SHA PLANNED LANE CLOSURE UPDATE (04/29/2016 – 05/2/2016)

MDOT SHA Logo

MDOT SHA Logo

News update - The closure and temporary detour on MD 144 (Main Street) between MD 75 and Prospect Road in New Market, Frederick County has been postponed TFN.
 
(All Work is Weather Permitting)

Anne Arundel County

• Eastbound US 50 east of Severn River Bridge to Whitehall Road Resurfacing – two lanes blocked from 9 p.m. Sunday until 5 a.m. Monday.

Baltimore County

• I-95 between the Baltimore City line and the Howard County line Mobile pothole repair – Mobile operation beginning at 11 p.m. Sunday until 5 a.m. Monday.

• MD 7 (Philadelphia Road) between King Avenue and Campbell Blvd.Patching, grinding and paving– single lane closure guided by flaggers beginning at 9 p.m. Sunday until 5 a.m. Monday.
 
Baltimore/Howard County line

• Northbound and southbound I-95 Bridge over the Patapsco River and CSX TrackRoutine bridge inspection - Single lane closures Sunday between 4 a.m. and 12 noon.

Calvert County

• MD 2 (Solomons Island Road) at Mt. Harmony Road Intersection barrier shift – Restricted turning movements beginning 8 p.m. Sunday until 5 a.m. Monday.  

Frederick County

• MD 140 (Taneytown Pike) between US 15 and the Carroll County line - Patching - Single lane closure Saturday between 6 a.m. and 3 p.m.

• MD 75 (Green Valley Road) between I-70 and the Carroll County line Line striping – Single lane closures with flagging operations between 8 a.m. and 4 p.m. Saturday. 

• US 15 between US 340 and the Virginia line Pavement repair – Single lane closures beginning 8 p.m. Sunday until 5 a.m. Monday.

• Park Mills Road Bridge over I-270 Bridge deck repair– Single lane closures beginning at 8 p.m. Sunday until 5 a.m. Monday.

Howard County

• US 1 (Washington Boulevard) between Assateague Drive (just south of MD 175) to Gatewood Drive Patching/Grinding/Paving - Single lane closures all week between 9 p.m. and 5 a.m.

• MD 94 between Frederick Road and Old Frederick Road Resurfacing - Single lane closures all week between 9 p.m. and 5 a.m.

Howard/Prince George’s County line

• I-95 Bridges over Patuxent River (at the Howard/Prince George’s County line) - Bridge cleaning and painting - Single left and right northbound and southbound lane closures on Brooklyn Bridge Road between 7 a.m. Saturday until 5 p.m. and again at  5a.m. Sunday until 5 a.m. Monday.

Montgomery County
 
• Outer loop of I-495 Bridge over Northwest Branch (between MD 650 and MD 193)Bridge joint repair – Double left lane closures all week between 10 p.m. and 5 a.m.

• Outer loop of I-495 (Capital Beltway) Bridge over the I-270 spurRoutine bridge inspection – Single and double lane closures from 4 a.m. to 12 noon Sunday.

Prince George’s County

• Eastbound US 50 between Lottsford Road and the Anne Arundel County line - Resurfacing – Single and double lane closures beginning 9 p.m. Sunday until 5 a.m. Monday.  

• MD 212 (Powder Mill Road) Bridge over I-95 Routine bridge inspection- Double lane closures Sunday between 4 a.m. and 12 noon. 

• MD 4 (Pennsylvania Avenue) from MD 458 (Silver Hill Road) to Forestville Road - Median construction - Single lane closure beginning at 9 p.m. Sunday until 5 a.m. Monday.  This will continue all week.

• Inner and outer loop of I-95/I-495 (Capital Beltway) between MD 650 (New Hampshire Avenue) and MD 212 (Powder Mill Road) - Guardrail installation and inlet construction - Single lane closure 9 p.m. Sunday until 5 a.m. Monday. This will continue all week.

• Inner and outer loop I-95/I-495 (Capital Beltway) Bridge over MD 4 (Pennsylvania Ave.) - Bridge painting - Single lane closures beginning at 7 a.m. Saturday until 5 a.m. Sunday. 

A look ahead at next week
 
Allegany County

• MD 36 (New George’s Creek Road) Bridge over I-68 Routine bridge inspection– Single lane closures on Monday and Tuesday between 9 a.m. and 3 p.m.

Baltimore County

• Inner loop I-695 Bridge over Milford Mill Road Traffic shift for bridge replacement project – Beginning with single lane closures at 7 p.m. Tuesday, Double lane closures at 10 p.m. and triple lane closures at 12 midnight.  All lanes open by 5 a.m. Wednesday.
 
 
• Outer loop of I-695 at MD 150 (Eastern Boulevard) Bridge rehabilitation of the outer loop of I-695 Bridge over Northeast Creek – near MD 702– Beginning Wednesday, May 4, the outer loop of I-695 will be closed and detoured onto MD 150 each night beginning at 10 p.m.  All lanes will reopen by 5 a.m. each subsequent morning.  This will go on through May 12.
 
Caroline/Talbot Counties

• MD 331 (Dover Road) at the Dover Bridge/Caroline/Talbot County lines Pavement repairs – MD 331 to temporarily close at 8 p.m. Tuesday until 5 a.m. Wednesday.  Click here for detour routes.
Kent County

• MD 213 Drawbridge over the Chester River (Chester River)Bridge metal repairs – Single lane closures guided by a flagging operation. This will continue all week.

Queen Anne’s County

• MD 405 (Price Station Road) between MD 19 (Roberts Station Road) and US 301Resurfacing – Daily single lane closures guided by a flagging operation starting Monday.  Crews will work between 6 a.m. and 6 p.m. for approximately one month.

Worcester County

• MD 528 (Coastal Highway) between 62nd Street (at the MD 90 approach) to the Delaware State line Resurfacing - Crews can work Mondays through -Thursdays in 10 or 12 hour shifts.  Work should be completed by May 19th.

###