For A listing of ALL Major MDOT SHA Projects spring through fall, click here for e-Road Ready 2017, an interactive map of major MDOT SHA projects.
Major Weekend Lane Closures
Anne Arundel County
· US 50 on the Severn River Bridge – BGE utility work – Single lane closures Sundays through Thursday between 9 p.m. and 5 a.m.
Baltimore County
· I-95 between US 1 and the Baltimore City/County line – Resurfacing/pavement patching/milling – Single and double lane closures Sundays through Thursday between 9 p.m. and 5 a.m.
· US 40 (Baltimore National Pike) between Johnnycake Road/Academy Road and St. Agnes Lane – Emergency roadwork/pipe replacement. Left lane of eastbound US 40 closed through 5 am Monday, August 28
· I-695 between I-95 and MD 7 (Philadelphia Road) (MDTA project) – Resurfacing – Single and double lane closures Sundays through Thursday between 9 p.m. and 5 a.m.
Carroll County
· MD 30 Business (Main Street) between North Woods Trail and the CSX Railroad tracks – Urban reconstruction project – Single lane closures with a flagging operation Mondays through Saturdays between 7 a.m. and 8 p.m.
Montgomery County
• Outer loop of I-495 between Seminary Road and the I-270 spur – Resurfacing project - Single and double lane closures between 9 p.m. Sunday until 5 a.m. Monday.
· Inner and outer loop of I-495 (Capital Beltway) Bridge over MD 185 (Connecticut Avenue) - Bridge cleaning and painting - Single lane closures Mondays through Fridays between 9 a.m. and 3 p.m. and Sundays through Thursdays between 9 p.m. and 5 a.m.
· MD 97 (Georgia Avenue) at MD 28 (Norbeck Road) – Intersection improvement project/utility relocation - Single lane closures Mondays through Fridays between 9 a.m. and 4 p.m. and Sundays through Thursdays between 9 p.m. and 5 a.m.
· MD 187 (Old Georgetown Road) at Lincoln Drive – Utility work/private - Single and double lane closures in each direction Saturdays from 9 a.m. to 9 p.m. through September 16.
· MD 97 (Georgia Avenue) between White Drive and MD 390 (16th street) - Road resurfacing. Single and double lane closures, overnight, Sunday through Thursday, 9 p.m. to 5 a.m.
· MD 187 (Old Georgetown Road) between Johnson Avenue and Sonoma Road - Sidewalk ramp construction, utility work and concrete bus pad installations - Single and double lane closures Mondays through Fridays from 10 a.m. until 8 p.m. and weekends (for concrete work) Fridays beginning at 9 p.m. until 5 a.m. Mondays.
· Southbound MD 355 (Wisconsin Avenue) between Norfolk Avenue and Bethesda Avenue – Building demolition/hauling operation by private contractor – Southbound MD 355 to be closed, as well as the right lane on northbound MD 355, beginning at 11 p.m. Saturday until 6 a.m. Sunday.
· MD 355 (Wisconsin Avenue) between Cheltenham Drive and Avondale Street. Private/commercial crane operation. Southbound traffic lane shifts to northbound MD 355 with sidewalk closures Sunday August 27 9 pm through 5 am Monday, August 28.
· MD 355 (Rockville Pike) between Wilson Drive and Woodmont Avenue - Montgomery County Crossing Project clearing and curb work - Single and double lane closures in each direction beginning Friday at 9 p.m. until 5 a.m. Monday.
· US 29 (Colesville Road) between I-495 (Capital Beltway) and MD 97 (Georgia Avenue) - WSSC water line replacement project - Single and double lane closures Mondays through Fridays between 9:30 a.m. to 3:30 p.m. and Sundays through Friday mornings between 9 p.m. and 5 a.m. Weekend lane closures are possible between 9 a.m. and 9 p.m.
Prince George’s County
• MD 5 (Branch Avenue) between Suitland Parkway and Curtis Drive. Resurfacing. Single and double lane closures, mentioned work zone. Permissible work and lane closure hours are weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 8 p.m. to 5 a.m.
· Westbound US 50 (John Hanson Highway) between the Anne Arundel County Line and Lottsford Vista Road - Resurfacing – Single, double and triple lane closures Fridays through Mondays between 10 p.m. and 5 a.m. and double lane closures Sundays through Thursdays between 10 p.m. and 5 a.m.
