All Work is Weather Dependent
Real-Time travel conditions and live traffic cameras are available - md511.maryland.gov.
Major Weekend Lane Closures
Anne Arundel County
• Northbound I-895 Bridge over the Patapsco Flats (Between MD 295 and the I-97/MD spur) – Bridge rehabilitation – (MDTA project) 24/7 right lane closure until summer 2019.
Baltimore County
• Inner loop of I-695 (Baltimore Beltway) ramp to southbound I-83 (Jones Falls Expressway) - Routine bridge inspection – Ramp closure and detour (using Falls Road toward Joppa Road – U-turn and back to SB I-83) Sunday between 4 a.m. and 7 a.m. new
Montgomery County
• Northbound I-270 between Democracy Boulevard and Montrose Road - Resurfacing - Single and double lane closures Sunday nights through Friday mornings 8 p.m. and 5 a.m.
• US 29 (Colesville Road) between I-495 (Capital Beltway) and MD 97 (Georgia Avenue) - WSSC water line replacement project - Single and double lane closures Mondays through Fridays between 9:30 a.m. to 3:30 p.m. and Sundays through Friday mornings between 9 p.m. and 5 a.m. Single lane closures Saturday between 9 a.m. and 5 p.m.
Queen Anne’s County
• MD 213 (Church Hill Road) between Schrader Road and the Chester River Bridge – Pavement repair (patching) – Single lane closure with flagging operation Friday and Saturday between 7 p.m. and 6 a.m. each night. new
Talbot County
• MD 322 (Easton Parkway) and MD 33 (Saint Michaels Road) in the Town of Easton – Pavement repair (patching) – Single lane closure with flagging operation beginning Sunday and continuing until completion between 7 p.m. and 6 a.m. each night. new
Long-Term Closures
Baltimore City
• HIGH-IMPACT - (MDTA Project) - I-895 (Baltimore Harbor Tunnel Throughway) between the tunnels and Boston Street/O’Donnell Street (exit 11) and the Holabird Avenue exit. – Bridge rehabilitation project – Northbound I-895 to close on November 27 and two-way traffic using southbound I-895. Use I-95 (Fort McHenry Tunnel) or I-695 (Francis Scott Key Bridge) as alternate routes. Project to last until 2021.
Baltimore County
• HIGH-IMPACT - Outer loop of I-695 (Baltimore Beltway) ramp to Edmonson Avenue – Ramp closure for widening project – Motorists will be guided to I-695/MD 144 (Frederick Road) interchange and back to the inner loop I-695 to Edmonson Avenue Deerco Road to the I-83/Timonium Road interchange. In approximately three weeks, the Edmonson Avenue ramp to the outer loop I-695 will also close. Local detours.
• Eastbound Padonia Road ramp to northbound I-83 – Ramp closure for bridge replacement project – Motorists will be guided to Deerco Road to the I-83/Timonium Road interchange.
Frederick County
• Eastbound US 40 Alternate (Old National Pike) between Fern Lane and Ridge Road – Roadside slope repair – Right truck “climbing” lane and shoulder closed.
Prince George’s County
• US 301 (Crain Highway) between Frank Tippett Road and Trumps Hill Road - Gas pipeline construction and installation (Washington Gas project) – Single right lane closure through spring 2019.
Somerset/Worcester County line
• US 13 (Ocean Highway) northbound over Pocomoke River at the Worcester/Somerset county line – Bridge work – Northbound US 13 bridge over Pocomoke River has been reduced to one 12-foot lane for bridge work through the late-fall.
Wicomico County
• MD 349 (Nanticoke Road) Rockawalkin Road – Washout/major road repair – MD 349 is closed and detoured until early 2019.
MAJOR Closures for Next Week
Anne Arundel County
• MD 181 (6th Street) Bridge over Spa Creek – Routine drawbridge maintenance – Occasional brief test openings on Wednesday, December 5 between8:30 a.m. and 2:30 p.m. new
Baltimore County
• Southbound I-83 (Baltimore-Harrisburg Expressway) at Padonia Road – Lane shifts for bridge replacement project – On Monday, December 3, traffic will be shifted on southbound I-83 and will include single and double closures. All lanes will open by 5 a.m. Tuesday. This work is temperature permitting. new
Carroll County
• MD 86 (Lineboro Road) between MD 30 (Hanover Pike) and the Pennsylvania line – Pavement repair – Single lane closures guided by flaggers Monday through Friday between 8 a.m. and 4 p.m. Complete early-December.
Frederick County
• MD 355 (Urbana Pike) Bridge over the Monocacy River – Bridge approach paving – Single lane closures guided by flaggers beginning Monday, December 3 between 8 a.m. and 4 p.m. new date
• Park Mills Road Bridge over I-270 – Bridge approach paving – Single lane closures guided by flaggers beginning Monday, December 3 between 8 a.m. and 4 p.m. new date
Montgomery County
• Northbound I-270 at MD 109 (Old Hundred Road) – Paving/line striping – On northbound I-270 - Single lane closures Mondays through Fridays between 9 a.m. and 11 a.m.
• MD 97 (Georgia Avenue) between north of Goldmine Road and south of Holiday Drive - Bypass construction – Single lane closures Mondays through Fridays between 8 a.m. and 3 p.m.
Washington County
• I-81 between the Potomac River Bridge (West Virginia line) and MD 68/MD 63 (Lappans Road) – Highway widening project – Left lane closures Sunday nights through Friday mornings between 9 p.m. and 5 a.m. There may be occasional, brief total closures to move equipment and material into place between 2 a.m. and 4 a.m.