(All work is weather permitting)
Anne Arundel County
• I-895 (Harbor Tunnel Thruway) Bridge over the Patapsco River (Patapsco Flats) (MDTA project) –
Bridge rehabilitation – Reduced lanes.
Baltimore County
• I-95 between I-695 (Baltimore Beltway) and the Howard County line –
Resurfacing – Double left lane closures Sundays through Thursdays between 8 p.m. and 5 a.m.
• I-83 (Baltimore-Harrisburg Expressway) between Dairy Road and MD 45 (York Road) –
Resurfacing (grinding and paving) – Single lane closures Sundays through Thursdays from 7 p.m. until 5 a.m.
• Campbell Boulevard between Honeygo Boulevard and Franklin Square Drive (MDTA project) – Express toll lane construction – Single lane closures from 6 a.m. to 5 p.m. Mondays through Fridays until late-August.
Cecil County
•
MD 222 Bridge over Rock Run –
Bridge replacement – Total closure and detour through late summer.
Click here for more project information.
Charles County
Friday 7/29/16
• US 301 Northbound paving between Smallwood Drive and VFW Road - 9:00pm to 5:00am , right shoulder and right turn lane, weather permitting.
Frederick County
• MD 194 (Woodsboro Pike) between Daysville Road and MD 26 (Liberty Road) –
Resurfacing – Single lane closures guided by flaggers Sundays through Thursdays between 8 p.m. and 5 a.m.
• Eastbound US 340 between MD 17 (Burkittsville Road) and Lander Road –
Resurfacing – Single lane closures from 10 a.m. until 3 p.m. and 8 p.m. until 5 a.m.
Garrett County
• I-68 (National Freeway) between US 219 and Shade Hollow Road –
Resurfacing – Single lane closures from 6 a.m. until 6 p.m.
• US 40 Alt. (National Pike) between US 219 (Chestnut Ridge Road) and Green Lantern Road –
Resurfacing – Single lane closures with flagging operations between 9 a.m. and 3 p.m., Mondays through Fridays.
Howard County
• US 1 (Washington Boulevard) at Guilford Road –
Resurfacing – Single lane closures Sundays through Fridays between 8 p.m. until 5 a.m.
• Southbound US 29 (Columbia Pike) between Broken Land Parkway and Seneca Drive –
Highway widening (sod installation) – Single left lane closure Saturday from 6 p.m. until 12 noon.
• Eastbound and westbound US 40 (Baltimore National Pike) between Centennial Lane and St. John’s Lane –
Resurfacing – Single and double lane closures Sundays through Fridays between 7 p.m. until 5 a.m.
Montgomery County
•
MD 193 (University Boulevard) between Williamsburg Drive and Franklin Avenue –
Resurfacing - Double lane closures Sundays through Thursdays from 8 p.m. until 5 a.m.
•
MD 195 (Carroll Avenue) between Jefferson Avenue and Flower Avenue (MD 195 Bridge over Sligo Creek and Parkway) -
Bridge rehabilitation – Bridge closed on July 25 for up to one year.
Click here for more information. (New)
Prince George’s County
• Eastbound US 50 between Lottsford Vista Road and the Anne Arundel County Line –
Resurfacing - Double lane closures Sundays through Thursdays from 9 p.m. until 5 a.m.
• I-95 between I-95/I-495 (Capital Beltway) and MD 212 (Old Gunpowder Road) -
Resurfacing - Double lane closures Sundays through Thursdays from 9 p.m. until 5 a.m.
• MD 704 (Martin Luther King, Jr. Highway) between Ardwick-Ardmore Road and 92nd Avenue -
Resurfacing - Single lane closures Sundays through Thursdays from 9 p.m. to 5 a.m.
Washington County
• I-70 between MD 56 (Big Pool Road) and Boyd Road –
Resurfacing – Single lane and shoulder closures Sundays through Thursday from 8 p.m. until 5 a.m.
• Northbound I-81 between I-70 and Halfway Boulevard – Merge/auxiliary lane construction – Narrow and shortened ramps.
Wicomico County
• MD 349 (Nanticoke Road) between Oliver Drive and Rockawalkin Road –
Road washout/pipe repair – Road closed and detoured through mid-August.