· MD 197 (Laurel Bowie Road) between MD 450 (Annapolis Road) and US 50. Road resurfacing. Single northbound and southbound lane closures overnight, Sunday through Thursday 9 pm to 5 am.
· Inner loop of I-495 (southbound I-95) Bridge over MD 450 (Annapolis Road) - Bridge deck repairs - Single MD 450 lane closures Mondays through Saturdays between 9 a.m. and 3 p.m. and double I-495/I-95 lane closures Sundays through Thursdays between 9 p.m. and 5 a.m. through the end of August.
· Inner and outer loops (north and southbound I-95) of I-95/I-495 (Capital Beltway) between MD 337 (Allentown Road) and MD 4 (Pennsylvania Avenue) – Shoulder construction/Interchange work – Single and double lane closure in each direction Sundays through Fridays from 7 p.m. until to 5:00 a.m.
· MD 202 (Landover Road) between US 50 and MD 450 (Annapolis Road) – Resurfacing - Single and double lane closures Mondays through Fridays between 9 a.m. and 3 p.m. and Sundays through Thursdays between 8 p.m. and 5 a.m.
· MD 210 (Indian Head Highway) between I-295/I-495 ramps and Palmer Road - Interchange construction - Single lane closures Sunday nights to Friday mornings between 8 p.m. and 5 a.m. and Mondays through Saturdays between 9 a.m. to 3 p.m.
· MD 337 (Allentown Road) between Forestville Road and Suitland Road - Storm water infrastructure work - Single lane closures Mondays through Saturdays between 9 a.m. and 3 p.m. and Sundays through Friday mornings between 8 p.m. and 5 a.m.
Long-Term Closures
Baltimore County
· MD 147 (Harford Road) at Glen Arm Road/Mt. Vista Road – Roundabout construction –Glen Arm Road is closed and detoured.
Charles County
• MD 234 (Budds Creek Road) Bridge over Gilbert Swamp Run – Bridge replacement – Single lane closure guided by a temporary traffic signal until spring 2018.
Dorchester County
· MD 14 (Rhodesdale-Eldorado Road) Bridge over Marshyhope Creek (Brookview Bridge) Cleaning/Painting/general repairs - Single lane closures and flagging across the bridge from sunrise to sunset.
Frederick County
· MD 194 (Woodsboro Pike) Bridge over Little Pipe Creek (at the Carroll County line) – Bridge replacement project –Bridge closed for 10 weeks for expedited replacement on June 17 until September 4, 2017.
Wicomico County
· Southbound US 13 ramp/bridge to the eastbound/southbound Salisbury Bypass – Bridge/ramp rehabilitation – Total closure and detour until early September to expedite the work.
A look ahead at next week
Baltimore County
· Southbound MD 129 (Park Heights Avenue) between MD 133 (Old Court Road) and Baltimore City line (BGE project) – BGE Gas line replacement project – Single lane closures Mondays through Fridays between 9 a.m. until 3 p.m.
Caroline/Queen Anne’s/Talbot counties
· MD 404 (Queen Anne Highway/Shore Highway) between US 50 (Ocean Gateway) and MD 309 (Starr Road) and MD 480 (Ridgely Road) and the Denton Bypass – Highway widening – Single lane closures with flagging operations possible in each direction of MD 404 12 noon Mondays until 12 noon Fridays. For an updated list of lane closures on this project, click here.
Montgomery County
· MD 28 (Darnestown Road) between MD 124 (Quince Orchard Road) and Argosy Road - Sidewalk construction/part of safety/resurfacing project - Single eastbound lane closures Mondays through Fridays from 10 a.m. until 4 p.m.
· MD 97 (Georgia Avenue) at Randolph Road - Interchange construction - Single lane closures in both directions of both roads, Mondays through Saturdays between 9 a.m. and 3 p.m. and Sundays through Friday mornings between 10 p.m. and 5 a.m.
• Northbound MD 355 (Frederick Road) at Chestnut Street - Water utility work - Single left lane closure – Wednesday and Thursday (8/23 and 8/24) between 9 p.m. and 5 a.m.