SHA PLANNED LANE CLOSURE UPDATE (08/18/2016 – 08/22/2016)

MDOT SHA Logo

MDOT SHA Logo

(All Work is Weather Permitting)

Anne Arundel County
 
• I-695 (Baltimore Beltway) at MD 170 (Camp Meade Road) – Bridge repair – Double lane closures on the inner loop and outer loop of I-695 Sunday through Thursday from 9 p.m. until 5 a.m.

Baltimore County
 
• MD 7 (Philadelphia Road) between Rossville Boulevard and Golden Ring Road – Resurfacing/Concrete bus pads – Single lane closures beginning Friday until 6 a.m. Sunday.

• Outer loop I-695 at MD 702 Bridge work – Left lane closure Saturday from 6 a.m. until 2 p.m.

• I-95 between US 1 (Southwestern Boulevard) and the Howard County lineResurfacing – Double lane closures Sundays through Thursday from 9 p.m. Friday until 5 a.m.
 
Frederick County

 Northbound US 15 at westbound MD 26 (Liberty Road) Bridge replacement project/Concrete barrier placement – Left lane to be closed at 10 p.m. Friday until 6 a.m. Saturday. If weather is an issue, the lane closure will occur on Saturday into Sunday at the same times. 
 
• Southbound I-270 between I-70 and MD 85 (Buckeystown Pike) Resurfacing – Single lane closures Sundays through Thursday from 9 p.m. until 5 a.m.

Howard County

• MD 216 (Scaggsville Road) between MD 108 and US 29 (Columbia Pike)Pavement repair/patching – Single lane closures Sundays through Fridays between 8 p.m. until 5 a.m. 
 
• MD 175 at I-95 Bridge approach patching – Single lane closures Sundays through Fridays between 8 p.m. until 5 a.m. 

• Eastbound and westbound US 40 (Baltimore National Pike) between US 29 (Columbia Pike) and Centennial Lane - Resurfacing – Single lane closure from 10 p.m. Friday until 6 a.m. Saturday. 

• Southbound MD 32 between MD 108 and the Middle Patuxent River Bridge Resurfacing – Single lane closures Sundays through Thursday between 8 p.m. and 5 a.m.
 
Montgomery County

• Inner loop I-495 between the western I-270 spur and Seminary Avenue (near MD 185) Resurfacing - Double lane closures Sundays through Thursdays from 9 p.m. until 6 a.m.

• MD 193 (University Boulevard) between Williamsburg Drive and Franklin Avenue Resurfacing - Double lane closures Sundays through Thursdays from 8 p.m. until 5 a.m.

Prince George’s County

 Northbound I-95 (outer loop of I-495) between MD 450 (Annapolis Road) and I-95 – Emergency roadwork to grind down heaving/pavement humps in the road - Double lane closures on NB I-95 between 6 a.m. and 3 p.m.

• Southbound I-95 (inner loop of I-495) near MD 450 (Annapolis Road)Bridge repair - Triple lane closures on SB I-95. Single lane closure will begin at 7 p.m. with double and triple lanes between 10 p.m. until 5 a.m. Work should be complete by August 28.

• MD 5 (Branch Avenue) between MD 223 (Woodyard Road) and Surrats Road Resurfacing/Patching – Single lane closures between 8 p.m. until 5 a.m. Sundays through Thursdays.

• MD 295 (Baltimore Washington Parkway) Bridge over northbound I-95 (outer loop of I-495) – Bridge repair - Double lane closures on NB I-95 beginning at 9 p.m. Sunday until 5 a.m. Monday.

• Eastbound US 50 between Lottsford Vista Road and the Anne Arundel County Line Resurfacing - Double lane closures Sundays through Thursdays from 9 p.m. until 5 a.m.

 I-95 between I-95/I-495 (Capital Beltway) and MD 212 (Old Gunpowder Road) - Resurfacing - Double lane closures Sundays through Thursdays from 9 p.m. until 5 a.m.
 
Total Closures with Detours

Cecil County

• MD 222 Bridge over Rock Run Bridge replacement – Total closure and detour for ten weeks. 
 
Montgomery County

• MD 195 (Carroll Avenue) between Jefferson Avenue and Flower Avenue (MD 195 Bridge over Sligo Creek and Parkway) - Bridge rehabilitation – Bridge to closed and traffic detoured for one year beginning at 10 a.m. Monday. 

Wicomico County

• MD 349 (Nanticoke Road) between Oliver Drive and Rockawalkin Road Road washout/pipe repair – Road closed and detoured until late-August.  
 
A look ahead at next week

Anne Arundel County
 
• I-895 (Harbor Tunnel Thruway) Bridge over the Patapsco River (Patapsco Flats) (MDTA project)Bridge rehabilitation – Reduced lanes. 
 
Baltimore County
 
• MD 147 (Harford Road) at I-695 (Baltimore Beltway)Traffic signal on MD 147 at the ramp from the inner loop of I-695 will go on flash mode/Interchange reconstruction project- Possible single lane closure on Friday, August 26 between 9 a.m. and 3 p.m.
 
• MD 147 (Harford Road) between Knoll Acres Drive to Placid Avenue Milling and paving as part of a Baltimore County water main replacement project – Single lane closure with a flagging operation Monday through Friday between 9 a.m. and 3 p.m.
 
Carroll County
 
• MD 27 (Ridge Road) between MD 140 (Baltimore Boulevard) and MD 26 (Liberty Road)Patching - Single lane closures Mondays through Fridays between 9 a.m. and 3 p.m.
Frederick County

• Eastbound US 340 between MD 17 (Burkittsville Road) and Lander RoadResurfacing – Single lane closures from 10 a.m. until 3 p.m. and 8 p.m. until 5 a.m.
 
Harford County

• MD 165 (Baldwin Mill Road) between MD 152 (Fallston Road/Mountain Road) and MD 23 (East-West Highway)Pavement repair/patching – Single lane closures from 6 a.m. until 4 p.m. and occasional Saturdays from 6 a.m. until 2 p.m.  New
 
Garrett County

• I-68 (National Freeway) between US 219 and Shade Hollow Road Resurfacing – Single lane closures from 6 a.m. until 6 p.m.

• US 40 Alt. (National Pike) between US 219 (Chestnut Ridge Road) and Green Lantern Road Resurfacing – Single lane closures with flagging operations between 9 a.m. and 3 p.m., Mondays through Fridays.
 
Prince George’s County
 
• MD 704 (Martin Luther King, Jr. Highway) between Ardwick-Ardmore Road and 92nd Avenue - Resurfacing - Single lane closures Sundays through Thursdays from 9 p.m. to 5 a.m. 
 
Washington County
 
• Eastbound I-70 at I-68 (National Freeway)Traffic pattern shift for bridge replacement project – Traffic shifts beginning Monday between 7 p.m. and 6 a.m.

• I-70 between MD 56 (Big Pool Road) and Boyd Road Resurfacing – Single lane and shoulder closures Sundays through Thursday from 8 p.m. until 5 a.m. 
 
• Northbound I-81 between I-70 and Halfway Boulevard Merge/auxiliary lane construction – Narrow and shortened ramps. 
 

###