SHA PLANNED LANE CLOSURE UPDATE (06/10/2016 – 06/13/2016)

MDOT SHA Logo

MDOT SHA Logo

Projects highlighted in red print indicate the potential for severe congestion.
 
(All Work is Weather Permitting)

Anne Arundel County

• Southbound I-97 between Quarterfield Road and New Cut Road Concrete Patching – Double lane closures from 9 p.m. Friday until 5 a.m. Monday.  Beachgoers should consider using MD 2 (Ritchie Highway) or MD 295 to MD 32 and back to I-97 as alternates.

• Westbound US 50 between Oceanic Avenue and Whitehall Road Resurfacing – Double lane closures Monday from 9 p.m. to 5 a.m. Tuesday.

• Eastbound US 50 east of Severn River Bridge to Whitehall Road Resurfacing – Two lanes blocked from 9 p.m. Sunday until 5 a.m. Monday.

• MD 179 (St. Margarets Road) between Buschs Frontage Road (at the US 50 interchange) and MD 648 (Baltimore Annapolis Boulevard)Resurfacing – Single lane closures with a flagging operation.  Grinding (removing the top layer of asphalt) will take place Mondays through Fridays between 9 a.m. and 3 p.m. and paving will occur at night Sundays through Thursdays between 8 p.m. and 5 a.m. each morning.
 
Baltimore County
 
• Northbound US 1 Alternate (Washington Boulevard) near Commerce Drive Concrete bus pad installation - Single lane closure beginning at 4 a.m. Saturday until 2 p.m. Sunday.
 
Calvert County
 
• MD 231 (Benedict Bridge) over the Patuxent River Bridge cleaning - Single lane closure with flagging operation Saturday from 6 a.m. until 2 p.m.
 
Calvert/St. Mary’s County Line
(Postponed)

• MD 4 (Thomas Johnson Bridge) over the Patuxent River Bridge inspection - Single lane closure with flagging operation Sunday from 9 p.m. until 5 a.m. Monday.
 
Caroline/Talbot Counties

• MD 331 (Dover Road) at the Dover Bridge/Caroline/Talbot County lines Bridge construction/fill operations – Traffic to be reduced to a single lane guided by flaggers Mondays through Saturdays between 9 a.m. and 7 p.m. 
 
Carroll County

• MD 97 (Old Washington Road) between Streaker Road and the Howard County line Resurfacing - Single lane closure with flagging operation Sunday from 9 p.m. until 5 a.m. Monday.

Kent County

• MD 213 Drawbridge over the Chester River (Chester River) Bridge metal repairs – Single lane closures guided by a flagging operation. This will continue all week.
 
Montgomery County
 
 Outer loop of I-495 (Capital Beltway) between MD 97 (Georgia Avenue) and MD 185 (Connecticut Avenue) Bridge deck repair – Two lanes closed from 9 p.m. Friday (tonight) until 5 a.m. Monday.  Motorists should consider MD 200 (Intercounty Connector) as alternate.
 
Prince George’s County

• Eastbound US 50 between Lottsford Road and the Anne Arundel County line - Resurfacing – Single and double lane closures beginning 9 p.m. Sunday until 5 a.m. Monday.  
 
A look ahead at next week

Anne Arundel County

• Westbound US 50 between Oceanic Avenue and Whitehall Road Resurfacing – Double lane closures Monday from 9 p.m. to 5 a.m. Tuesday.
 
Baltimore County

• Southbound I-83 between MD 137 (Mt. Carmel Road) and Shawan Road Resurfacing – Single lane closures Mondays through Fridays after 10 a.m. until 3 p.m. and Saturdays between 6 a.m. and 2 p.m.

• Campbell Boulevard between Honeygo Boulevard and Franklin Square Drive (MDTA project) Express toll lane construction – Single lane closures starting June 13 from 6 a.m. to 5 p.m. Mondays through Fridays until late-August.

• MD 146 (Jarrettsville Pike) between MD 145 (Sweet Air Road/Paper Mill Road) and the Harford County line Resurfacing – Single lane closures guided by a flagging operations Mondays through Fridays from 9 a.m. until 3 p.m. and Saturdays between 6 a.m. and 2 p.m.
 
Calvert/St. Mary’s County Line

• MD 4 (Thomas Johnson Bridge) over the Patuxent River Deck patching - Single lane closure with flagging operation Tuesday and Wednesday nights 9 p.m. until 5 a.m. All lanes open by 5 a.m. Thursday.
 
Howard County

• US 40 (Baltimore National Pike) between the Little Patuxent River Bridge and St. John’s Lane Resurfacing – Single and double lane closures starting Tuesday and continuing until the project is complete. Work hours are 9 p.m. until 5 a.m.
 
Montgomery County

• Inner loop of I-495 (Capital Beltway) between the I-270 west spur and Seminary Road Resurfacing – Two lanes closed from 9 p.m. until 5 a.m.
 

###