fall 2020.
US 29 (Colesville Road) from St. Andrews Way to Stewart Lane. -Safety and resurfacing project - Single daytime lane closures, weekdays, 9 a.m. to 3 p.m. and double overnight lane closures, Sunday through Thursday, 9 p.m. to 5 a.m. through year-end 2021.
MD 97 (Georgia Avenue) from north of Gold Mine Road to south of Holiday Drive. - Relocation project.- Intermittent single northbound and southbound lane closures, weekdays, 8 a.m. to 4 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through year-end 2021.
MD 124 (Quince Orchard Road) from Dosh Drive to MD 117 (Clopper Road/West Diamond Avenue). Bicycle/pedestrian improvement project. Intermittent single daytime lane closures, weekdays, 9 a.m. to 3 p.m. through fall 2020.
MD 190 (River Road) from MD 188 (Wilson Lane) to MD 614 (Goldsboro Road). Roadway improvement project. Single lane closures, weekdays, 9 a.m. to 3 p.m. and multiple lane closures, overnight, 9 p.m. to 5 a.m. through late spring 2021.
MD 355 (Frederick Road) at West Old Baltimore Road- Intersection construction project - Intermittent single lane closures on both roads, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 7 p.m. to 6 a.m. through year-end 2020.
I-270 (Eisenhower Highway) from Watkins Mill Road to Great Seneca Creek Crossing.- Interchange construction project. -Intermittent northbound lane closures, weekdays, 5 a.m. to 2 p.m. and southbound 10 a.m. to 7 p.m. and overnight northbound and southbound lane closures, Sunday through Thursday, 7 p.m. to 5 a.m. through fall 2020.
I-270 (Eisenhower Highway) from Interstate 70 to I-495 (Capital Beltway). – Traffic congestion relief construction project – Intermittent single lane closures, weekdays, 10 a.m. to 3 p.m. and single, double and triple overnight lane closures, Sunday through Thursday, 7 p.m. to 5 a.m. and intermittent temporary ramp closures with detours up to 24 hours a day through late spring 2021.
Seminary Road from Hale Street to MD 192 (Forest Glen Road) - Bridge rehabilitation project – Intermittent left and right single northbound and southbound lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 8 p.m. to 5 a.m. through year-end 2020.
Inner and outer loops of I-495 (Capital Beltway) from MD 97 (Georgia Avenue) to MD 185 (Connecticut Avenue). Bridge rehabilitation project. Intermittent single weekday single lane closures, 9 a.m. to 3 p.m. and intermittent overnight single double and triple lane closures and full traffic stops, Sunday through Thursday, 9 p.m. to 5 a.m. through year-end 2020.