SHA PLANNED LANE CLOSURE UPDATE (05/13/2016 – 05/16/2016)

MDOT SHA Logo

MDOT SHA Logo

(All Work is Weather Permitting)

Anne Arundel County

• Eastbound US 50 east of Severn River Bridge to Whitehall Road Resurfacing – Two lanes blocked from 9 p.m. Sunday until 5 a.m. Monday.

• MD 179 (St. Margarets Road) between Buschs Frontage Road (at the US 50 interchange) and MD 648 (Baltimore Annapolis Boulevard)Resurfacing – Single lane closures with a flagging operation.  Grinding (removing the top layer of asphalt) will take place Mondays through Fridays between 9 a.m. and 3 p.m. and paving will occur at night Sundays through Thursdays between 8 p.m. and 5 a.m. each morning.

• MD 170 (Telegraph Road) between MD 174 (Donaldson Avenue) and Buckingham RoadResurfacing – Single lane closure with flagging operation from 9 p.m. Sunday until 5 a.m. Monday.

Baltimore County

• Northbound MD 147 (Harford Road) ramp to the inner loop of I-695 General routine maintenance – Temporary ramp closure beginning at 9 p.m. Sunday until 5 a.m. Monday. Traffic will use loop ramp as detour.

 Inner and outer loop of I-695 at Putty Hill Avenue Routine bridge inspection - Single lane closures on both loops of I-695 Sunday between 4 a.m. and 12 noon.

 Outer loop of I-695 Bridge over Northeast Creek (Prior to MD 702)Bridge rehabilitation of the outer loop of I-695 Bridge over Northeast Creek – near MD 702– The outer loop of I-695 will be closed and detoured onto MD 150 each night beginning at 10 p.m.  All lanes will reopen by 5 a.m. each subsequent morning. 

• Northbound US 1 Alternate (Washington Boulevard) between I-695 and Lansdowne Road Concrete bus pad installation - Single lane closure beginning at 5 a.m. Saturday until 5 a.m. Monday.

Caroline/Talbot Counties

• MD 331 (Dover Road) at the Dover Bridge (Caroline/Talbot County line)Bridge construction/fill operations – Traffic to be reduced to a single lane guided by flaggers Mondays through Saturdays between 9 a.m. and 7 p.m.  Click here for more information.

Frederick County

• US 15 between US 340 and the Virginia line Pavement repair – Single lane closures beginning 8 p.m. Sunday until 5 a.m. Monday.

• Park Mills Road Bridge over I-270Bridge deck repair– Single lane closures beginning at 8 p.m. Sunday until 5 a.m. Monday.

Howard County

• US 1 (Washington Boulevard) between Assateague Drive (just south of MD 175) to Gatewood Drive Patching/Grinding - Single lane closures all week between 9 p.m. and 5 a.m.

• MD 94 between Frederick Road and Old Frederick Road Resurfacing - Single lane closures all week between 9 p.m. and 5 a.m.

Kent County

• MD 213 Drawbridge over the Chester River (Chester River) Bridge metal repairs – Single lane closures guided by a flagging operation. This will continue all week.

Montgomery County

• I-495 (Capital Beltway) between MD 650 (New Hampshire Avenue) and US 20 (Colesville Road) Resurfacing – Single, double and triple lane closures between 8 p.m. and 5 a.m. each subsequent morning.  Click here for more information.

• US 29 (Colesville Road) Bridge over I-495 (Capital Beltway) Routine bridge inspection – Double lane closures on the inner loop and outer loop of I-495 Sunday between 4 a.m. and 12 noon.

• Northbound MD 355 (Wisconsin Avenue) between Highland Avenue and Maple Avenue Resurfacing (private company/not SHA) – two lanes closed between 7 a.m. and 3 p.m.

Prince George’s County

• Northbound I-95/Outer loop of I-495 (Capital Beltway) at Ritchie Marlboro Road Bridge deck (driving surface) repair – Three right lanes to be blocked Sunday between 9 p.m. and 5 a.m. Monday.

 Eastbound US 50 between Lottsford Road and the Anne Arundel County line - Resurfacing – Single and double lane closures beginning 9 p.m. Sunday until 5 a.m. Monday.  

• US 301 (Blue Star Memorial Highway) between US 50 (John Hansen Highway) and Excalibur Road Resurfacing – Weekdays between 9 a.m. and 3 p.m. and overnights Sunday through Thursday from 9 p.m. until 5 a.m.  Single and double lane closures.

• Inner and outer loop of I-95/I-495 (Capital Beltway) between MD 650 (New Hampshire Avenue) and MD 212 (Powder Mill Road) - Guardrail installation and inlet construction - Single lane closure 9 p.m. Sunday until 5 a.m. Monday. This will continue all week.

• Inner and outer loop I-95/I-495 (Capital Beltway) Bridge over MD 4 (Pennsylvania Ave.) - Bridge painting - Single lane closures beginning at 7 a.m. Saturday until 5 a.m. Sunday. 

A look ahead at next week

Anne Arundel County

• Westbound US 50 between Oceanic Avenue to Logtown Road Resurfacing – Double lane closures Monday from 9 p.m. to 5 a.m. Tuesday.

Baltimore County

• MD 146 (Jarrettsville Pike) between MD 145 (Sweet Air Road/Paper Mill Road) and the Harford County line Resurfacing – Single lane closures guided by a flagging operations Mondays through Fridays from 9 a.m. until 3 p.m. and Saturdays between 6 a.m. and 2 p.m.

Carroll County

• MD 31 (New Windsor Road) between Medford Road and Main Street Resurfacing – Single lane closures guided by a flagging operation Mondays through Fridays between 9 a.m. and 3 p.m.

Frederick County

• MD 140 (Taneytown Pike) between US 15 and the Carroll County line Paving - Single lane closure Saturday between 6 a.m. and 3 p.m.

Harford County
 
• MD 7 (Philadelphia Road) between MD 24 and Abingdon Road - Resurfacing - Single lane closures guided by a flagging operation Mondays through Fridays between 9 a.m. and 3 p.m. and Sundays through Thursdays between 7 p.m. until 5 a.m.

Worcester County

• MD 528 (Coastal Highway) between 62nd Street (at the MD 90 approach) to the Delaware State line Resurfacing - Crews can work Mondays through -Thursdays in 10 or 12 hour shifts.  Work should be completed by May 19.

###