(All Work is Weather Permitting)
Anne Arundel County
• Eastbound US 50 east of Severn River Bridge to Whitehall Road –
Resurfacing – Two lanes blocked from 9 p.m. Sunday until 5 a.m. Monday.
• MD 179 (St. Margarets Road) between Buschs Frontage Road (at the US 50 interchange) and MD 648 (Baltimore Annapolis Boulevard) –
Resurfacing – Single lane closures with a flagging operation. Grinding (removing the top layer of asphalt) will take place Mondays through Fridays between 9 a.m. and 3 p.m. and paving will occur at night Sundays through Thursdays between 8 p.m. and 5 a.m. each morning.
• MD 170 (Telegraph Road) between MD 174 (Donaldson Avenue) and Buckingham Road –
Resurfacing – Single lane closure with flagging operation from 9 p.m. Sunday until 5 a.m. Monday.
Baltimore County
• Northbound MD 147 (Harford Road) ramp to the inner loop of I-695 –
General routine maintenance – Temporary ramp closure beginning at 9 p.m. Sunday until 5 a.m. Monday. Traffic will use loop ramp as detour.
• Inner and outer loop of I-695 at Putty Hill Avenue –
Routine bridge inspection - Single lane closures on both loops of I-695 Sunday between 4 a.m. and 12 noon.
• Outer loop of I-695 Bridge over Northeast Creek (Prior to MD 702) –
Bridge rehabilitation of the outer loop of I-695 Bridge over Northeast Creek – near MD 702– The outer loop of I-695 will be closed and detoured onto MD 150 each night beginning at 10 p.m. All lanes will reopen by 5 a.m. each subsequent morning.
• Northbound US 1 Alternate (Washington Boulevard) between I-695 and Lansdowne Road –
Concrete bus pad installation - Single lane closure beginning at 5 a.m. Saturday until 5 a.m. Monday.
Caroline/Talbot Counties
•
MD 331 (Dover Road) at the Dover Bridge (Caroline/Talbot County line) –
Bridge construction/fill operations – Traffic to be reduced to a single lane guided by flaggers Mondays through Saturdays between 9 a.m. and 7 p.m.
Click here for more information.
Frederick County
• US 15 between US 340 and the Virginia line –
Pavement repair – Single lane closures beginning 8 p.m. Sunday until 5 a.m. Monday.
• Park Mills Road Bridge over I-270 –
Bridge deck repair– Single lane closures beginning at 8 p.m. Sunday until 5 a.m. Monday.
Howard County
• US 1 (Washington Boulevard) between Assateague Drive (just south of MD 175) to Gatewood Drive –
Patching/Grinding - Single lane closures all week between 9 p.m. and 5 a.m.
• MD 94 between Frederick Road and Old Frederick Road –
Resurfacing - Single lane closures all week between 9 p.m. and 5 a.m.
Kent County
• MD 213 Drawbridge over the Chester River (Chester River) –
Bridge metal repairs – Single lane closures guided by a flagging operation. This will continue all week.
Montgomery County
• I-495 (Capital Beltway) between MD 650 (New Hampshire Avenue) and US 20 (Colesville Road) –
Resurfacing – Single, double and triple lane closures between 8 p.m. and 5 a.m. each subsequent morning. Click here for more information.
• US 29 (Colesville Road) Bridge over I-495 (Capital Beltway) –
Routine bridge inspection – Double lane closures on the inner loop and outer loop of I-495 Sunday between 4 a.m. and 12 noon.
• Northbound MD 355 (Wisconsin Avenue) between Highland Avenue and Maple Avenue –
Resurfacing (private company/not SHA) – two lanes closed between 7 a.m. and 3 p.m.
Prince George’s County
• Northbound I-95/Outer loop of I-495 (Capital Beltway) at Ritchie Marlboro Road –
Bridge deck (driving surface) repair – Three right lanes to be blocked Sunday between 9 p.m. and 5 a.m. Monday.
• Eastbound US 50 between Lottsford Road and the Anne Arundel County line -
Resurfacing – Single and double lane closures beginning 9 p.m. Sunday until 5 a.m. Monday.
• US 301 (Blue Star Memorial Highway) between US 50 (John Hansen Highway) and Excalibur Road –
Resurfacing – Weekdays between 9 a.m. and 3 p.m. and overnights Sunday through Thursday from 9 p.m. until 5 a.m. Single and double lane closures.
• Inner and outer loop of I-95/I-495 (Capital Beltway) between MD 650 (New Hampshire Avenue) and MD 212 (Powder Mill Road) -
Guardrail installation and inlet construction - Single lane closure 9 p.m. Sunday until 5 a.m. Monday. This will continue all week.
• Inner and outer loop I-95/I-495 (Capital Beltway) Bridge over MD 4 (Pennsylvania Ave.) -
Bridge painting - Single lane closures beginning at 7 a.m. Saturday until 5 a.m. Sunday.
A look ahead at next week
Anne Arundel County
• Westbound US 50 between Oceanic Avenue to Logtown Road –
Resurfacing – Double lane closures Monday from 9 p.m. to 5 a.m. Tuesday.
Baltimore County
• MD 146 (Jarrettsville Pike) between MD 145 (Sweet Air Road/Paper Mill Road) and the Harford County line –
Resurfacing – Single lane closures guided by a flagging operations Mondays through Fridays from 9 a.m. until 3 p.m. and Saturdays between 6 a.m. and 2 p.m.
Carroll County
• MD 31 (New Windsor Road) between Medford Road and Main Street –
Resurfacing – Single lane closures guided by a flagging operation Mondays through Fridays between 9 a.m. and 3 p.m.
Frederick County
• MD 140 (Taneytown Pike) between US 15 and the Carroll County line - Paving - Single lane closure Saturday between 6 a.m. and 3 p.m.
Harford County
• MD 7 (Philadelphia Road) between MD 24 and Abingdon Road -
Resurfacing - Single lane closures guided by a flagging operation Mondays through Fridays between 9 a.m. and 3 p.m. and Sundays through Thursdays between 7 p.m. until 5 a.m.
Worcester County
• MD 528 (Coastal Highway) between 62nd Street (at the MD 90 approach) to the Delaware State line –
Resurfacing - Crews can work Mondays through -Thursdays in 10 or 12 hour shifts. Work should be completed by May 19.